W15QKN17R0017-0003.pdf

PDF 51 KB Posted

Attached to
Miscellaneous Ammunition Federal contract opportunity
Solicitation number
W15QKN17R0017
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Miscellaneous Ammunition, newest first.
File Type Posted
W15QKN17R0017-0008.pdf PDF
W15QKN17R0017-0007.pdf PDF
W15QKN17R0017-0006.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
W15QKN17R0017-0005.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
W15QKN17R0017-0004.pdf PDF
W15QKN17R0017-0002.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
Attachment_0004_-_General_Specification_for_Non_Standard_Ammunition_10_Feb_2017.pdf PDF
Attachment_0007_-_General_Specification_for_Non_Standard_Rocket_Propelled_&_Spin_Stabilized_Grenade_Ammunition_10_Feb_2017.pdf PDF
Attachment_0006_-_General_Specification_for_Non_Standard_Small_Caliber_Ammunition_10_Feb_2017.pdf PDF
W15QKN17R0017-0001.pdf PDF
Attachment_0008_-_General_Specification_for_Non_Standard_Mortar_Systems_10_Feb_2017.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
Attachment_0005_-_General_Specification_for_Non_Standard_Mortar_Ammunition__10_Feb_2017.pdf PDF
Attachment_0007_-_General_Specification_for_Non_Standard_Rocket_Propelled_&_Spin.pdf PDF
Attachment_0004_-_General_Specification_for_Non_Standard_Ammunition.pdf PDF
Exhibit_A_-_CDRLs.pdf PDF
Attachment_0010_-_Delivery_Status_Report_Template.xlsx XLSX spreadsheet
Attachment_0009_-_Status_Report_Template.xls XLS spreadsheet
Attachment_0015_-_INME-PIC-IM_Form_3002.pdf PDF
W15QKN17R0017.pdf PDF
Attachment_0012_-_NSA_Security_SOW.pdf PDF
Attachment_0008_-_General_Specification_for_Non_Standard_Mortar_Systems.pdf PDF
Attachment_0011_-_NSA_Safety_SOW.pdf PDF
Attachment_0005_-_General_Specification_for_Non_Standard_Mortar_Ammunition.pdf PDF
Attachment_0014_-_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
Attachment_0003_-_Delivery_Order_Proposal_Form.xlsx XLSX spreadsheet
Attachment_0006_-_General_Specification_for_Non_Standard_Small_Caliber.pdf PDF
Attachment_0013_-_Past_Performance_Questionnaire.doc DOC document
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0003 2017FEB22

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

MELISSA M ARDIS

EMAIL: MELISSA.M.ARDIS.CIV@MAIL.MIL

W15QKN-17-R-0017

2017JAN27

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 18

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MELISSA M ARDIS

Buyer Office Symbol/Telephone Number: ACC-NJ-MA/(973)724-3294

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0003 is to:

1. Extend the due date of past performance questionnaires/list of POCs to within sixty (60) calendar days of the release of the RFP.

Section L.4.3.2(5) has been amended to reflect this extension.

2. Correct the reference from "D.4.3" in L.4.4.2 to "M.3.4.4."

3. Revise SOW sections 3.3.2.1.3.d. and 3.3.2.1.3.f.

4. Provide the following questions and answers:

Question 1: Ref Solicitation L.4.4.2 and L.4.4.8 - Please confirm that the Small Business Participation Factor Volume and SB

Subcontracting Plan (if required) must utilize Attachment 0001, Section B Attachment rather than Attachment 0003 to calculate the total contract price. If so, this results in a SB Subcontracting plan which includes the entire IDIQ CLIN ceiling unit prices at maximum quantity and with no transportation costs, which is not necessarily reflective of any accurate forecast and must be reported against in the future as part of SB Subcontracting Plan requirements.

Answer 1: Attachment 0001 will be used to calculate the total contract price. Offerors are reminded that, as stated in L.4.4.8, "Small

Business Subcontracting Plan percentages will be different in that the percentage calculation denominator is total subcontracting amount as opposed to this Small Business Participation Factor where the percentage calculation denominator is the Offeror's proposed Contract

Target Price."

Question 2: Do the General Specifications apply to inert items (CLINs 360-387)? If so, which sections of the Gen Specs apply?

(Attachments 0004-0008)

Answer 2: See the revised SOW sections noted above.

*** END OF NARRATIVE A0004 ***

2 18

W15QKN-17-R-0017 0003

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

STATEMENT OF WORK

FOR

ACQUISITION OF NON STANDARD AMMUNITION, AMMUNITION RELATED ITEMS AND NON STANDARD MORTAR WEAPON SYSTEMS

1.0 Objective

The contractor shall supply and deliver the Non Standard Ammunition (NSA), ammunition related items and Non Standard Mortar Weapon

Systems (NSMWS) listed in the attached Section J, Attachment 0001, Section B Attachment.

