B08 - W15P7T-27-R-A001 - Attachment 0006- Cost Price Proposal Workbook_Final.xlsx

XLSX spreadsheet 81 KB Posted

Attached to
System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
Solicitation number
W15P7T-27-R-A001
Issued by

About this file

This is a Cost-Plus-Fixed Fee (CPFF) Cost Price Proposal Workbook template for System Engineering and Technical Assistance (SETA) support services for the Army's Public Safety Communications (PSC) program under contract W15P7T-27-R-A001. The workbook provides instructions and pre-formatted sections for offerors to submit labor rates, staffing levels, and cost proposals across multiple contract periods, including a base period, two option periods, and a six-month extension option.

The proposal requires offerors to input direct labor costs (unburdened), fringe benefits percentages, overhead percentages, and G&A on labor percentages for ten designated position categories: Engineering Program Manager, BECS Technical Site Lead, Cybersecurity Specialist, Next Generation 9-1-1 (NG-911) PSAP Engineer (Key Personnel), NG-911 PSAP Voice Engineer, Land Mobile Radio Engineer, Asset/Configuration Manager, and three optional positions (Senior NG-911 PSAP Engineer, Journeyman NG-911 PSAP Engineer, and Senior GIS Engineer). The workbook includes an Independent Government Estimate (IGE) section detailing estimated labor rates, hours (1,980 hours per year for most positions, 1,980 hours for optional positions, and 990 hours for the six-month extension), FTE counts, and monthly cost breakdowns for Option Years 1 and 2. Travel costs are pre-populated with a SETA Plug amount of $168,740 for the base period and each option year, and $74,360 for the six-month extension, covering airfare, ground transportation, lodging, and meals for PSAP and LMR modernization activities. All proposals must be marked as Source Selection Information and marked "FOR OFFICIAL USE ONLY" upon completion, with proposals valid for 180 days from the proposal date.

