This is a Questions and Answers sheet documenting industry inquiries and government responses regarding RFP W15P7T-27-R-A001 for System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC). The Q&A sheet, revised as of September 26, 2026, addresses 29 questions submitted by potential offerors between August 27 and September 7, 2026, with responses from Contracting Officer Katia Lacoste and Contract Specialist Rosa Acevedo.

The Q&A clarifies key proposal requirements and contract terms, including: work location and travel compensation per PWS Section 7; no GSA schedule requirement; prohibition against proposing the same individual for multiple Key Personnel positions; revised Attachment 0005 (Corporate Experience Information Form) requirements; and confirmation that all attachments, including the Cost/Price Proposal Workbook (Attachment 0006), are available. The government removed the DAWIA Certification requirement from position A.1 but declined to reduce minimum experience requirements (15 years for positions A.1, A.7, and A.9; 12 years for positions A.3, A.4, and A.5) and will not convert the contract from Cost-Plus-Fixed Fee (CPFF) to Firm Fixed Price (FFP). Additional clarifications address Past Performance submission procedures, page limits, CPARS availability, and GIS/LIS deliverables. The incumbent contractor is CACI with subcontractor Netmaker Communications under a task order valued at $2,544,295. The government anticipates contract award in November 2026, and no Industry Days or Forecast Briefings were held prior to this solicitation.

View the file

Other files

File Type Posted
B08 - W15P7T-27-R-A001 - Attachment 0006- Cost Price Proposal Workbook_Final.xlsx XLSX spreadsheet
B08 - W15P7T-27-R-A001 - Attachment 0001 - PWS - SETA PSC _19Aug2026__Rev01.pdf PDF
W15P7T-27-R-A001- FINAL RFP - SETA PSC_20Aug2026_ Rev01.docx DOCX document
W15P7T-27-R-A001- DRAFT RFP - SETA PSC_20Aug2026_ Rev01.docx DOCX document
B08 - W15P7T-27-R-A001 - Attachment 0005 - Corporate Experience Information Form_Rev01.docx DOCX document
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Tracked_Rev01.docx DOCX document
W15P7T-26-R-SETA - Attachment 0007-RFP Industry- BECS Q_A Sheet_04Sep2026.xlsx XLSX spreadsheet
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Final..docx DOCX document
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Final.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0001 - Draft PWS - SETA PSC _19Aug2026_Final.docx DOCX document
B08 - W15P7T-27-R-A001 -Attachment 0001 -PWS - SETA PSC_19Aug2026_Final..pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0006- Cost Price Proposal Workbook_Final.xlsx XLSX spreadsheet
B08-CDRL G001_Contractor Travel_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0004 - Organizational Conflict of Interest (OCI)_Final.docx DOCX document
B08-CDRL A002_POAMs_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0002 - Quality Assurance Surveillance Plan_Final.pdf PDF
B08 - W15P7T-27-R-A001- DRAFT RFP - SETA PSC_20Aug2026_ Final.pdf PDF
B08-CDRL A001_Monthly Progress Report_SETA for PSC.pdf PDF
B08-CDRL D002 Cybersecurity Assessment Reports_BECS SETA.pdf PDF
B08-CDRL E003 Asset Database Synchronization_SETA for PSC.pdf PDF
B08-CDRL F001_Monthly Invoice_BECS SETA.pdf PDF
B08-CDRL A004_Quarterly Program Management Reviews (QPMRs)_BECS SETA.pdf PDF
B08-CDRL E002 Asset Database Updates_ BECS SETA.pdf PDF
B08-CDRL D001 Integration and Testing Plans_BECS SETA.pdf PDF
B08-CDRL A003_Risk Management Plan (RMP)_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0006- Cost Price Proposal Workbook_Final.xlsx XLSX spreadsheet
B08 - W15P7T-27-R-A001 - Attachment 0007- RFP Industry Question Sheet_Final.xlsx XLSX spreadsheet
B08-CDRL B003 Architectural Modernization Plan_ SETA for PSC.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0005 - Corporate Experience Information Form_Final.docx DOCX document
B08-CDRL B001 ECPs_SETA for PSC.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0003 - Performance Assessment Questionnaire _Final.docx DOCX document
B08-CDRL B002 System Design Documents_ BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0001 - PWS - SETA PSC _19Aug2026_Final.pdf PDF
B08-CDRL E001 Asset Database Entries_ BECS SETA.pdf PDF
A03-CDRL G002_Non-Disclosure Agreement (NDA)_BECS SETA.pdf PDF
B08 - W15P7T-27-R-A001 - Attachment 0003 - Performance Assessment Questionnaire _Signature Page.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions-Responses