2.0 Applicable Documents

a. General Specification for Non Standard Ammunition, dated 10 Feb 2017

b. General Specification for Non Standard Mortar Ammunition, dated 10 Feb 2017

c. General Specification for Non Standard Small Caliber Ammunition, dated 10 Feb 2017

d. General Specification for Non Standard Rocket Propelled & Spin Stabilized Grenade Ammunition, dated 10 Feb 2017

e. General Specification for Non Standard Mortar Systems, dated 10 Feb 2017

f. NSA Safety Statement of Work, dated 21 October 2016

g. NSA Security Statement of Work, Physical Security Standards for DoD Security Risk Category I and II Missiles and Rockets and

Ammunition and Explosives (A&E) at Contractor-Owned, Contractor-Operated (COCO) Facilities (from DoD 5100.76M, Appendix 2)

h. NSA Security Statement of Work, Physical Security Standards for DoD Security Risk Category III/IV Ammunition and Explosives (A&E) at

Contractor-Owned, Contractor-Operated (COCO) Facilities (from DoD 5100.76M, Appendix 2)

i. DOD 4145.26M Contractor's Safety Manual for Ammunition and Explosives, dated 13 March 2008

3.0 Requirements

3.1 All ammunition and NSMWS shall meet the requirements and verification procedures of the specifications listed in section 2.0 above.

3.2 All NSA, ammunition related items and NSMWS procured as a result of this scope of work shall be of new production or new surplus.

NSA, ammunition related items and NSMWS produced after contract award are considered new production. NSA and ammunition related items up to 12.7x108mm and produced within ten (10) years of contract award are considered new surplus. NSA and ammunition related items greater than 12.7x108mm produced within (5) years of contract award are considered new surplus. Unused (other than weapon testing) NSMWS produced within five (5) years of contract award are considered new surplus.

3.3 Technical Data

3.3.1 Ammunition and NSMWS

3.3.1.1 The contractor shall submit, for Government review and approval, a Technical Data Package (TDP) as defined in the applicable specification for NSA, ammunition related items and NSMWS (DI-SESS-81003D, Tailored). The contractor shall submit a summary of changes when resubmitting a TDP for Government review and shall provide a certification that only changes included in the summary were made to the TDP.

3.3.2 Links and Linking Machines

3.3.2.1 The contractor shall submit for Government review and approval, the TDP to which the links and linking machines were produced and shall include, but not be limited to, the following information:

3.3.2.1.1 Technical drawings Assembly drawings shall be provided that includes all key interface dimensions with tolerances for links and linking machines, including all component parts that comprise of the assembly.

3.3.2.1.2 Serviceability - All machined surfaces and details of manufacture shall be in accordance with their technical drawings and shall be visually inspected by the contractor to verify serviceability. All material shall be free of: 1.) surface irregularities such as metal defects, folds, burrs, scratches, scaly metal, rust, cracks, dents, sharp edges, and any other damages; 2.) foreign matter such as corrosion, stains, discoloration, dirt and smears of lacquer.

3.3.2.1.3 Weapon Interface/Function Test - Testing shall be conducted 14 days prior to Government Source Inspection (GSI). Dimensional inspections shall be performed to verify that the links and linking machines are manufactured to all assembly and component drawings.

All tests that are performed on all links and linking machines prior to acceptance shall be provided in the full technical data with sample sizes and accept/reject criteria. Operational tests shall ensure that; 1) Linking Machines fully seats the cartridge into the belt without damage to the cartridge, belt or linking machine 2) Belts shall feed in their respective weapons without stoppage. Sample sizes shall be five (5) items and the accept/reject criteria shall be 5-0-1. Failure shall result in a double sample retest with an accept/reject criteria of 10-1-2.

3 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

a. Linking machines shall operate smoothly and without interference or loss of motion. The machine shall operate through the full range of motion without binding and shall be capable of linking ammunition for the specific weapon system.

b. Ammunition processed through the linking machine shall be firmly positioned in the linked belt and be capable of functioning in the specific weapon. Linking machines shall not damage or cause the ammunition to function during loading and shall seat cartridges so that

(dependent on design):

1. There is no gap between the mouth of the casing and free hanging portion of the link. or-

2. The link seats within the rim of the cartridge.

c. Linked Belts shall be linked with ammunition and function tested in the weapons system the ammunition and links are designed to function.

d. For Explosive Ordnance Disposal (EOD) CLINS 360-387 only, Inert training items shall be completely inert and shall contain factory original hardware related to various foreign manufactured ordnance items for purpose of training. As these items will be used for training Soldiers in identification of ordnance, all items must have factory original stamped and stenciled markings as appropriate.