View the file

Other files

File Type Posted
B08 - W15P7T-27-R-A001 - Attachment 0006- Cost Price Proposal Workbook_Final.xlsx XLSX spreadsheet
Attachment 0007-RFP Industry- BECS Q_A Sheet_Rev16Sep26.xlsx XLSX spreadsheet
B08 - W15P7T-27-R-A001 - Attachment 0001 - PWS - SETA PSC _19Aug2026__Rev01.pdf PDF
W15P7T-27-R-A001- FINAL RFP - SETA PSC_20Aug2026_ Rev01.docx DOCX document
W15P7T-27-R-A001- DRAFT RFP - SETA PSC_20Aug2026_ Rev01.docx DOCX document
B08 - W15P7T-27-R-A001 - Attachment 0005 - Corporate Experience Information Form_Rev01.docx DOCX document
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Tracked_Rev01.docx DOCX document
W15P7T-26-R-SETA - Attachment 0007-RFP Industry- BECS Q_A Sheet_04Sep2026.xlsx XLSX spreadsheet
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Final..docx DOCX document
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Final.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Final.docx DOCX document
B08 - W15P7T-27-R-A001 -Attachment 0001 -PWS - SETA PSC_19Aug2026_Final..pdf PDF
B08-CDRL G001_Contractor Travel_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0004 - Organizational Conflict of Interest (OCI)_Final.docx DOCX document
B08-CDRL A002_POAMs_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0002 - Quality Assurance Surveillance Plan_Final.pdf PDF
B08 - W15P7T-27-R-A001- DRAFT RFP - SETA PSC_20Aug2026_ Final.pdf PDF
B08-CDRL A001_Monthly Progress Report_SETA for PSC.pdf PDF
B08-CDRL D002 Cybersecurity Assessment Reports_BECS SETA.pdf PDF
B08-CDRL E003 Asset Database Synchronization_SETA for PSC.pdf PDF
B08-CDRL F001_Monthly Invoice_BECS SETA.pdf PDF
B08-CDRL A004_Quarterly Program Management Reviews (QPMRs)_BECS SETA.pdf PDF
B08-CDRL E002 Asset Database Updates_ BECS SETA.pdf PDF
B08-CDRL D001 Integration and Testing Plans_BECS SETA.pdf PDF
B08-CDRL A003_Risk Management Plan (RMP)_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0006- Cost Price Proposal Workbook_Final.xlsx XLSX spreadsheet
B08 - W15P7T-27-R-A001 - Attachment 0007- RFP Industry Question Sheet_Final.xlsx XLSX spreadsheet
B08-CDRL B003 Architectural Modernization Plan_ SETA for PSC.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0005 - Corporate Experience Information Form_Final.docx DOCX document
B08-CDRL B001 ECPs_SETA for PSC.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0003 - Performance Assessment Questionnaire _Final.docx DOCX document
B08-CDRL B002 System Design Documents_ BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0001 - PWS - SETA PSC _19Aug2026_Final.pdf PDF
B08-CDRL E001 Asset Database Entries_ BECS SETA.pdf PDF
A03-CDRL G002_Non-Disclosure Agreement (NDA)_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0003 - Performance Assessment Questionnaire _Signature Page.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Offeror Name:
Cage Code:
Proposal Date:
Valid for 180 days of Proposal Date:
Government Instructions to Offerors
Cost Plus Fixed Fee (CPFF) & Cost Contract
TabInstructions
Price_Cost SummaryInput Date - Do not edit on this tab. All cells will auto-populate from the subsequent Base and Option period tabs and travel tab.
Base PeriodInput pricing data into the Highlighted Cells G5 through L14 (or for all applicable labor categories). Offerors must complete the columns for Prime or Sub, Direct Labor (Unburdened), Fringe Benefits %, Overhead %, G&A on Labor %, and Direct Labor (Burdened).
Option Period 1Mirror the input process from the Base Period for the Option 1 performance period. Complete all required labor and rate cells.
Option Period 2Mirror the input process from the Base Period for the Option 2 performance period. Complete all required labor and rate cells.
(-8) Option to ExtendMirror the input process from the Base Period for the 6-Month Extension period. Complete all required labor and rate cells.
TravelInput applicable rates and amounts only into the highlighted cells (e.g., General & Administrative rates). Do not modify the pre-populated SETA Plug amounts. ONLY enter data in Green cell.
NOTES TO OFFERORS:All prices proposed in this workbook, if awarded, will be deemed contractual amounts.
The following positions are NOT required to be staffed at contract award, but cost proposal will be evaluated:
Next Generation 9-1-1 (NG-911) PSAP Engineer, Senior
Next Generation 9-1-1 (NG-911) PSAP Engineer, Journeyman
Geographic Information Systems (GIS) Engineer, Senior

Price_Cost Summary

PRICE/COST SUMMARY WORKBOOK
PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
Price/Cost Proposal Workbook
Date:
PD BECS POSITION DESCRIPTIONLEVELU.S. Bureau of Labor StatisticsTYPEBASE PERIODOPTION PERIOD 1OPTION PERIOD 2FAR 52.217-8 (6mos)TOTAL PRICE
Engineering Program Manager (KP)SMEProgram /Project Manager IIICPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
BECS Technical Site LeadSeniorProgram /Project Manager IICPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
Cybersecurity SpecialistSeniorInformation System Security IIICPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
Next Generation 9-1-1 (NG-911) PSAP Engineer (KP)SMESystems Engineer IVCPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
Next Generation 9-1-1 (NG-911) PSAP Voice Engineer (KP)SMEEngineer IVCPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
Land Mobile Radio Engineer (KP)SMERadio Frequency Engineer IIICPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
Asset/Configuration ManagerJourneymanConfiguration Specialist ICPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
*Next Generation 9-1-1 (NG-911) PSAP EngineerSeniorSystems Engineer IVCPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
*Next Generation 9-1-1 (NG-911) PSAP EngineerJourneymanEngineer IICPFF$ - 0$ - 0$ - 0$ - 0$ - 0000
*Geographic Information Systems (GIS) EngineerSeniorEngineer IIICPFF$ - 0$ - 0$ - 0$ - 0$ - 0000

