Attachment 0007 - General Specification for Non Standard Rocket Propelled & Spin

View the file

Other files for this federal contract opportunity

Other files attached to Miscellaneous Ammunition, newest first.
File Type Posted
W15QKN17R0017-0008.pdf PDF
W15QKN17R0017-0007.pdf PDF
W15QKN17R0017-0006.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
W15QKN17R0017-0005.pdf PDF
W15QKN17R0017-0004.pdf PDF
W15QKN17R0017-0003.pdf PDF
W15QKN17R0017-0002.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
Attachment_0008_-_General_Specification_for_Non_Standard_Mortar_Systems_10_Feb_2017.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
Attachment_0005_-_General_Specification_for_Non_Standard_Mortar_Ammunition__10_Feb_2017.pdf PDF
Attachment_0004_-_General_Specification_for_Non_Standard_Ammunition_10_Feb_2017.pdf PDF
Attachment_0007_-_General_Specification_for_Non_Standard_Rocket_Propelled_&_Spin_Stabilized_Grenade_Ammunition_10_Feb_2017.pdf PDF
Attachment_0006_-_General_Specification_for_Non_Standard_Small_Caliber_Ammunition_10_Feb_2017.pdf PDF
W15QKN17R0017-0001.pdf PDF
Attachment_0003_-_Delivery_Order_Proposal_Form.xlsx XLSX spreadsheet
Attachment_0006_-_General_Specification_for_Non_Standard_Small_Caliber.pdf PDF
Attachment_0013_-_Past_Performance_Questionnaire.doc DOC document
Attachment_0004_-_General_Specification_for_Non_Standard_Ammunition.pdf PDF
Exhibit_A_-_CDRLs.pdf PDF
Attachment_0010_-_Delivery_Status_Report_Template.xlsx XLSX spreadsheet
Attachment_0009_-_Status_Report_Template.xls XLS spreadsheet
Attachment_0015_-_INME-PIC-IM_Form_3002.pdf PDF
W15QKN17R0017.pdf PDF
Attachment_0012_-_NSA_Security_SOW.pdf PDF
Attachment_0008_-_General_Specification_for_Non_Standard_Mortar_Systems.pdf PDF
Attachment_0011_-_NSA_Safety_SOW.pdf PDF
Attachment_0005_-_General_Specification_for_Non_Standard_Mortar_Ammunition.pdf PDF
Attachment_0014_-_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_0001_-_Section_B_Attachment.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Distribution Statement A. Approved for public release; distribution is unlimited.

Project Manager – Maneuver Ammunition Systems

Product Director – Non Standard Ammunition

GENERAL SPECIFICATION FOR

NON-STANDARD ROCKET PROPELLED & SPIN STABILIZED

GRENADE AMMUNITION

02 November 2015

1. SCOPE

1.1 Scope. This specification prescribes the performance requirements and identifies the verification procedures for the Non-Standard Rocket Propelled and Spin Stabilized Grenade

Ammunition.

2. APPLICABLE DOCUMENTS

2.1 General. In addition to documents listed in this section, there are documents specified in section 5 of this specification.

2.2 Government documents. Not Applicable.

2.3 Non-Government publications.

a) United Nations Recommendations on the Transport of Dangerous Goods Model

Regulations, 13th Edition, 2003.

b) International Civil Aviation Organization (ICAO) Technical Instructions for the Safe

Transport of Dangerous Goods by Air, 2015-2016 Edition.

c) International Maritime Organization (IMO) International Maritime Dangerous Goods

Code (IMDG), Amendment 34-08.