The items shall not be marked inert or painted in any other way which would have them stand out as inert items. All items must be complete with all internal components. Machined, cast or any other type of manufactured replicas are not acceptable and will be rejected. Energetics shall be removed and replaced with inert fill. Contractor shall include written certification that all items are inert with each shipment.

e. For cutaway models, the energetic material must be replaced with non-energetic material to a similar shaped material. Example, if it contains propellant charges, the inert cartridge must contain pellets made out of inert material.

f. All inert items, with the exception of CLINS 360-387, must be marked inert.

g. For non-cutaway models which will be used for training simulation, energetic materials must be replaced with non-energetic material of similar weight and density so that the inert cartridge has the same weight and dynamic feel of a live cartridge.

3.3.3 The TDP for the NSA, ammunition related items, EOD Inert Training Items and NSMWS shall be submitted to the Government NLT thirty

(30) days after award (DAA) (DI-SESS-81003D Tailored). The Government will review and provide TDP disposition within fourteen (14) days of receipt. The Contractor shall submit the revised TDP, as applicable, within twenty one (21) days after disposition is received.

TDPs must be approved by the Government prior to the Lot Acceptance Testing (LAT). See section 4.0. Technical data needs to be electronically submitted to the Government (Contracting office, and the Product Director for Non-Standard Ammunition (PD-NSA) Technical

Team, usarmy.Pica.peo-ammo.list.PM-NSA-Technical@mail.mil).

3.4 New production items produced for this contract shall have its own unique lot number. These lot numbers cannot be used for deliveries to other customers.

3.5 Ammunition, ammunition related items, and NSMWS consisting of one homogenous lot, presented for acceptance shall be accompanied by a complete lot history file (DI-MISC-80508, Tailored). Homogenous lots shall consist of final assembly and all components are produced of the same uniform design and composition as identified in the approved technical data. The minimum contents shall include:

a. Identification of approved technical data

b. Ammunition and/or Weapon Data Card (Producer, Date of Manufacture, Date of Original Acceptance, Components)

c. Initial Acceptance Reports (Quantity and Method of Acceptance)

d. Surveillance Reports, if applicable (duration and storage conditions)

e. Storage history, if applicable (duration and storage conditions)

f. Weapon Interface Results

g. Performance and Safety Testing results

(Round x Round results for Destructive and Non-Destructive Tests such as Velocity, Pressure, Dispersion, Dimensional etc.)

h. Function, Casualty, and Metal Parts Security Results

i. Fuze or key component in-process testing results (raw data)

j. Packaging Inspection Results

4 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

k. Marking Inspection Results

3.6 Intentionally left blank

3.7 A copy of the lot history file shall also be available for review at time of lot presentation for source inspection (DI-MISC-80508, Tailored).

3.8 An electronic copy of the lot history file shall be provided to the Government upon inspection and acceptance as defined in the specifications of NSA (DI-MISC-80508B, Tailored). The electronic copies are to be submitted to the Government (Contracting office, PD-

NSA Technical Team at usarmy.Pica.peo-ammo.list.PM-NSA-Technical@mail.mil and to the applicable Defense Contract Management Agency

(DCMA) office.)

3.9 Mortar Ammo and Weapons/Spare Parts Requirements Definitions

3.9.1 Cleaning Kit: Kit which contains the necessary items to clean the weapon which may include items such as Bore Brush, Cleaning Rod, Cleaning Solvents, and Cleaning Cloths.

3.9.2 Maintenance Kit: Kit which includes necessary tools to perform maintenance such as application specific wrenches, screwdrivers and pliers.

3.9.3 Maintenance Supplies Kits: Kits that include commonly replaced items and spare parts such as springs, firing pins, washers, gaskets, nuts and bolts.

3.9.4 Sight Glass: The weapon sight used to aim the weapon.

3.9.5 Aiming equipment: Equipment used to assist the soldiers in aiming the sight to hit the target. Items may include aiming stakes, plotting board and firing tables.