Travel COST $ - 0 $ - 0 $0.00 $0.00 $ - 0

Total Cost$ - 0
Key Personnel (KP)
*These positions are not required to be staffed at contract award (Rows 13-15)

Base Period Base Period of Performance

PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
PD BECS POSITION DESCRIPTIONU.S. Bureau of Labor StatisticsLevelGov't Site / CTR SiteFTE CountPrime or SubDirect Labor (Unburdened)Fringe Benefits - %Overhead - %G&A on Labor - %Direct Labor (Burdened)Labor HrsAmount
Engineering Program Manager (KP)Program /Project Manager IIISMECTR1.001980$ - 0
BECS Technical Site LeadProgram /Project Manager IISeniorCTR1.001980$ - 0
Cybersecurity SpecialistInformation System Security IIISeniorCTR2.003960$ - 0
Next Generation 9-1-1 (NG-911) PSAP Engineer (KP)Systems Engineer IVSMECTR1.001980$ - 0
Next Generation 9-1-1 (NG-911) PSAP Voice Engineer (KP)Engineer IVSMECTR1.001980$ - 0
Land Mobile Radio Engineer (KP)Radio Frequency Engineer IIISMECTR1.001980$ - 0
Assett/Configuration ManagerConfiguration Specialist IJourneymanCTR1.001980$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerSystems Engineer IVSeniorCTR2.001980$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerEngineer IIJourneymanCTR2.001980$ - 0
*Geographic Information Systems (GIS) EngineerEngineer IIISeniorCTR1.001980$ - 0

* These positions are not required to be staffed at contract award (Rows 13-15) Total Cost $ - 0

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Encl 6, IGCE 11 Sep 2018/v5

Option Period 1 Option Period 1 - Period of Performance

PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
PD BECS POSITION DESCRIPTIONU.S. Bureau of Labor StatisticsLevelGov't Site / CTR SiteFTE CountPrime or SubDirect Labor (Unburdened)Fringe Benefits - %Overhead - %G&A on Labor - %Direct Labor (Burdened)Labor HrsAmount
Engineering Program Manager (KP)Program /Project Manager IIISMECTR1.001980$ - 0
BECS Technical Site LeadProgram /Project Manager IISeniorCTR1.001980$ - 0
Cybersecurity SpecialistInformation System Security IIISeniorCTR2.003960$ - 0
Next Generation 9-1-1 (NG-911) PSAP Engineer (KP)Systems Engineer IVSMECTR1.001980$ - 0
Next Generation 9-1-1 (NG-911) PSAP Voice Engineer (KP)Engineer IVSMECTR1.001980$ - 0
Land Mobile Radio Engineer (KP)Radio Frequency Engineer IIISMECTR1.001980$ - 0
Assett/Configuration ManagerConfiguration Specialist IJourneymanCTR1.001980$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerSystems Engineer IVSeniorCTR2.001980$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerEngineer IIJourneymanCTR2.001980$ - 0
*Geographic Information Systems (GIS) EngineerEngineer IIISeniorCTR1.001980$ - 0

* These positions are not required to be staffed at contract award (Rows 13-15) Total Cost $ - 0

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Option Period 2 Option Perod 2 - Period of Performance

PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
PD BECS POSITION DESCRIPTIONU.S. Bureau of Labor StatisticsLevelGov't Site / CTR SiteFTE CountPrime or SubDirect Labor (Unburdened)Fringe Benefits - %Overhead - %G&A on Labor - %Direct Labor (Burdened)Labor HrsAmount
Engineering Program Manager (KP)Program /Project Manager IIISMECTR1.001980$ - 0
BECS Technical Site LeadProgram /Project Manager IISeniorCTR1.001980$ - 0
Cybersecurity SpecialistInformation System Security IIISeniorCTR2.003960$ - 0
Next Generation 9-1-1 (NG-911) PSAP Engineer (KP)Systems Engineer IVSMECTR1.001980$ - 0
Next Generation 9-1-1 (NG-911) PSAP Voice Engineer (KP)Engineer IVSMECTR1.001980$ - 0
Land Mobile Radio Engineer (KP)Radio Frequency Engineer IIISMECTR1.001980$ - 0
Assett/Configuration ManagerConfiguration Specialist IJourneymanCTR1.001980$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerSystems Engineer IVSeniorCTR2.001980$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerEngineer IIJourneymanCTR2.001980$ - 0
*Geographic Information Systems (GIS) EngineerEngineer IIISeniorCTR1.001980$ - 0

* These positions are not required to be staffed at contract award (Rows 13-15) Total Cost $ - 0

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

(-8) Option to Extend

(-8) OPTION TO EXTEND SERVICES
PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
(-8) OPTION TO EXTEND Period of Performance
POSITION DESCRIPTIONGSA ALLIANT 2 LCAT MAPPINGLevelGov't Site / CTR SiteFTE CountDirect Labor (Unburdened)Fringe Benefits - %Overhead - %G&A on Labor - %Direct Labor (Burdened)Labor HrsAmount
Engineering Program Manager (KP)Program /Project Manager IIISMECTR1.00990$ - 0
BECS Technical Site LeadProgram /Project Manager IISeniorCTR1.00990$ - 0
Cybersecurity SpecialistInformation System Security IIISeniorCTR2.001980$ - 0
Next Generation 9-1-1 (NG-911) PSAP Engineer (KP)Systems Engineer IVSMECTR1.00990$ - 0
Next Generation 9-1-1 (NG-911) PSAP Voice Engineer (KP)Engineer IVSMECTR1.00990$ - 0
Land Mobile Radio Engineer (KP)Radio Frequency Engineer IIISMECTR1.00990$ - 0
Assett/Configuration ManagerConfiguration Specialist IJourneymanCTR1.00990$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerSystems Engineer IVSeniorCTR2.00990$ - 0
*Next Generation 9-1-1 (NG-911) PSAP EngineerEngineer IIJourneymanCTR2.00990$ - 0
*Geographic Information Systems (GIS) EngineerEngineer IIISeniorCTR1.00990$ - 0

* These positions are not required to be staffed at contract award (Rows 13-15) Total Cost $ - 0

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

Travel Travel Amount Rate Total

TravelBase Period
AmountRateTotal
SETA Plug$ 168,740.00$168,740.00
General & Administrative$0.00
TOTAL PROPOSED$0.00
TravelOption Period 1
AmountRateTotal
SETA Plug$ 168,740.00$168,740.00
General & Administrative$0.00
TOTAL PROPOSED$0.00
TravelOption Period 2
AmountRateTotal
SETA Plug$ 168,740.00$168,740.00
General & Administrative$0.00
TOTAL PROPOSED$0.00
Travel6 Month Option to Extend
AmountRateTotal
SETA Plug$ 74,360.00$74,360.00
General & Administrative$0.00
TOTAL PROPOSED$0.00
Travel$0.00
G&A$0.00
Total Travel Cost$0.00