2.4 Acquisition requirements. Acquisition documents must specify the following:

a. Title and date of this specification.

b. Requirements for certificates of conformance for each lot or shipment of product.

c. Requirements for age of ammunition.

d. Requirements and provisions for submission of data as required.

e. Requirements for acceptance criteria if different than those stated in specification.

f. Requirements for reduction or elimination of verification procedures.

g. Requirements and provisions for contractor and Government verification.

h. Requirements and provisions for packaging of ammunition.

i. Requirements and provisions for transportation of ammunition.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

2.5 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Requirements specified in the contract or delivery order precede the text of this document. Nothing in this document or the contract, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1 Technical requirements. Ammunition shall meet the requirements and verifications of this specification for the non-standard rocket propelled and spin stabilized grenade ammunition listed in

ANNEX A. Any non-standard grenade that can be categorized as rocket propelled or spin stabilized but is not specifically identified in ANNEX A must still adhere to the testing parameters of this specification. All non-standard rocket propelled and spin stabilized grenade ammunition shall be accompanied with technical data (see APPENDIX) that meets or exceeds the requirements of this specification.

3.1.1 Compliance to technical requirements and storage history records. A Technical Data

Package (TDP) as well as lot history reports shall be provided to ensure ammunition is in compliance with this specification. Additionally, documented storage history of the ammunition shall be provided.

3.2 Conformance Testing and Inspection. A sample of the grenades shall be subjected to conformance testing and inspection in accordance with TABLE I.

3.2.1 Stock ammunition. All grenades must be less than 5 years old and meet the verification procedures in TABLE I of this specification. Any lot that has not been adequately tested to comply with all requirements of Table I shall be subjected to conformance testing and inspection in accordance with this specification.

3.3. Serviceability. Grenades shall be serviceable and issuable, in good condition and without visible signs of degradation. All parts and assemblies shall be free of burrs, folds, chips, sharp edges, cracks, surface defects, dirt, grease, rust, corrosion and other foreign material that may adversely affect fit or function.

3.3.1 Identification of defects. Defects shall be identified within the technical data and shall include a defined method for acceptance/rejection of the grenade ammunition.

3.4 Weapon interface and interoperability. The grenade shall be functionally compatible with the weapons listed in ANNEX A or as otherwise specified in the contract or delivery order.

3.5 Operating requirements. Each grenade shall provide the following functional, operational, and performance capabilities when fired from the weapons listed in ANNEX A, regardless of weather conditions (i.e. rain, snow, mud, wind, fog)

3.5.1 Operating temperatures. The grenades shall demonstrate safety and reliability throughout exposure to ambient and extreme temperatures.

3.5.2 Muzzle velocity. The average velocity obtained at ambient temperature testing shall meet the specified characteristics listed in ANNEX B.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

3.5.3 Chamber pressure. The individual max pressure and average pressure of the grenades fired shall meet the specified characteristics listed in ANNEX B.

3.5.4 Maximum effective range. The maximum effective range of the grenades shall meet or exceed the specified requirement listed in ANNEX B.

3.5.5 Function and casualty. The grenades shall function without casualty or cause damage to the weapon, and shall exhibit a ballistic performance free of misfires, duds, premature bursts, short rounds, and metal parts separation. The grenades shall cause no hazard or unsafe condition to the gunner during storage, transportation or use.

3.5.6 Dispersion. The grenades shall demonstrate dispersion characteristics as specified in the technical data.

3.5.7 Fragmentation. The grenades shall provide the lethal fragmentation at the desired radius for each item as identified in ANNEX B. (High Explosive/Fragmentation (HE/FRAG) Grenades only).

3.5.8 Penetration. The grenades shall meet the armor penetration characteristics as specified in technical data. (High Explosive Anti-Tank (HEAT) Grenades Only).

3.6 Fuze identification and description. Within each TDP the fuze shall be identified with a drawing/figure of the internal fuze design with components categorized and a functional description of the fuze that includes, at a minimum, a detailed description of the fuze arming sequence, operating temperatures, in-process tests (i.e. jolt/jumble, sensitivity, safe arming/non-arming etc.), and safe separation distances. Test records shall be available to the US Government for verification.

3.7 Environmental Requirements.

3.7.1 Sequential rough handling. Grenades shall be capable of withstanding the rigors of the sequential rough handling and transportation throughout extreme temperature ranges and meet all performance and safety requirements.