4.0 Lot Acceptance Testing (LAT)

The Contractor shall perform LAT in accordance with the applicable specifications. The contractor shall provide notification to the

Government of planned dates, times, locations and events of LAT no later than 60 days prior to the planned LATs, to allow for Government witness. Failure to provide the minimum notification of LAT may cause the Government to require that the LAT(s) be rescheduled at contractor expense. The Government will notify the Contractor of intent to witness LAT within five(5) business days of LAT notification and supply the Contractor the visitor names and copies of those visitors' U.S. passports (if required by host/supplier country). If the

U.S. Government has indicated an intent to witness the LAT, the LAT shall not occur prior to the U.S. Government presence nor prior to approval of the TDP. If the Contractor performs the LAT prior to Government arrival, re-performance of the LAT will be required at contractor expense. The contractor shall provide written confirmation of a LAT cancellation to the Government (Contracting office and PD-

NSA Technical Team at usarmy.Pica.peo-ammo.list.PM-NSA-Technical@mail.mil) seven (7) days prior to a scheduled LAT. If the Government receives the notification of cancellation later than the seven (7) days required, the Government reserves the right to seek monetary consideration and/or assess the Contractor with a negative performance evaluation for that order.

4.1 The LAT events must correspond to the LAT events outlined in the Contractor's TDP. LAT test quantities shall match the quantities identified in the approved TDP, and will consist of random samples pulled after the entire lot is produced. Additional random samples from the lot must be readily available for the LAT in case re-tests are required.

4.2 After completion of LAT(s), the contractor shall provide all in-process and final acceptance testing results for both non-destructive and destructive testing performed during LAT(s) and must include all round-by-round results (raw data) for all tests. Test reports shall be sent via email (DI-MISC-80508B) to the Contracting office, PD-NSA Technical Team,usarmy.Pica.peo-ammo.list.PM-NSA-

Technical@mail.mil, and the cognizant DCMA office no later than (NLT) seven (7) calendar days from the completion of the testing.

5.0 Government Source Inspection (GSI).

The Contractor shall notify the Government NLT fourteen (14) days prior to planned GSI. The contractor shall not schedule GSI with

Defense Contract Management Agency (DCMA) prior to approval of TDP, successful completion of LAT, and approval/verification of the

Explosive Safety Site Plans (ESSP) for the inspection site (see 6.1.2). Documented evidence of these completed events shall be made available to the DCMA GSI inspector at time of inspection.

6.0 Safety Requirements

6.1 The contractor shall submit for Government review and approval the following safety documents thirty (30) days after award (DI-MISC-

80508B). The Contractor shall ensure that all of the requirements below are addressed prior to submitting to the Government for review.

Upon receipt, the Government will assess and provide disposition within thirty (30) days of receipt. The Contractor shall submit the revised safety documents within thirty (30) days of receiving disposition from the Government.

5 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

6.1.1 Safety Management Program Plan shall meet all the requirements of the NSA Safety and Security Statement of Works.

6.1.2 ESSP for all Department of Defense (DoD) GSI inspection locations including ingress/egress routes shall include the following:

a. Maps and drawings which are legible, accurate, and of a scale that permits easy determination of essential details. For general layout of buildings, this is normally a scale of 1 inch to 400 ft (or metric equivalent) or less. Site plans may include other scaled drawings, which provide details of construction, structure relationships within the GSI inspection location areas/arcs, barricades, or other unique details. Plans may also include pictures to illustrate details and videos of maximum credible event (MCE) testing data.

b. Maps and drawings shall also identify distances between all potential explosion sites (PESs), all exposed sites (ESs) within the applicable GSI inspection location areas/arcs, the facility boundary, additional property under contractor control, and ESs on adjacent property (when applicable). Identify all public railways, highways, power transmission lines, and other utilities that fall within the required GSI inspection location areas/arcs.

c. Identify and describe all PESs and all ESs within any applicable inhabited building distance (IBD) of a PES. Site plans for major new construction or modification shall also identify and describe all PESs whose IBD arc includes the proposed new or modified site.

Fragmentation distances shall be included for IBD arcs, when applicable. Plans shall identify and describe all PESs and all ESs out to

110 percent of IBD of a PES.

d. Plans shall include the maximum net explosive weight(s) (NEW(s)) and the Hazard Division (HD) of all PESs and ESs. Plans shall also include engineering or test data when substituting construction or shielding for distance to protect from fragmentation or overpressure.

e. Plans shall include a topographical map in sufficient detail to permit evaluation when the contractor uses natural terrain for barricading to reduce fragment distance.

f. Facility construction or changes to existing approved site plans that negatively impinge upon GSI inspection location areas/arcs shall be submitted to the Administering Contracting Officer (ACO)/Procuring Contracting Officer (PCO) for review and approval ninety

(90) days prior to the GSI inspection. These site plans shall contain the information required in subparagraphs a-e above; as well as construction details of dividing walls, venting surfaces, firewalls, roofs, operational shields, barricades, exits, ventilation systems and equipment, Ammunition and Explosive (AE) waste disposal systems, lightning protection systems, grounding systems, processing equipment auxiliary support structures, and general materials of construction, as applicable.