(CUI) IGE-Option Year 1

CUI

PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
Independent Government Estimate (IGE)
Option Year 1 Period of Performance - 14 May 2027 - 13 May 2028
Option Year 1
Labor CategoryGovernment Site / Contractor SiteDeveloped/Source Labor Hr RateProjected Labor HoursFTE CountDirect Labor (Unburdened)Fringe Benefits - 15.00%Overhead - 35.00%G&A on Labor - 10.00%Estimated Direct Labor (Burdened)Amount
BECS Engineering Program ManagerContractor47QTCK18D0009/47QFCA19F000619801.00$103.83$25.96$36.34$10.38$176.51$ 378,613.95
BECS Cybersecurity SpecialistContractor47QTCK18D0009/47QFCA19F000619802.00$95.34$23.59$33.02$9.43$161.38$ 692,320.20
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - PrincipalContractor47QTCK18D0009/47QFCA19F000619801.00$101.73$25.44$35.61$10.17$172.95$ 370,977.75
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - PrincipalContractor47QTCK18D0009/47QFCA19F000619801.00$98.24$24.56$34.39$9.83$167.02$ 358,257.90
BECS Enterprise Mass Warning & Notification (EMWN) Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619801.00$85.29$21.32$29.85$8.53$144.99$ 311,003.55
BECS Geospatial Information Systems (GIS) Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619801.00$89.00$22.25$31.15$8.90$151.30$ 324,538.50
BECS Land Mobile Radio Engineer - PrincipalContractor47QTCK18D0009/47QFCA19F000619802.00$101.34$25.34$35.47$10.13$172.28$ 739,081.20
BECS Assett/Configuration Manager - JourneymanContractorGSA Pricing19801.00$67.20$16.80$23.52$6.72$114.24$ 245,044.80
BECS Financial AnalystContractor47QTCK18D0009/47QFCA19F000619801.00$61.18$15.30$21.42$6.12$104.02$ 223,122.90
11.00$ 3,642,960.75
Support Growth (PSAP (LIS) & ESINet)
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619802.00$91.55$22.89$32.05$9.16$155.65$ 667,738.50
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619805.00$88.42$22.11$30.95$8.84$150.32$ 1,612,182.00
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - JourneymanContractor47QTCK18D0009/47QFCA19F000619804.00$88.90$22.22$31.11$8.89$151.12$ 1,135,134.00
BECS Next Generation 9-1-1 (NG9-1-1) Voice Engineer – JourneymanContractor47QTCK18D0009/47QFCA19F000619803.00$85.84$21.46$30.05$8.59$145.94$ 822,199.95
14.00$ 4,237,254.45
Total Labor$ 7,880,215.20
Travel/Other Direct Costs$ 168,740.00
Total OY1 Estimated Price$ 8,048,955.20
*See (CUI) IGE-OY1 Breakout for detailed breakout
ERROR:#REF!
CUI Category: PROCURE
ERROR:#REF!
ERROR:#REF!
CUI

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

(CUI) IGE-OY1 Breakout

CUI

PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
Independent Government Estimate (IGE)
Option Year 1 Period of Performance - 14 May 2027 - 13 May 2028
Option Year 1
Labor CategoryFTE CountRateHoursMay-26Jun-26Jul-26Aug-26Sep-26Oct-26Nov-26Dec-26Jan-27Feb-27Mar-27Apr-27May-27Total of Rows
BECS Engineering Program Manager1.00$ 176.511980$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 29,124.15$ 378,613.95
BECS Cybersecurity Specialist2.00$ 161.381980$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 53,255.40$ 692,320.20
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - Principal1.00$ 172.951980$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 28,536.75$ 370,977.75
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - Principal1.00$ 167.021980$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 27,558.30$ 358,257.90
BECS Enterprise Mass Warning & Notification (EMWN) Engineer - Master1.00$ 144.991980$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 23,923.35$ 311,003.55
BECS Geospatial Information Systems (GIS) Engineer - Master1.00$ 151.301980$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 24,964.50$ 324,538.50
BECS Land Mobile Radio Engineer - Principal2.00$ 172.281980$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 56,852.40$ 739,081.20
BECS Assett/Configuration Manager - Journeyman1.00$ 114.241980$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 18,849.60$ 245,044.80
BECS Financial Analyst1.00$ 104.021980$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 17,163.30$ 223,122.90
11.00$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 280,227.75$ 3,642,960.75
Support Growth (ESINet)FTE CountRateHoursMay-26Jun-26Jul-26Aug-26Sep-26Oct-26Nov-26Dec-26Jan-27Feb-27Mar-27Apr-27May-27Total of Rows
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - Master2.00$ 155.651980$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 51,364.50$ 667,738.50
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - Master5.00$ 150.321980$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 124,014.00$ 1,612,182.00
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - Journeyman4.00$ 132.301980$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 87,318.00$ 1,135,134.00
BECS Next Generation 9-1-1 (NG9-1-1) Voice Engineer – Journeyman3.00$ 127.771980$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 63,246.15$ 822,199.95
14.00$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 325,942.65$ 4,237,254.45
Total OY1 Labor$ 7,880,215.20
Travel/Other Direct Costs (from below)**$ 168,740.00
Total OY1 Estimated Price$ 8,048,955.20
**Breakout of OY 1 Travel/ODC costs.
Travel/ODC
ProjectMonth Projected# of Days# of PersonnelAirfareGroundLodgingMeals and IncidentalsTotal Amount
PSAP ModernizationMay-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMay-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMay-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMay-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationJun-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationAug-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationOct-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationDec-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2751.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationFeb-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
Travel/Other Direct Costs Total$ 168,740.00

