W15QKN22R0031 - Question Set 1-4.pdf

PDF 83 KB Posted

Attached to
Load, Assembly and Pack (LAP) of 60mm, 81mm, and 120mm Full Range Practice Cartridges
Solicitation number
W15QKN-22-R-0031
Issued by

About this file

This document contains a question and answer file related to a solicitation for the load, assembly and pack of 60mm, 81mm, and 120mm full range practice cartridges. The United States Army Contracting Command New Jersey, in support of the Office of the Project Manager Combat Ammunition Systems, is seeking the 60mm M769, 81mm M879A1 and 120mm M931 full range practice cartridges. The cartridges consist of a hollow shell body with no energetic fill and, except for color, look identical to the high explosive cartridges. The practice cartridges utilize a center vent tube to simulate weight and allow the fuze signature to vent through holes in the aft shell body. They accept specific practice fuzes for each caliber that contain a spotting charge producing a flash/bang/smoke signature upon ground impact. The plastic ogive simulates the contour and functions of the multi-option fuze used on service mortars. Currently, four increments are used as the propelling charge system initiated by the ignition cartridge. The cartridges are packed one to a fiber container, which are packed into a wooden wirebound box.

View the file

Other files

File Type Posted
W15QKN-22-R-0031 - Question 39.docx DOCX document
W15QKN22R0031-0007.pdf PDF
W15QKN22R0031-0006.pdf PDF
Updated - Attachment 0001 60MM-81MM-120MM FRPC Price Matrix with EPA.xlsx XLSX spreadsheet
W15QKN22R0031-0005.pdf PDF
W15QKN22R0031-Amendment 0004.pdf PDF
W15QN-22-R-0031 - Amendment 003 - Questions 29-34.pdf PDF
Attachment 0001 60MM-81MM-120MM FRPC Price Matrix 25 April 2022.xlsx XLSX spreadsheet
W15QKN22R0031-Amendment 0002.pdf PDF
Exhibit A - DD1423 CDRL Portfolio 26 April 2022.pdf PDF
W15QKN-22-R-0031 Questions 21-23.docx DOCX document
W15WKN-22-R-0031Question Set 15-20.docx DOCX document
W15QKN22R0031 Question 14.docx DOCX document
W15QKN22R0031 - Question Set 6-13.docx DOCX document
W15QKN22R0031-0001.pdf PDF
Attachment 0010 - DD2357 Hazardous Component Safety Data Statements (HCSDS) for 81mm.pdf PDF
W15QKN22R0031.pdf PDF
Attachment 0017 - DD2345 - Militarily Critical Technical Data Agreement Template.pdf PDF
Attachment 0016 - AMSTA-AR 1350 - Technical Data Request Questionnaire.pdf PDF
Attachment 0011 - DD2357 Hazardous Component Safety Data Statements (HCSDS) for 60mm.pdf PDF
Attachment 0005 - Form 3002 Clearance of Tech Information.pdf PDF
Attachment 0014 - Non-Disclosure and Non-Use Agreement.pdf PDF
Attachment 0002 - Contract Quality Requirements.docx DOCX document
Attachment 0007 - DD2357 Hazardous Component Safety Data Statements (HCSDS) for 120mm.pdf PDF
Attachment 0003 - Additional Solicitation and Contract Requirements.docx DOCX document
Attachment 0001 60MM-81MM-120MM FRPC Price Matrix.xlsx XLSX spreadsheet
Attachment 0009 - Production-Delivery Tracking Template.xlsx XLSX spreadsheet
Attachment 0008 - GFM Product Quality Template.xlsx XLSX spreadsheet
Attachment 0006 Certificate of Destruction.docx DOCX document
Attachment 0015 - Past Performance Questionnaire.docx DOCX document
Exhibit A - DD1423 CDRL Portfolio.pdf PDF
Attachment 0004 - SF LLL Disclosure of Lobbying Activities.pdf PDF
Attachment 0018 - Monthly Reporting Form for GFM (CDRL A020).xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: Do we understand correctly that OP1 are FFP and OP2 to OP5 are equivalent to NTE pricing?

Answer 1: All pricing for Ordering Period 01 (OP1) through Ordering Period 5 (OP5) should be Firm Fixed Price (FFP). The prices awarded and put on contract will be utilized when competing each delivery order for the life of the contract. Contractors can propose lower pricing than what was put on contract when submitting proposals for subsequent delivery orders.

Question 2: Could you please explain the scope of work related to the guaranteed minimum amount of $50,000.00?

Answer 2: The scope of work could involve a specific quantity, a First Article Test (FAT), inert models, or process flow diagrams. This will be determined after award based on Army requirements.

Question 3: We have identify a discordance between the information included in the RFP and the Att.

0001 regarding the price to provide for CLIN 5000 – CDRLS-DD1423 or as mentioned in the RFP the CLIN 5000 shall not Separately price (NSP). Thanks.

Answer 3: The price matrix listing the CDRL 5000 as one lot and the solicitation listing CDRL 5000 as NSP should be considered the same thing. All CDRLs should be priced together.

Question 4: We have been experiencing a major uptick in price of materials; due to the increase in the price of raw materials. We have not been able to secure firm pricing from some of our suppliers/vendors.

Would it possible to include an EPA clause (such as 52.216-4 Economic Price Adjustment-Labor and Material)?

Answer 4: Due to the nature of this procurement being competitive with the possibility of multiple awards, an EPA clause will not be considered at this time.

File details come from the government source that posted it. Updated .