6.2 Additional guidance concerning Quantity Distance (QD) requirements and Explosives Site Plan (ESP) considerations can be found in

Chapter 5 of the current revision of DOD 4145.26M.

6.3 In the event of changes to any safety documentation the contractor must submit a waiver for review and approval to the PCO.

6.4. Site Plans for Government Source Inspection Site need to be electronically submitted to the Government (Contracting office, PD-NSA

Technical Team, usarmy.Pica.peo-ammo.list.PM-NSA-Technical@mail.mil, and to applicable DCMA ACO and DCMA Safety offices). The DCMA ACO and DCMA Safety POC and emails will be provided as needed (DI-MISC-80508B).

7.0 Material quality and condition requirements, and inspection and acceptance procedures shall be in accordance with section E of this solicitation.

8.0 Ship to and mark for shall be identified in the Letter of Contemplation for each delivery order.

9.0 Packaging shall be in accordance with the specifications listed in section 2.0 above and section D of this solicitation. If any discrepancies exist, Section D will take precedence.

10.0 End User Certificate (EUC)

a. If an EUC is required for any supplier to ship or export, and the US Government is required to process any documentation for any such

EUC, the required EUC and any required supporting documentation for each supplier, with required signatures identified, shall be provided to the Contracting office for staffing within ten (10) business days of each delivery order award.

b. If the quantity being supplied by the specified supplier changes from what is identified on the EUC, an amended EUC will be processed. Contractor shall provide the Contracting office with the draft amended EUC and the original EUC.

c. If the EUC will not be executed, zero quantity being supplied under the specified supplier, the original EUC shall be returned to the

Contracting office with a letter describing the change in suppliers.

d. In the event the original EUC cannot be returned, the Government requires all requesting documentation of efforts used in requesting the original document, to include e-mails.

e. All EUCs must specify the end item and the total quantity as reflected on the delivery order.

6 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

11.0 Status Reports

a. The contractor shall provide a contract status report to the Contracting Office, the Security Assistance office and the Product

Director Non Standard Ammunition office. The report shall be provided within ten (10) business days after contract award and on a weekly basis thereafter. In addition, the contractor shall promptly submit a status report if any significant change in status is known or anticipated. Attachment entitled, Att0009 Status Report Template is the template to be used for the submittal of the contract status report (DI-MGMT-80004).

b. The contractor shall provide a delivery status report to the Contracting Office, the Security Assistance office and the Product

Director Non Standard Ammunition office. The report shall be provided within ten (10) business days after contract award and on a weekly basis thereafter. In addition, the contractor shall promptly submit a delivery status report if any delay in the scheduled delivery is known or anticipated. Attachment entitled, Att0010 Del Status Report is the template to be used for the submittal of the delivery status report (DI-MGMT-80004).

11.1 Status Reports & Delivery Status Report shall be submitted electronically to the Government (contracting office and to PD-NSA

Technical Team at mailto:usarmy.Pica.peo-ammo.list.PM-NSA-Technical@mail.mil).

12.0 Item Information and Certification Statement (IICS)

a. The Contractor shall prepare and deliver an IICS (DI-MISC-80508B) for item inspection in accordance with the template attached. A separate IICS is required for each shipment, as defined as each individual aircraft/vessel load.

b. The Contractor shall present a copy of the IICS to DCMA QAR at contractor designated source inspection site for signature. Forty eight (48) hours prior to arrival at final destination, the contractor shall provide an electronic copy with the DCMA signature to PD-

NSA (Email: mailto:usarmy.Pica.peo-ammo.list.PM-NSA-Technical@mail.mil), for forwarding to the customer representative receiving the items at destination.

c. Once received at destination, a US Government Representative will verify shipment and sign for receipt of the items on the IICS. The

US Government Representative will perform a visual kind, count, and condition of the packaging, marking, and pallets. The US Government

Representative will sign the IICS verifying visual inspection only. These signatures do not constitute acceptance of the items.

d. The Government will send an electronic copy of the signed and completed IICS to the Contractor who must submit it into the Wide Area

Work Flow (WAWF).

e. Acceptance for shipments in WAWF will be made by the Contractor's local cognizant DCMA Quality Assurance Representative (QAR).

Acceptance will be based on DCMA source inspection, signed IICS, and Wide Area Work Flow Receiving Report (WAWF-RR). The WAWF-RR will be prepared and submitted in accordance with FAR 252.232-7006. The use of WAWF is the required method for electronic submittals.

13.0 DOT Hazard Classification. The contractor shall be responsible for obtaining an Explosive (EX) number from the Department of

Transportation. The contractor shall make certain that the material is tested in accordance with Part 173, Subpart C, Section 173.58(a) of Title 49 CFR Parts 106-180 to assign proper class and division for all explosives (Division 1.1, 1.2, 1.3, and 1.4 explosives).

