About this file
This is a DD Form 1423-1, Contract Data Requirements List (CDRL), which specifies contractual data deliverables for a federal procurement. The document requires the contractor to deliver one data item: a Risk Management Plan (RMP) for contract line item A003 under the BECS SETA for PSC contract (Contract/PR No. TBD). The RMP must be prepared in accordance with BECS SETA for PSC PWS Paragraph 6.9, using the contractor's format with DI-MGMT-81808 as a reference source. The data item is categorized as "OTHER" and falls under Application Code D.
The contractor shall deliver the initial RMP within 60 business days from contract award, with monthly risk updates thereafter per the DELIVERABLES/DELIVERY SCHEDULE in Table 1. The RMP will be reviewed for acceptance by the Government Program Management Office (PMO), which shall have full access to validate information and access the Risk Register on an ad hoc basis without notice. The Government has five working days to review and comment on draft deliverables; the contractor must incorporate Government comments into the final version within three calendar days of receipt. Distribution is authorized to PD BECS and the Contracting Officer Review (COR), with one copy each required in draft and final form. The requirement includes a Letter of Transmittal (Block 7) and uses DISTRIBUTION STATEMENT D for restricted technical documentation. All deliverables shall be submitted electronically whenever feasible, otherwise in hard copy, with notification to the assigned Contracting Officer Representative.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER
Form Approved OMB No. 0704-0188
15. TOTAL
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
DIST
22202-4302.
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR GOVERNMENT PERSONNEL
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
FOR THE CONTRACTOR
DD FORM 1423-1 (BACK), FEB 2001
| 1_DATA_ITEM_NO: A003 |
| 2_TITLE_OF_DATA_ITEM: Risk Management Plan (RMP) |
| 3_SUBTITLE: Risk Management Plan (RMP) |
| 4_AUTHORITY_Data_Acquisit: DI-MGMT-81808 |
| 5_CONTRACT_REFERENCE: BECS SETA for PSC PWS 6.9 |
| 6_REQUIRING_OFFICE: PD BECS |
| 7_DID_250_REQ: LT |
| 8_APP_CODE: A |
| 10_FREQUENCY: SEE ITEM 16 |
| 12_DATE_OF_FIRST_SUBMISSI: SEE ITEM 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: SEE ITEM 16 |
| DIST_STATEMENT: D |
| 11_AS_OF_DATE: SEE ITEM 16 |
| addressee1: PD BECS |
| draft1: 1 |
| reg1: 1 |
| repro1: |
| draft2: 1 |
| addressee2: COR |
| reg2: 1 |
| repro2: 1 |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| addressee12: |
| addressee13: |
| addressee14: |
| addressee15: |
| addressee16: |
| addressee17: |
| addressee18: |
| addressee19: |
| addressee20: |
| addressee29: |
| addressee30: |
| draft20: |
| draft19: |
| draft18: |
| draft17: |
| draft16: |
| draft15: |
| draft14: |
| draft13: |
| draft12: |
| draft11: |
| draft29: |
| draft30: |
| reg11: |
| reg12: |
| reg13: |
| reg14: |
| reg15: |
| reg16: |
| reg17: |
| reg18: |
| reg19: |
| reg20: |
| reg29: |
| reg30: |
| repro11: |
| repro12: |
| repro13: |
| repro14: |
| repro15: |
| repro16: |
| repro17: |
| repro18: |
| repro19: |
| repro20: |
| repro29: |
| repro30: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee31: |
| addressee32: |
| addressee33: |
| addressee34: |
| addressee35: |
| addressee36: |
| addressee37: |
| addressee38: |
| draft31: |
| reg31: |
| repro31: |
| draft32: |
| draft33: |
| draft34: |
| draft35: |
| draft36: |
| draft37: |
| reg32: |
| reg33: |
| reg34: |
| reg35: |
| reg36: |
| reg37: |
| repro32: |
| repro33: |
| repro34: |
| repro35: |
| repro36: |
| repro37: |
| draft38: |
| repro38: |
| total_draft: 2 |
| total_repro: 1 |
| 16_REMARKS: Block 5: |
Contractor shall provide a Risk Management Plan in accordance with the BECS SETA for PSC PWS Paragraph 6.9. Contractor’s format will be utilized and DI-MGMT-81808 will be used as a reference source.
Block 7:
Letter of Transmittal
Block 9:
Use the following “DISTRIBUTION STATEMENT D”. Distribution is authorized of technical documents to DoD components and their contractors with a “need-to-know” only. (Reason: for Administrative or Operational purposes, to protect critical technology and technical data that would provide insight into the vulnerabilities of U.S. critical infrastructure, including warfighting capabilities vital to National Security that would otherwise not be publicly available.) Other requests shall be referred to those listed in Block 14. (Date: 18 MAR 26)
Blocks 10-13:
The Contractor shall deliver the initial Risk Management Plan within 60 business days from award and provide monthly risk updates thereafter, in accordance with the DELIVERABLES/DELIVERY SCHEDULE, Table 1, Deliverable Schedule. The RMP will be reviewed for acceptance by the Government PMO. The PMO shall be granted full access to validate the information in the Contractor’s submission and to access the Risk Register on an ad hoc basis without notice or upon replacement or rotation of the Government PM.
The Government will have five (5) working days to review, accept, and/or comment on the draft deliverable. After the Government reviews and comments on the deliverable, the Contractor shall incorporate Government comments/submit change pages into the final deliverable within 3 calendar days after the receipt of the comments/need for revision is identified unless extended by the Contracting Officer.
Block 14:
Notification of delivery shall be made to the assigned COR. Any further distribution beyond what is listed will be authorized by the Program Management Office (PMO)
| A_CONTRACT_LINE_ITEM_NO: A003 |
| B_EXHIBIT: A |
| TDP: |
| TM: |
| OTHER: X |
| DSYSTEMITEM: BECS SETA for PSC |
| E_CONTRACTPR_NO: TBD |
| FCONTRACTOR: TBD |
| 16_REMARKS_Continued: Note: The Government Procuring Contracting Officer (PCO) does not require the formal deliverable, however a Letter of Transmittal shall be sent to the PCO to document delivery notification and compliance with this CDRL. Deliver all copies via electronic media whenever feasible, otherwise deliver in hard copy. |
| of_pages: |
| Reset: |
| Page2: |
| ADN: |
| send_to: |
| 17_1: |
| 17_b: |
| 17_c: |
| 17_d: |
| 17_PRICE_GROUP: |
| ESTIMATED_TOTAL_PRICE: |
| H_DATE: 18 MAR 26 |
| J_DATE: |
| Page: |
| reg38x: |
| reg38t: 2 |
| title: |
File details come from the government source that posted it. Updated .