ERROR:#REF!

CUI

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

(CUI) IGE-Option Year 2

CUI

PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
Independent Government Estimate (IGE)
Option Year 2 Period of Performance - 14 May 2028 - 13 May 2029
Option Year 2
Labor CategoryGovernment Site / Contractor SiteDeveloped/Source Labor Hr RateProjected Labor HoursFTE CountDirect Labor (Unburdened)Fringe Benefits - 15.00%Overhead - 35.00%G&A on Labor - 10.00%Estimated Direct Labor (Burdened)Amount
BECS Engineering Program ManagerContractor47QTCK18D0009/47QFCA19F000619801.00$106.94$26.74$37.43$10.70$181.81$ 389,982.45
BECS Cybersecurity SpecialistContractor47QTCK18D0009/47QFCA19F000619802.00$97.77$24.45$34.22$9.78$166.22$ 713,083.80
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - PrincipalContractor47QTCK18D0009/47QFCA19F000619801.00$104.78$26.20$36.68$10.48$178.14$ 382,110.30
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - PrincipalContractor47QTCK18D0009/47QFCA19F000619801.00$101.19$25.30$35.42$10.12$172.03$ 369,004.35
BECS Enterprise Mass Warning & Notification (EMWN) Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619801.00$88.25$21.82$30.54$8.73$149.34$ 320,334.30
BECS Geospatial Information Systems (GIS) Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619801.00$91.67$22.92$32.08$9.17$155.84$ 334,276.80
BECS Land Mobile Radio Engineer - PrincipalContractor47QTCK18D0009/47QFCA19F000619802.00$104.38$26.10$36.53$10.44$177.45$ 761,260.50
BECS Assett/Configuration Manager - JourneymanContractorGSA Pricing19801.00$69.21$17.31$24.23$6.92$117.67$ 252,402.15
BECS Financial AnalystContractor47QTCK18D0009/47QFCA19F000619801.00$63.03$15.76$22.06$6.30$107.15$ 229,836.75
11.00$ 3,752,291.40
Support Growth (PSAP (LIS) & ESINet)
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619802.00$94.30$23.58$33.01$9.43$160.32$ 687,772.80
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - MasterContractor47QTCK18D0009/47QFCA19F000619805.00$91.07$22.77$31.88$9.11$154.83$ 1,660,551.75
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - JourneymanContractor47QTCK18D0009/47QFCA19F000619804.00$80.15$20.04$28.06$8.02$136.27$ 1,169,196.60
BECS Next Generation 9-1-1 (NG9-1-1) Voice Engineer – JourneymanContractor47QTCK18D0009/47QFCA19F000619803.00$77.42$19.35$27.09$7.74$131.60$ 846,846.00
14.00$ 4,364,367.15
Total Labor$ 8,116,658.55
Travel/Other Direct Costs$ 168,740.00
Total OY2 Estimated Price$ 8,285,398.55
*See (CUI) IGE-OY1 Breakout for detailed breakout
ERROR:#REF!
CUI Category: PROCURE
ERROR:#REF!
ERROR:#REF!
CUI