Registration with the Associate Administrator of Hazardous Materials Safety is required in accordance with Part 173, Subpart C, Section

173.56(b)(1) or 173.56(c) of Title 49 CFR so that markings in accordance with 172, Subpart D, Section 172.301(a) and 172.32(a) are met.

Hazard classification documents, to include the final DOT approved EX#, shall be forwarded to the Product Director NSA Technical Team

(Email: usarmy.Pica.peo-ammo.list.PM-NSA-Technical@mail.mil (DI-MISC-80508B).

a. For energetic materials or energetic items made in the United States of America, the contractor is responsible for obtaining Hazard

Classification from the Department of Transportation prior to any shipment of energetic material during the period of this contract. All

US manufacturers shall make certain that the material is tested in accordance with Part 173, Subpart C, Section 173.58(a) of Title 49

CFR Parts 106-180 to assign proper class and division for all explosives (Division 1.1, 1.2, 1.3, and 1.4 explosives). Registration with the Associate Administrator of Hazardous Materials Safety is required in accordance with Part 173, Subpart C, Section 173.56(b)(1) or 173.56(c) of Title 49 CFR so that markings in accordance with 172, Subpart D, Section 172.301(a) and 172.32(a) are met. Hazard classification documents shall be forwarded to the Product Director NSA Technical office (Email: PicaPMNSATechnical@conus.army.mil) (DI-

MISC-80508B).

For energetic materials or energetic items from a foreign county, the foreign company shall provide specific hazard classification information. This specific hazard classification information shall include, as a minimum, a letter from the competent authority which is issued in accordance with Part 2, Chapter 2.0 and Chapter 2.1, paragraph 2.1.2 of United Nations Transport of Dangerous Goods, ST/SG/AC.10/1/Latest Revision and approves the hazard classification and a compatibility group assignment and assign the appropriate shipping name to the energetic material or energetic item. If available, the test data from running UN Test Series 4(a), 4(b)(ii), 6(a) or 6(b) and 6(c) should be obtained. The above information and test data shall be provided to the Product Director NSA Technical office

(Email: PicaPMNSATechnical@conus.army.mil) (DI-MISC-80508B).

14.0 Interim Hazard Classification (IHC)

7 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

The Contractor shall provide an IHC (DI-MISC-80508B) to the Product Director NSA Technical office (Email:

PicaPMNSATechnical@conus.army.mil) for any item containing propellant or explosives prior to shipment.

15.0 Post Award Meeting

An initial contract post award meeting shall be scheduled by the contractor and conducted within sixty (60) days after contract award.

The post award meeting shall be at the contractor's facility.

16.0 Program Reviews

The contractor shall conduct program reviews on a yearly basis with the Government as determined necessary by the Government. The meetings shall be conducted at alternating locations: (1) Picatinny, NJ and (2) the Contractor's Facilities. The information to be presented and discussed at each program review shall include, but is not limited to cost, schedule and technical performance, and program progress assessments.

17.0 Integrated Product Team (IPT)

There will be biweekly IPT meetings held throughout the duration of this contract.

18.0 Operations Security (OPSEC)

a. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to government installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

b. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language text required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

c. Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Contractor and all associated sub-contractors employees shall comply with applicable Installation, facility and area commander installation/facility access and local security policies and procedures

(provided by government representative). Installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). Installation Provost Marshal Office, Director of Emergency Services or

Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection

Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

d. For Contracts that require OPSEC Training. Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter.

e. For Contract Requiring Performance or Delivery in a Foreign Country, DFARS Clause 252.225-7043, Antiterrorism/Force Protection for

Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non-contingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives.

*** END OF NARRATIVE C0001 ***

8 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. PROPOSAL SUBMISSION:

L.1 Introduction: This section contains general proposal submissions instructions as well as specific proposal requirements for Non-

Standard Ammunition and Non-Standard Mortar Weapons System.

L.1.1 General. The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the Request for Proposal (RFP). The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2 PROPOSAL INSTRUCTIONS:

L.2.1 General:

L.2.1.1 Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the

Offerors capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2.1.2 The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.

L.2.1.3 Proposals that do not contain the information requested in the solicitation risk being determined Unacceptable by the

Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2.1.4 Alternate Proposals: Alternate proposals will not be accepted.

L.2.1.5 Proposals shall be valid through 31 August 2017.

