This document contains questions and answers related to solicitation number W15QKN-22-R-0031 for the load, assembly and pack of 60mm, 81mm, and 120mm full range practice cartridges. The solicitation requires the loading, assembly and packing of 60mm M769, 81mm M879A1 and 120mm M931 full range practice cartridges that simulate high explosive cartridges for training purposes. The cartridges contain inert shells and practice fuzes that produce flash and smoke upon impact without energetic fill. The contractor will load the cartridges with four increments, pack them individually into fiber containers, and bundle the containers into wooden boxes for delivery. The questions and answers provide clarification on presentation slide requirements, use of charts and fonts, material grades, and engineering and drawing specifications.

View the file

Other files

File Type Posted
W15QKN-22-R-0031 - Question 39.docx DOCX document
W15QKN22R0031-0007.pdf PDF
W15QKN22R0031-0006.pdf PDF
Updated - Attachment 0001 60MM-81MM-120MM FRPC Price Matrix with EPA.xlsx XLSX spreadsheet
W15QKN22R0031-0005.pdf PDF
W15QKN22R0031-Amendment 0004.pdf PDF
W15QN-22-R-0031 - Amendment 003 - Questions 29-34.pdf PDF
Attachment 0001 60MM-81MM-120MM FRPC Price Matrix 25 April 2022.xlsx XLSX spreadsheet
W15QKN22R0031-Amendment 0002.pdf PDF
Exhibit A - DD1423 CDRL Portfolio 26 April 2022.pdf PDF
W15QKN-22-R-0031 Questions 21-23.docx DOCX document
W15QKN22R0031 Question 14.docx DOCX document
W15QKN22R0031 - Question Set 6-13.docx DOCX document
W15QKN22R0031-0001.pdf PDF
W15QKN22R0031 - Question Set 1-4.pdf PDF
Attachment 0010 - DD2357 Hazardous Component Safety Data Statements (HCSDS) for 81mm.pdf PDF
W15QKN22R0031.pdf PDF
Attachment 0017 - DD2345 - Militarily Critical Technical Data Agreement Template.pdf PDF
Attachment 0016 - AMSTA-AR 1350 - Technical Data Request Questionnaire.pdf PDF
Attachment 0011 - DD2357 Hazardous Component Safety Data Statements (HCSDS) for 60mm.pdf PDF
Attachment 0005 - Form 3002 Clearance of Tech Information.pdf PDF
Attachment 0014 - Non-Disclosure and Non-Use Agreement.pdf PDF
Attachment 0002 - Contract Quality Requirements.docx DOCX document
Attachment 0007 - DD2357 Hazardous Component Safety Data Statements (HCSDS) for 120mm.pdf PDF
Attachment 0003 - Additional Solicitation and Contract Requirements.docx DOCX document
Attachment 0001 60MM-81MM-120MM FRPC Price Matrix.xlsx XLSX spreadsheet
Attachment 0009 - Production-Delivery Tracking Template.xlsx XLSX spreadsheet
Attachment 0008 - GFM Product Quality Template.xlsx XLSX spreadsheet
Attachment 0006 Certificate of Destruction.docx DOCX document
Attachment 0015 - Past Performance Questionnaire.docx DOCX document
Exhibit A - DD1423 CDRL Portfolio.pdf PDF
Attachment 0004 - SF LLL Disclosure of Lobbying Activities.pdf PDF
Attachment 0018 - Monthly Reporting Form for GFM (CDRL A020).xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 15: Are videos allowed as part of the oral presentation slides?

Answer 15: Yes, videos are allowed as part of the oral presentation. Embedded videos on a slide are acceptable. Slides that only contain a video are acceptable

If so:

a. Is there a time limit?

Answer: No, there is no time limit for a video, but that will go towards the total time limit for the oral presentation.

b. Would each video count as bullet point or a whole slide?

Answer: One video is allowed per slide.

Question 16: Are charts that list items such as: subcontractors, equipment, and CFM allowed to be incorporated into the slides?

Answer 16: Yes, charts that list items such as: subcontractors, equipment, and CFM are allowed to be incorporated into the slides.

If so:
a. Can the font size on the information inside the charts be reduced from the 18 fontrequirement?
Answer: The minimum font size for the slides is 18. However, for charts, illustrations, graphics,and tables, the minimum font size is 8. Also, the minimum font size for the IMS is 8. This answersupersedes the answer to question 10 that was already posted.
b. Would one chart count as one bullet point the slide?
Answer: Yes, one chart counts as one bullet point in the slide

Question 17: In the TDP for drawing 12983039 BODY, BUSHING there is no call out for the grade of material (Example: Grade 4140). Would you be able to tell us what grade of material should be used for this part?

Answer 17: No specific grade is necessary. The part simply needs to be either ASTM A322 or Cold-Finished per ASTM A108 and it must meet the characteristics called out on note 2 of the drawing.

Question 18: Reference Solicitation, Section C, paragraphs C.4.2.4.7 and C.4.2.4.8, page 56 requires support of undefined engineering efforts. Are these costs to be borne by the Contractor or agreed upon at a later date?

Answer 18: These costs are not to be borne by the contractor. If an undefined engineering effort is identified, it will be mutually negotiated and agreed upon by the Government and the contractor.

Question 19: Reference Drawing 12983039 Rev G - Note 2 contains a requirement of "BGN 205-241". We believe this resulted from a typo in ECP R18J2027. Please confirm that the requirement is "BHN 205-241".

Answer 19: Yes, the requirement is BHN 205-241.

Question 20: Reference Drawing 12993719 Rev D - Zone B-6 contains a diametrical requirement of Ø1.10 +.00/-.00. Rev D incorporated ECP R18J2012 which revised the requirement from Ø1.100-.020 to Ø1.10 +.00/-.01. Please verify that the requirement is Ø1.10 +.00/-.01.

Answer 20: Yes, the requirement is Ø1.10 +.00/-.01.