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

(CUI) IGE-OY2 Breakout

CUI

PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
Independent Government Estimate (IGE)
Option Year 2 Period of Performance - 14 May 2028 - 13 May 2029

tc={AA8E93D5-5C0E-416B-867C-76BD58986A97}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

POP might need to be revised

Option Year 2
Labor CategoryFTE CountRateHoursMay-26Jun-26Jul-26Aug-26Sep-26Oct-26Nov-26Dec-26Jan-27Feb-27Mar-27Apr-27May-27Total of Rows
BECS Engineering Program Manager1.00$ 181.811980$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 29,998.65$ 389,982.45
BECS Cybersecurity Specialist2.00$ 166.221980$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 54,852.60$ 713,083.80
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - Principal1.00$ 178.141980$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 29,393.10$ 382,110.30
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - Principal1.00$ 172.031980$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 28,384.95$ 369,004.35
BECS Enterprise Mass Warning & Notification (EMWN) Engineer - Master1.00$ 149.341980$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 24,641.10$ 320,334.30
BECS Geospatial Information Systems (GIS) Engineer - Master1.00$ 155.841980$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 25,713.60$ 334,276.80
BECS Land Mobile Radio Engineer - Principal2.00$ 177.451980$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 58,558.50$ 761,260.50
BECS Assett/Configuration Manager - Journeyman1.00$ 117.671980$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 19,415.55$ 252,402.15
BECS Financial Analyst1.00$ 107.151980$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 17,679.75$ 229,836.75
11.00$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 288,637.80$ 3,752,291.40
Support Growth (ESINet)FTE CountRateHoursMay-26Jun-26Jul-26Aug-26Sep-26Oct-26Nov-26Dec-26Jan-27Feb-27Mar-27Apr-27May-27Total of Rows
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - Master2.00$ 160.321980$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 52,905.60$ 687,772.80
BECS Next Generation 9-1-1 (NG-911) Voice Engineer - Master5.00$ 154.831980$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 127,734.75$ 1,660,551.75
BECS Next Generation 9-1-1 (NG-911) PSAP Engineer - Journeyman4.00$ 136.271980$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 89,938.20$ 1,169,196.60
BECS Next Generation 9-1-1 (NG9-1-1) Voice Engineer – Journeyman3.00$ 131.601980$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 65,142.00$ 846,846.00
14.00$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 335,720.55$ 4,364,367.15
Total OY2 Labor

tc={194BEDCB-093B-4A63-A7D7-3303CD6F7BAC}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Is this supposed to be OY2?$ 8,116,658.55
Travel/Other Direct Costs (from below)**$ 168,740.00
Total OY2 Estimated Price$ 8,285,398.55
**Breakout of OY 2 Travel/ODC costs.
Travel/ODC
ProjectMonth Projected# of Days# of PersonnelAirfareGroundLodgingMeals and IncidentalsTotal Amount
PSAP ModernizationMay-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMay-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMay-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMay-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationJun-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJun-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJul-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationAug-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationAug-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationSep-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationOct-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationOct-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationNov-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationDec-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationDec-2851.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationJan-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
LMR ModernizationFeb-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationFeb-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
PSAP ModernizationMar-2951.00$ 1,225.00$ 550.00$ 725.00$ 360.00$ 2,860.00
Travel/Other Direct Costs Total$ 168,740.00

ERROR:#REF!

CUI

POP might need to be revised

Is this supposed to be OY2?

When completed, this document shall be marked: Source Selection Information - See FAR 2.101 and 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it. Updated .