Questions_that_have_been_answered_14Oct16xlsx.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- W31P4Q-16-R-0036
About this file
The following is responses to contractor's questions dated 14Oct16.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Who asked | Email Address | When | Question | Sent to Requiring activitiy | Q answered | Notes |
| Della Edmonds/ Joint Logistics Managers, Inc (JLMI) | dedmonds@jlmiva.com | 9/22/16 | On page 5 of Attachment 10, it states: “b. All files shall be in searchable PDF text format (not a scanned version) and in Microsoft Word, compatible with Microsoft Office.” / Question: Can Volume IV be in PDF scanned? Since they have to be signed I know of no other way to submit them. | N/A | Yes, use PDF only. | |
| Ron Fischer/ HCI Integrated Solutions | rfischer@hc.inc.net | 9/23/16 | In order to provide a level playing field and consistent pricing, can the Government provide the most likely location where this maintenance will occur? | 9/26/16 | RECAP/GATS response: Ft. Bliss, Korea, and Japan. | |
| Ron Fischer/ HCI Integrated Solutions | rfischer@hc.inc.net | 9/23/16 | In order to provide a level playing field and consistant pricing, can the Government provide the most likely location at which this maintenance performance will occur? | 9/26/16 | RECAP/GATS response: Ft. Bliss, Korea, and Japan. | |
| Ron Fischer/ HCI Integrated Solutions | rfischer@hc.inc.net | 9/23/16 | Can the Offeror assume that the principal location for performance of this operation is Ft. Bliss with TDY to other locations as required? | 9/26/16 | RECAP/GATS response: Ft. Bliss, Korea, and Japan. | |
| Ron Fischer/ HCI Integrated Solutions | rfischer@hc.inc.net | 9/23/16 | Will this maintenance occur in a unit's maintenance facility or at an installation facility? | 9/26/16 | HIMARS: does have unit location maintenace. RECAP is as well. | |
| Ron Fischer/ HCI Integrated Solutions | rfischer@hc.inc.net | 9/23/16 | With respect to the road march and emplacement, who provides drivers, escort vehicles for the Patriot, road clearances if required, areas to road march and set up? Question 42 (from the Draft RFP Q&A session) states there is no requirement to drive military equipment but PWS C.4.3.9 Operation of Equipment states otherwise (i.e., "A minimum of 2 individuals shall possess a Class A Operators Permit and a minimum of 3 individuals shall possess a Class B, or greater, Operators Permit.") | 9/26/16 | RECAP response: For PATRIOT the Unit will be responsible for moving over the road. This contract will be responsilbe for moving equipment around on the site, and loading/off-loading onto carriers. | |
| Ron Fischer/ HCI Integrated Solutions | rfischer@hc.inc.net | 9/23/16 | Who is authorized to sign High Priority requests for the Contractor since they are not a military commander? Contractor Site Lead? | 9/26/16 | RECAP response: For PATRIOT RECAP the LTPO Ft Bliss Field Office Chief will coordinate with the gaining Unit for high priority requests | |
| Ron Fischer/ HCI Integrated Solutions | rfischer@hc.inc.net | 9/23/16 | The Lower Tier Project Office consists of the Patriot, MEADS, PAC-3 and Joint Tactical Ground Station (JTAGS). However, The PWS only references the Patriot. Is the Patriot the only system for which the contractor has maintenance responsibilty in the three CLINs? | 9/26/16 | RECAP response: Yes, PATRIOT is the only LTPO program on this SOW | |
| Garry Waggoner/ Strategic Defense Solutions | g.waggoner@sdefenses.com | 9/26/16 | Reference: PWS Para C.1/ Question: Can the Government provide annual workload data history for the HIMARS Fire Control System (FCS), Launcher Module (LM) and the XM 1140 HIMARS chassis? | No, as the contract will not repair HIMARS FCS, LM, and chassis. | ||
| Garry Waggoner/ Strategic Defense Solutions | g.waggoner@sdefenses.com | 9/26/16 | Reference Attachment 0010 (Section L). Will the government permit the use of 12-point Times New Roman as an acceptable font. | Follow the FRP guidance. | ||
| Garry Waggoner/ Strategic Defense Solutions | g.waggoner@sdefenses.com | 9/26/16 | Reference Attachment 0010 (Section L). Will the government permit the use of tabloid sized (11 X 17) for spreadsheets within the Cost Volume? | Follow the FRP guidance. | ||
| Garry Waggoner/ Strategic Defense Solutions | g.waggoner@sdefenses.com | 9/26/16 | Reference Attachment 0011 (Section M). This effort has been long running with little change in performance requirements over the last many years. Will the government include evaluation criteria that recognizes innovation or a superior approach to Warfighter support? | Follow the FRP guidance. |