L.2.2 All questions concerning this procurement, either technical or contractual must be submitted in writing to the Contracting

Officer. No direct discussion between the technical representative and a prospective Offeror shall be conducted. Questions and proposals shall be submitted to the following point of contact:

Army Contracting Command New Jersey

ACC-NJ-MA, Bldg.10

ATTN: Trisha Fitton, Telephone: (973)724-1936

Picatinny Arsenal, NJ 07806-5000

E-mail: trisha.a.fitton.civ@mail.mil

Please note that electronic e-mail proposal submissions will not be accepted.

L.2.3 The proposal shall consist of the following:

L.2.3.1 Each proposal shall be submitted in the English language and consist of and include all of the following:

a. One (1) signed and completed paper copy of the attached Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the CLINs/Pricing Matrices in Section

B, any fill-ins required, such as Contract Data Requirements List: DD Form 1423 with Blocks 17 and 18 completed if required, and

Certifications and Representations in Section K. Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating N/A. The proposal must also include computation for the use of Government Property, if applicable.

b. Original and three (3) paper copies and five (5) electronic CD copies of the proposal volumes, as reflected in D.3., shall be compiled using the Microsoft Office for Windows suite of applications, submitted on a single-write CD-ROM to prevent accidental erasure of the data therein, and formatted for an MS Windows compatible computer. The Price Factor shall be contained on a separate CD from non-price Factors. Price breakdown, when applicable, will include MS Excel spreadsheets with formulae intact. Process flows may be delivered in hard copy if not compatible with the above software. CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each Factor will be used for the evaluation. Each CD must be clearly marked with the

Offerors Name and the Solicitation Number. Alternatively, files may be provided in Portable Document Format (.pdf).

c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide all

9 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under the Non-Standard Ammuniton and Non-

Standard Mortar Weapon System solicitation, all Offerors must submit Reps/Certs data into the System for Award Management (S.A.M.) at https://www.sam.gov/ and provide one (1) hard copy and one (1) electronic copy (on CD) submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.

L.2.3.2 Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR

52.219-9, alternate II. This plan shall be incorporated into any resultant contract in reference to the RFP.

L.3 FORMAT FOR PROPOSALS

L.3.1 The Offerors proposal shall be submitted in severable volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating.

Information provided shall be specific to each Factor.

Page limitation for each Volume is as follows:

Volume I: Management Factor (Maximum of 175 pages)*

Volume II: Technical Factor (Maximum of 150 pages)

Volume III: Price Factor (No Maximum)

Volume IV: Past Performance (Maximum of 40 pages)

Volume V: Small Business Participation (Maximum of 50 pages)

Volume VI: Solicitation,Offer and Award Documents and Certifications/Representations (No Maximum)

*11/17" Fold-out pages will be allowed, but each fold out page will count as one additional page. The following are excluded from the page count: volume title pages, table of contents pages, cross-referencing pages, acronym lists, page dividers (used to separate proposal parts), the Offerors current Quality Manual, and the four requested examples of technical data.

L.3.2 Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in MS Word. MS Word (.doc) files shall use the following page setup parameters:

Margins Top, Bottom, Left, Right - 1

Gutter 0

From Edge Header, Footer 0.5

Page Size, Width 8.5

Page Size, Height 11

L.3.3 Length:

L.3.3.1 Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-

1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, factory floor layouts, etc. may be used, with each fold counted as one additional page. The font used shall not be less than 10 point.

L.3.3.2 Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the Procuring

Contracting Officer (PCO) no later than fifteen (15) days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.

L.3.3.3 The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal.

Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in Section M of the

RFP.

L.3.3.4 File Packaging - All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. Please note Self extracting .exe files will not be accepted.

L.4 SPECIFIC PROPOSAL INSTRUCTIONS

Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation

10 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles that are cross-referenced to both the applicable Statement of Work (SOW) paragraph and page number. This index shall not count against the Page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable SOW paragraph by placing the appropriate SOW number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offeror shall provide detailed narrative discussions that address both the SOW and the Contract Data Requirements List (CDRLs) of the solicitation. All information and data provided shall be specific to NSA and NSMWS, except for the area of Past Performance. In the response to the Request for Proposal, the Offeror must address the following Factors and Subfactors:

L.4.1 Volume I FACTOR 1: MANAGEMENT

L.4.1.1 The Management volume consists of the following three sub-factors: (A) Program Management Plan, (B) Supply Chain Management

Plan, and (C) Delivery Order 0001. The Offeror shall include sufficient information to complete an accurate evaluation from a technical standpoint. The Offeror shall provide a detailed narrative that addresses each task as described below:

L.4.1.2 Subfactor 1: Program Management Plan

The Offeror shall submit the following for the entire program as follows:

(a) A Management Plan that identifies and addresses the Offerors process for addressing issues with non-conformances to general specifications, performance and inspection or test failures.