3.7.2 Shelf life. The grenades shall meet all requirements of this specification within its operating temperature range at a minimum of ten (10) years.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

4. VERIFICATION

4.1 Technical verification. The grenades shall be subjected to verification of all requirements cited in section 3 in this specification, in accordance with the TABLE I. Noncompliance to any requirements shall be cause to withhold acceptance of the lot or batch in which the noncompliance was found.

TABLE I – Requirements/Verification Cross-Reference Matrix

4.1.1 Lot formation. The grenades shall be assembled into identifiable lots, sublots, or batches, or in such other manner as may be prescribed. Each lot or batch shall, as far as practicable, consist of units of product of a single type, grade, class, size, and composition, manufactured under essentially the same conditions, and at essentially the same time. Lot quantities shall be determined by the total quantity for shipment and include the additional rounds from the same lot to be consumed during lot acceptance testing along with contingency rounds for potential retesting. The lots or batches shall be identified by the contractor and shall be kept intact in adequate and suitable storage space. All grenades in a given lot must be manufactured prior to lot acceptance testing.

4.1.2 Conformance verification. The ammunition shall be subjected to verification in accordance with TABLE I.

4.1.3 Conformance acceptance. Acceptance of grenades shall be based on compliance with requirements in TABLE I of this specification. Failure to meet requirements of TABLE I shall be cause to withhold acceptance of the lot or batch for which verification was performed. A Request for Variance

(RFV) may be submitted for special consideration of a lot that does not comply with all requirements of the TDP. The US Government may approve or disapprove RFVs on a case by case basis.

Section 3

Requirements Requirement

Section 4

Verification

Procedures

Sample Size

3.1 Technical requirements 4.1 -

3.3 Serviceability 4.3 Note 1

3.3.1 Identification of defects 4.3 Note 1

3.4 Weapon interface 4.4 Annex A

3.5.1 Operating temperatures 4.5.1 Annex A

3.5.2 Muzzle velocity 4.5.2 Annex B

3.5.3 Individual/Average max.

pressure

4.5.3 Annex B

3.5.4 Maximum effective range 4.5.4 Annex B

3.5.5 Function and casualty 4.5.5 Annex A

3.5.6 Dispersion 4.5.6 Annex B

3.5.7 Fragmentation 4.5.7 Annex B

3.5.8 Penetration 4.5.7 Annex B

- Packing - Note 1

- Marking - Note 1

Note 1) To be performed using a defined sampling procedure for inspection determined on the grenade cartridge lot sizes.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

4.1.4 Retest criteria. A ballistic retest is authorized upon initial failure of ammunition to meet test requirements as long as the failure is not considered critical. Retest procedures must be clearly defined in the technical data and results must be combined with data from the first test unless a failure analysis confirms that the failure was caused by something other than the ammunition (i.e. weapon failure or faulty test set up).

4.2 Verification of evidence of compliance. Evidence shall include, but is not limited to, the following;

a. Identification of technical requirements to which the grenades is/was produced.

b. Producer, date of manufacture and original acceptance documentation.

c. Initial acceptance reports, including type, lot or batch identification, quantity and method of acceptance (e.g. sample size, verification method, acceptance criteria, results).

d. Surveillance reports, including lot or batch identification, quantity and method of surveillance

(e.g. sample size, verification method, criteria for action to be taken on lot or batch, results).

e. Storage history, including duration and storage condition (e.g. controlled, uncontrolled).

4.3 Serviceability. A random sample shall be selected from the lot of grenades using a defined sampling procedure for inspection. Grenades and packaging shall be of good condition without visible signs of degradation. The grenades shall be visually inspected for signs of degradation and the identification of defects according to the producer’s technical data. Re-inspection of a lot that fails for non-ballistic reasons is authorized as long as the criteria for re-inspection is clearly outlined in the technical data.

4.4 Weapon interface and interoperability. A random sample shall be selected from each lot of grenades to be delivered and inserted into a weapon chamber or chamber gage that conforms to the identified weapon system to check for profile and alignment. Inability to interface properly with weapon system shall be considered a failure to show compliance and constitute a single reliability failure.