Contracting Officer: Katia Lacoste /Contract Specialist: Rosa Acevedo
Industry Questions/Responses: RFP for PD BECS System Engineering and Technical Assistance (SETA) Support for Public Safety Communications (PSC)
DateSolicitation Reference (Document)Page, Paragraph, or SectionRFP Language/Reference TextClarification (s), question (s), supporting rationale, proposed changes, etc.Government Response
8/27/26W15P7T-27-R-A001GeneralN/AWhat percentage (if any) of the work is required to be performed on-site? Will contractors be able to charge a higher rate for on-site work to accommodate travel time or directly bill for travel time to reach the site?Refer to PWS Section 7.
8/27/26W15P7T-27-R-A001GeneralN/ADoes the contractor require any type of small business certification? What type of documentation is required to prove that the small business threshold is met? Is SAM registration sufficient to qualify for this opportunity?See Volume VI, Page 14 of the RFP.
8/27/26W15P7T-27-R-A001GeneralN/AIs the contractor required to have a GSA schedule?GSA schedule not required.
8/27/26W15P7T-27-R-A001Table 1, Page 4Solicitation, Offer, and Award Documents and Certification/ Representation.What forms are to be used for the respondent to provide this information?See Volume VI, Page 14 of the RFP.
8/27/26W15P7T-27-R-A001Resumes, Page 9,10The Offeror must identify and propose the following Key PersonnelCan the same person be proposed for multiple Key Personnel positions?No, the same person cannot be proposed for multiple Key Personnel positions.
8/27/26W15P7T-27-R-A001Experience, Page 10Offerors must submit a summary of Corporate Experience Information Form Attachment 0005Are respondents required to submit one Attachment 005 form for each of the five functional areas shown on page 10?Attachment 0005 has been revised. Revised portion is highlighted in yellow for ease of reference. See RFP Section B. PROPOSAL VOLUMES - Table 1 .
8/27/26W15P7T-27-R-A001Cost/Price, Page 11To help ensure this requirement, a Microsoft Excel workbook titled “Cost Price Proposal Workbook” has been provided as Attachment 0006 to this solicitationAttachment 0006 is not currently available. When will that be provided?All attachments are available and viewable.
8/27/26W15P7T-27-R-A001Volume III: Experience, Page 10Enterprise Mass Warning & NotificationThis EMWN is mentioned as a functional area, but not as a position in terms of "Key Personnel". Can the contractor then provide evidence of this experience and expertise via a separte resume/individual separate the four key personnel on P10 (Engineering Program Manager, NG-911 PSAP Engineer, NG-911 Voice Engineer, and Land Mobile Radio Engineer)? Additionally, can the government provide more details regarding the type of experience required? Is the warning and notification for Army personnel, or the public?While EMWN is a functional area of BECS, there's no dedicated EMWN position required for this effort. PD BECS is focused on the interoperability of EMWN with the other BECS capabilities. Refer to PWS section 5.6.
8/28/26PWS DeliverablesArchitectural Modernization Planning and System Design DocumentsGiven the draft PWS deliverables around Architectural Modernization Planning and System Design Documents, I have a scoping question: does the Architectural Modernization Plan deliverable anticipate network performance monitoring and fault-localization capability as part of the modernized BECS architecture, or is monitoring/observability tooling addressed under a separate contract vehicle?Network performance monitoring and fault-localization would be addressed under a separate vehicle.
8/28/26No DCAA CASAs a small business without existing DCAA-compliant cost accounting infrastructure for a CPFF prime role, I'm specifically interested in subcontracting opportunities under whichever firm is ultimately awarded this contract. Is there a small-business specialist for this program, or for CPE C2IN more broadly, you could point me to for that purpose?Please visit SAM.GOV as interested parties are viewable. Vendors can also reach out to office of Small Business Programs (OSBP) if they have general questions. Please refer to: usarmy.apg.acc.mbx.small-business-outreach@army.mil.***********
28-AugPerformance Work StatementPage 22, Section A.1Minimum Experience of Fifteen (15) years of progressively responsible experienceWill the Government consider ten years of experience for this position? This request is made to align qualification standards with actual mission needs, labor market realities, and demonstrated competency patterns in comparable federal support environments.No changes will be made to the RFP.
28-AugPerformance Work StatementSection A.1Defense Acquisition Workforce Improvement Act (DAWIA)/Back-to-Basics Acquisition
CertificationWould the Government consider accepting other DAWIA-equivalent certifications or training in lieu of the DAWIA because the DAWIA Certification is only available to DoW employees, military and (APF) civilians assigned to an acquisition coded position as well as select military officers whose career development will include assignment to acquisition coded positions?The Government has removed the DAWIA Certification requirement. Refer to PWS section A.1
28-AugPerformance Work StatementPage 24, Section A.3Minimum Experience of twelve (12) yearsWill the Government consider ten years of experience for this position? This request is made to align qualification standards with actual mission needs, labor market realities, and demonstrated competency patterns in comparable federal support environments.No changes will be made to the RFP.
28-AugPerformance Work StatementPage 24, Section A.4Minimum Experience of twelve (12) yearsWill the Government consider ten years of experience for this position? This request is made to align qualification standards with actual mission needs, labor market realities, and demonstrated competency patterns in comparable federal support environments.No changes will be made to the RFP.
28-AugPerformance Work StatementPage 25, Section A.5Minimum Experience of twelve (12) yearsWill the Government consider ten years of experience for this position? This request is made to align qualification standards with actual mission needs, labor market realities, and demonstrated competency patterns in comparable federal support environments.No changes will be made to the RFP.
28-AugPerformance Work StatementPage 26, Section A.7Minimum Experience of Fifteen (15) years of progressively responsible experienceWill the Government consider ten years of experience for this position? This request is made to align qualification standards with actual mission needs, labor market realities, and demonstrated competency patterns in comparable federal support environments.No changes will be made to the RFP.
28-AugPerformance Work StatementPage 28, Section A.9Minimum Experience of Fifteen (15) years of progressively responsible experienceWill the Government consider ten years of experience for this position? This request is made to align qualification standards with actual mission needs, labor market realities, and demonstrated competency patterns in comparable federal support environments.No changes will be made to the RFP.
28-AugRequest for ProposalPage 11, Volume IV: COST/PRICE 4.Cost Plus ContractThere are many advantages to the Government is selecting a Firm Fixed Price (FFP) contract over a Cost Plus contract. FFP contracts provide predictability, lower administrative load, stronger cost discipline, and faster execution compared to cost-plus contracts, making them a preferred choice in many procurement scenarios. Additionally, Senator John Cornyn of the Senate DOGE Caucus has publicly stated that FFP contracts will improve performance measurements and control costs. Will the Government change the contract award to FFP with T&M for travel and ODCs?This effort will not transition to FFP.
28-AugRequest for ProposalPage 5C. FACTORS TO BE EVALUATED:

VOLUME I: PAST PERFORMANCE

Factor 1 - Past Performance The Offeror may submit up to three (3) past performance examples for the Prime, and up to two (2) past performance examples for each proposed significant subcontractor. However the on Table on page 3 states that Attachment 003 should be included. Will the Government confirm that the Attachment 003 is only for Primes as the subcontractor does not receive CPARS? See RFP- C. FACTORS TO BE EVALUATED:

VOLUME I: PAST PERFORMANCE

Factor 1 - Past Performance, PAGE 7

28-AugRequest for ProposalPage 3B. PROPOSAL VOLUMES:
Table 1:Does the page limit of 3 for Past Performances include all past performances Prime and Subs which could amount up to 5? Would the Government consider a 5 page maximum for Past Performance?See RFP Section B. PROPOSAL VOLUMES - Table 1 .
28-AugRequest for ProposalPage 5C. FACTORS TO BE EVALUATED:

VOLUME I: PAST PERFORMANCE

Factor 1 - Past PerformanceThe Offeror shall submit a one (1) page summary of the Past Performance examples as part of their Past Performance Volume. Please clarify if this include in the 3 page Past Perfomance page limit.See RFP Section B. PROPOSAL VOLUMES - Table 1 .
28-AugAttachment 003AllAttachment 003Please clarify that if CPARS are available, then the additional Attachment 003 will not be required or included.If CPARS are available, the additional Attachment 0003 will be required.
28-Aug-26N/AIs there an incumbent for this job? If so, what is their name?CACI- Subcontractor Netmaker Communications
28-Aug-26N/AWhat is the value of the contract held by the incumbent?The incumbent task order has a dollar value of $2,544,295.00
28-Aug-26N/AWhat is the contract number of the incumbent?GSA# 47QTCK18D0009/47QFCA19F0006
28-Aug-26N/AWhen do you anticipate awarding this contract?The Government anticipates to award in November 2026.
26-Aug-26GeneralWas there and Industry Day or Forecast Briefing held for this opportunity that has a list of attendees/potential bidders?No Industry Days or Forecast Briefings were held. Request for Information (RFIs) were posted on SAM.GOV #W15P7T-26-R-SETA and Digital Market (formerly CHESS) #560346
7-Sep-26PWS5.3.1PWS §5.3.1 requires the contractor to address GIS and Location Information Services (LIS) requirements and ensure accurate data integration for 911 call routing, and Appendix A labor category A.9 requires both NENA GIS standards and SDSFIE for provisioning boundaries, emergency service boundaries, address points, and centerline data. Will the Government furnish current installation SDSFIE GIS layers (site/structure address points, road centerlines, and related features) as GFI, and is the GIS Engineer expected to produce the SDSFIE-to-NENA NG9-1-1 GIS Data Model crosswalk and authoritative Emergency Service/Provisioning Boundaries, or only to review GIS/LIS artifacts delivered by the system integrator?The Government will furnish the current installation SDSFIE GIS layers (site/structure address points, road centerlines, and related features) as GFI.
7-Sep-26PWS5.4.1PWS §5.4.1 requires connectivity both to commercial ESInets/NGCS and to a projected Army/DoW ESInet. Where an Army installation currently sits inside a state or local NGCS service area, will PD BECS GIS treat the installation PSAP as the authoritative NENA Emergency Service Boundary (requiring coordination with the state 911 GIS repository so boundaries do not overlap), or will Army PSAPs remain nested under the surrounding jurisdiction’s commercial NGCS? This determines whether GIS/LIS effort is an enterprise Army boundary program or a per-installation interface to existing state GIS.PD BECS GIS team will treat the installation PSAP as the authoritative NENA Emergency Service Boundary.