(b) A description of the Offerors organizational structure clearly defining/displaying the roles and responsibilities of the key personnel and how the proposed team will be able to manage and execute complex supply and transportation plans; to include the level of direct access of the Offerors Program Manager to its higher-level management (i.e., senior staff, corporate senior officials) and/or the authority of the Program Manager to accomplish delegated tasks.

(c) A Quality Management System Plan that is certified to, compliant with or exceed ISO 9001:2008 standards and which addresses initiatives to identify, minimize and control internal and supplier processes.

(d) Evidence that substantiates the Offerors experience and ability to effectively manage schedule and performance of the Offerors subcontractors.

(e) A Risk Management Plan which adequately identifies potential programmatic risks, probabilities, associated consequences, mitigation strategies, and addresses how the Offeror will continuously update and review its risk management/mitigation process throughout the life of the contract.

L.4.1.3 Subfactor 2: Supply Chain Management Plan

The Offeror shall provide a detailed Supply Chain Management plan for each of the items on the Section B Attachment for NSA/NSMWS in

Section J, Attachment 0001. The detailed Supply Chain Management Plan proposal will consist of two parts: (1) Supply Plan and (2)

Transportation Plan.

(1) The Supply Plan shall list the following at a minimum:

-Item

-Quantity

-Supplier(s)

-Source location(s)

-Manufacturer(s) and location(s) of manufacture (if different than supplier/source location(s))

-Source of supply - new production and/or surplus with ammunitions range of years manufactured and service life

If multiple suppliers, the quantity should be reflected for each supplier.

The Offeror shall identify any required End Use Certificate (EUC) and supporting documents for each supplier/foreign country.

Supporting evidence shall include letters of commitment from each supplier/source and for any additional parties identified within the supply chain.

Letters of commitment from supplier/source shall include at a minimum:

-Name and address of the company providing the commitment

-Item of commitment

-Length of commitment for a minimum of 120 days from date the solicitation closes.

-Signature of individual from supplier/source that is authorized to bind the company and provides a firm commitment

11 18

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) The information provided for the Transportation Plan portion of the Supply Chain Management sub-factor is required for items identified below:

a) The proposal shall include a detailed Transportation Plan for all items listed below for delivery to Miesau, Germany AND Crane, Indiana

0005 7.62x39mm Ball 2,500,000 EA

0024 12.7x108mm Ball 2,500,000 EA

0289 40mm HE Frag 10,000 EA

0110 73mm HEAT 15,000 EA

0115 122mm HE Frag Partial Charge 30,000 EA

The Miesau, Germany AND Crane, Indiana Transportation Plan should include at a minimum the following:

-Mode(s) of transportation from origin to final delivery point (to include inland transportation)

-Identification of port(s) to be utilized

-Identification of freight forwarder companies

-Rough Order Magnitude (ROM) price for transportation costs

b) Each Transportation Plan shall also include milestones of each shipment, to include the milestones to obtain any local, state, or federal permits, approvals, and/or clearances required to handle the movement of the ammunition into customer country. The terms of local and state permits, approvals, and clearances includes all foreign states and localities necessary for the movement.

L.4.1.4 Subfactor 3: Delivery Order 0001

Requirements of Delivery Order 0001 include:

CLIN Item Quantity Destination

0005 7.62x39mm Ball (AK-47) 30,000 EA Blue Grass Army Depot, Richmond, KY

0005 7.62x39mm Ball (AK-47) 1,000 EA Picatinny Arsenal, NJ

0010 7.62x54mm R Ball (PKM) 126,000 EA Blue Grass Army Depot, Richmond, KY

0010 7.62x54mm R Ball (PKM) 1,000 EA Picatinny Arsenal, NJ

0024 12.7x108mm Ball (DsHK) 10,000 EA Blue Grass Army Depot, Richmond, KY

0024 12.7x108mm Ball (DsHK) 1,000 EA Picatinny Arsenal, NJ

The Offeror shall submit the following information as it pertains to Delivery Order 0001:

(a) A detailed Supply Chain Management Plan that demonstrates compliance with the required quantities and delivery schedules. The detailed Supply Chain Management Plan proposal will consist of two parts: (1) Supply Plan and (2) Transportation Plan.

1) The Supply Plan shall list the following at a minimum:

-Item

-Quantity

-Supplier(s)

-Source location(s)

-Manufacturer(s) and location(s) of manufacture (if different than supplier/source location(s))

-Date of delivery

-Source of supply - new production and/or surplus with ammunitions range of years manufactured and service life

If multiple suppliers, the quantity should be reflected for each supplier.

The Supply Plan shall also include a detailed plan that…