4.5 Operating verification.

4.5.1 Operating temperatures. Grenades shall operate reliably and safely when conditioned and fired throughout the extreme operating temperature range. Temperature testing shall be conducted on a skip-lot basis (see APPENDIX) either in-process or during LAT. A single safety failure will result in lot rejection and there shall be no retest. Functional testing parameters must be defined in the technical data and meet manufacturer requirements.

4.5.2 Muzzle velocity. Velocity tests shall be conducted in accordance with the producers test procedures to verify that a sample representative of the lot meets the velocity requirements specified in

ANNEX B.

4.5.3 Maximum pressure. Pressure tests shall be conducted in accordance with the producers test procedures to verify that a sample representative of the lot does not exceed the average or individual pressure requirements listed in ANNEX B, regardless of in process testing. Any single round that

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015 exceeds the maximum individual pressure requirement will result in lot rejection and there shall be no retest.

4.5.4 Maximum Effective Range. Maximum effective range shall be verified during lot acceptance testing to ensure compliance with ANNEX B.

4.5.5 Function and casualty. The grenades shall function across the entire operating temperature range (extreme hot, cold, ambient) without casualty or damage to weapon, and shall exhibit a ballistic performance free of misfires, duds, premature bursts, short rounds and metal parts separation. The grenades shall cause no hazard or unsafe condition to the gunner during storage, transportation or use.

Any round which detonates prior to impact of intended target, or which detonates in the weapon is considered a safety critical failure and will result in immediate lot rejection.

4.5.6 Dispersion. Dispersion tests shall be conducted to verify that a representative sample of the lot meets the requirements identified within the technical data.

4.5.7 Performance. Proper functioning for each grenade type is defined below. Testing shall be conducted in accordance with the producer’s test procedure to verify that a representative sample of the lot meets the requirement specified in the technical data.

a. HE Frag: High-order detonation of the warhead upon initial impact with the specified target

(terrain or man-made structure).

b. HE Frag Bounding: The cartridge shall bound/jump after initial impacting with the ground and produce a High-order detonation of the warhead between a low/high heights as specified by the manufacturer above ground.

c. Smoke: The cartridge shall produce the manufacturer’s specified volume of smoke within

10 seconds of initiation.

d. HEAT: High-order detonation resulting in jet capable of penetrating armor, depth to be specified by the manufacturer.

5. PACKAGING

5.1 Preservation, packaging, packing, unitization, and marking shall provide protection for multiple handling, redistribution, and shipment by any transportation mode and meet or exceed the following requirements.

5.1.1 Packaging containers for hazardous materials, ammunition and explosives shall meet or exceed the requirements found in part 6 of the "United Nations Recommendations on the Transport of

Dangerous Goods Model Regulations" and in a manner acceptable to the competent authority of the nation of origin and in accordance with the regulations of all applicable carriers.

5.1.2 Cleanliness - Items and packaging shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use.

Coatings and preservatives applied to the item for protection are not considered contaminants.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

5.1.3 Preservation - Items susceptible to corrosion or deterioration shall be provided protection against external environmental effects.

5.1.4 Cushioning - Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, critical material) or which could cause physical damage to other items, shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration and prevent damage during handling and shipment.

5.1.5 All natural wood packing material shall be constructed from heat treated lumber and certified by an accredited recognized agency in accordance with International Standards for

Phytosanitary Measures (ISPM-15) regardless of origin or destination. All natural wood packing materials must include certification markings that are readily visible to inspectors and on at least two sides of every container when palletized.

5.2. Unit Package

5.2.1 Unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling. The outermost component of the unit package shall be a container such as a sealed bag, carton, or box.

5.3. Packing

5.3.1 Unit packages must be packed in shipping containers. All shipping containers shall be the most cost effective and shall be of the minimum cube to contain and protect the items.

5.3.2 Shipping Containers - the shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions and meet the requirements of the “United Nations Recommendations on the Transport of Dangerous Goods”.

5.4. Unitization

5.4.1 Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 20 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. The weight capacity of the pallet must be adequate for the load. A pallet load shall not exceed 4,000 pounds and should not exceed 52 inches in length or width, or 54 inches in height. The load shall be contained in a manner that will permit safe handling during shipment and storage.

5.4.2 Banding - metal banding shall be used to secure load. Straps shall be applied to each column or layer of boxes. Tie down straps shall be applied to each column of boxes at 90 degrees to the load straps. Edge protectors shall be used when securing fiberboard boxes.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

5.5. Marking

5.5.1 Packaging marking shall be visible, clear, and remain legible during normal life cycle handling.

5.5.2 All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked with item description, quantity, lot number, or serial number. The outer shipping container and unitized load shall indicate load weight, UN dangerous goods proper shipping name, UN number and UN POP marking.

5.5.3 Each package shipping container shall show the United Nations packaging symbol and applicable codes in accordance with the construction requirements and testing of packaging as expressed in part 6 of the " United Nations Recommendations on the Transport of Dangerous Goods Model

Regulations, 13th Edition, 2003".

5.6. Additional Requirements for Hazardous Materials

5.6.1 The shipment shall be prepared in accordance with the "United Nations Recommendations on the Transport of Dangerous Goods Model Regulations, 13th Edition, 2003" and other applicable regulations effective at the time of shipment in a manner acceptable to the competent authority of the nation of origin and in accordance with the regulations of all applicable carriers.

5.6.2 Packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

a. International air transport: International Civil Aviation Organization (ICAO)

Technical Instructions for the Safe Transport of Dangerous Goods by Air, 2015-2016

Edition.

b. International vessel transport: International Maritime Organization (IMO)

International Maritime Dangerous Goods Code (IMDG), Amendment 34-08.

Lawrence W. Dring III

LTC, AC

Product Director Non-Standard Ammunition Picatinny Arsenal, NJ

Annex A: Weapon Interface

Annex B: Operating Requirements

APPENDIX – Definitions

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

ANNEX A - Weapon Interface

Note 1: These samples sizes shall be used to show performance and function and casualty at ambient temperature. If a lot fails, the contractor may propose a plan to repair/rework the entire lot and, if acceptable to the USG, the lot may be resubmitted for full visual/dimensional and ballistic LAT.

Note 2: 26 rounds (for GP 25/30 grenades) or 32 rounds (for RPG-7 and SPG-9 grenades) shall be tested for function and casualty at each of the operating temperature extremes. A single safety failure will result in lot reject, there shall be no retest. Functionality must be in accordance with the TDP.

Note 3: Any non-standard spin stabilized and rocket propelled grenades not listed in this table are required to meet sample size-accept-reject criteria listed in this table for which type it mostly closely resembles.

Note 4: The cartridges shall jump/bound after first impact and detonate at the intended height. A cartridge that detonates outside of the intended height is considered an out of mode function. A cartridge that does not detonate after first impact is a function failure.

c) A cartridge that damages the weapon or renders it inoperable without special tools.

Spin Stabilized Grenades

Item Weapon Interface Function and Casualty

Sample Size-Accept-Reject & Retest (cumulative)

40mm VOG-25

HE Frag.

GP 25/30 Grenade

Launcher

Function Failures; 26-0-1 or 46-1-2

Out of Mode Function3 (Bounding only);

26-2-3 or 46-4-5

40mm VOG-25P

HE Frag. Bounding

40mm GRD-40

Smoke

Rocket Propelled Grenades

Item Weapon Interface Function and Casualty

Sample Size-Accept-Reject & Retest (cumulative)

40mm OG-7V HE/FRAG

Grenade RPG-7

Grenade Launcher 32-0-1 or 60-1-2

PG-7VM 70.5mm HEAT

PG-7VL 93mm HEAT

73mm HE (OG-9V) SPG-9 Recoilless

Gun

15-0-1 or 29-1-2 73mm HEAT( PG-9V)

Note 5: The following safety failures shall result in the immediate rejection of the lot, there shall be no retest;

a) Detonation of a grenade within the weapon or before impact with the target.

b) Metal parts separation.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

ANNEX B - Operating Requirements

Spin Stabilized Grenades

Item

Muzzle

Velocity

(m/s)

Max. Average

Pressure

(MPa)

Max.

Effective Range

(m)

Lethal Fragmentation

Radius (m)

40mm VOG-25 HE Frag ≥ 70

≤ 85

≥ 400

≥ 5

40mm VOG-25P HE Frag

Bounding ≥ 70 ≥ 5

40mm GRD-40 Smoke2 ≥ 70 ≥ 50 -

Notes:

1. A minimum of 10 data points shall be required for each test parameter, however, it is permissible to leverage the same rounds to satisfy more than one requirement.

2. An early function which exposes the operator to smoke, fragmentation or fire shall result in lot rejection, there shall be no retest. An early function which does not expose the operator to smoke, frag or fire shall be considered a function failure. Failure to produce smoke shall be considered a function failure.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

ANNEX B - Operating Requirements (continued)

Rocket Propelled Grenades

Item

Muzzle

Velocity

(m/s)

Max. Average pressure

(MPa)

Max.

Effective

Range

(m)

Lethal

Frag.

Radius (m)

Armor

Penetration w/ 80% probability

40mm OG-7V

HE/FRAG

≥ 145

≤ 95

≥ 950 ≥ 22 -

PG-7V

HEAT

≥ 110 ≥ 350 - ≥ 260 mm

PG-7VM HEAT ≥ 135 ≥ 450 - ≥ 200 mm

PG-7VL HEAT ≥ 105 ≥ 250 - ≥ 400 mm

73mm HE OG-9V ≥ 310 ≤ 60 ≥ 450 ≥ 22 -

73mm HEAT PG-

9V ≥ 430 ≤ 67 ≥ 800 - > 300 mm

1. A minimum of 10 data points shall be required for each test parameter, however, it is permissible to leverage the same rounds to satisfy more than one requirement.

General Specification for Non-Standard Rocket Propelled & Spin Stabilized Grenades - 02 November 2015

APPENDIX

1. DEFINITIONS

1.1 Non Standard Rocket Propelled and Spin Stabilized Grenade Ammunition. Non-standard rocket propelled and spin stabilized grenade munitions are those munitions that have not been safety tested and type classified for Army use, cannot be procured through the Army supply. Munitions and explosives that are not managed by National Inventory Control Points, have not been safety tested nor type classified for Army use, do not have a national stock number (NSN) and cannot be procured or requisitioned through the Army or other Department of Defense supply system.

1.2 Technical data. Technical data, otherwise known as the technical data package (TDP) is the product specific technical drawings and Quality Assurance (QA) requirements to which ammunition and associated packaging is produced and accepted for each applicable Contract Line Item Number (CLIN).

For the purpose of this specification, the TDP, as a minimum, must contain the following: Government contract number and delivery order; top assembly, fuze and key component drawings with revision number, revision date, document control signature, key interface dimensions, and a list of component assemblies with drawing numbers and revision dates; packaging and marking drawings with revision number, revision date, document control signature and markings; and product specification with final assembly, fuze and key component in-process acceptance test methods with sample size, and accept/reject criteria. Within the TDP there shall also be a clear cut-away and/or exploded drawing(s) to show all of the inner parts and workings of the fuze. Additionally, there shall be paragraphs which describe the fuze arming sequence and events leading to function.

1.3 Degradation. Ammunition with gross nonconformance to identified technical requirements, corrosion, cracks, deformation, and spillage.

1.4 Deterioration. Packaging ripped, broken, perforated, with water damage, crushed.

1.5 Skip-Lot Temperature Testing. Testing at the operational temperature limits shall be conducted on the first lot of every delivery order and every 5th lot thereafter. The ammunition must pass the requirements defined in ANNEX A. If a lot is rejected for any reason, the following two lots must pass temperature testing before resuming the skip lot procedures.