Vertical_Alignment_Slide_Repair.pdf

PDF 368 KB Posted

Attached to
MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles
Solicitation number
69056720B000031
Issued by

About this file

This document contains a vertical alignment review report and details of a related federal contract opportunity for slide repair and road resurfacing work. The vertical alignment review report provides station elevations, element types including tangents, symmetrical parabolas and lengths, entrance and exit grades, and other design parameters for the alignment of a 4-mile section of Camas Road located in Glacier National Park, Montana.

The related federal contract opportunity is being solicited by the Department of Transportation Federal Highway Administration to complete asphalt concrete paving, sub-excavation, slide repair, turnout rehabilitation, installation of curb and gutter, sidewalks, underdrains, ditch reconditioning, and signing and striping along the 4 miles of Camas Road. Work will repair existing roadway slumps and resurface the remaining length of the road.

View the file

Other files

File Type Posted
Bid Summary .pdf PDF
QA_03-22-2021.pdf PDF
QA_03-23-2021.pdf PDF
QA_03-19-2021.pdf PDF
Amd A003.pdf PDF
QA_03-17-2021.pdf PDF
QA_03-18-2021.pdf PDF
Amd A002.pdf PDF
SF-1442.pdf PDF
Sheet F.6.pdf PDF
Sheet F.10.pdf PDF
Pages D-1 through D-17.pdf PDF
Sheet F.4.pdf PDF
Amd. A001.pdf PDF
Page F-40.pdf PDF
Sheet F.11.pdf PDF
Page F-42.pdf PDF
Page F-29.pdf PDF
Page G-10.pdf PDF
QA_03-16-2021.pdf PDF
QA_03-15-2021.pdf PDF
QA_03-12-2021_2.pdf PDF
QA_03-12-2021.pdf PDF
QA_03-10-2021.pdf PDF
GR 02-20 Camas Road Geotechnical Report.pdf PDF
Earthwork_Wolf_Overlook.pdf PDF
MT NPS GLAC 11(3)_Binder_SWPPP.pdf PDF
Vertical_Alignment_Wolf_Overlook.pdf PDF
glac01103_Plans.pdf PDF
Horizontal_Alignment_Wolf_Overlook.pdf PDF
Earthwork_Slide_Repair.pdf PDF
Horizontal_Alignment_Entrance_Station.pdf PDF
MT_NPS_GLAC_11(3)_Cross_Sections.pdf PDF
Horizontal_Alignment_Slide_Repair.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
IFB 69056720B000031.pdf PDF
Earthwork_Entrance_Station.pdf PDF
Vertical_Alignment_Entrance_Station.pdf PDF
Camas Road_controlsheet.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vertical Alignment Review Report for the

Slide Repair for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

MT NPS GLAC 11(3)

Camas Road Slumps and Resurface Remaining 4 Miles

Vertical Alignment Review Report

Report Created: Wednesday, December 9, 2020 Time: 9:59:50 AM

Project: Default

Description:

File Name: C:\MyFiles\FHWA\Design\Camas_Road\Physical_Data_Slide_Repair\Camas_Slide_Repair.dgn

Last Revised:

12/9/2020 09:42:08

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: BL Slide

Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: BL

Vertical Description:

Vertical Style: Alignment\Baseline

Station Elevation

Element: Linear

START 19299.500 3849.496

VPC 19354.613 3852.331

Tangent Grade: 0.051

Tangent Length: 55.113

Element: Symmetrical Parabola

VPC 19354.613 3852.331

VPI 19369.613 3853.103

VPT 19384.613 3853.941

Length: 30.000

Entrance Grade: 0.051

Exit Grade: 0.056 r = (g2 - g1) / L: 1.472

K = l / (g2 - g1): 67.923

Middle Ordinate: 0.017

Element: Linear

VPT 19384.613 3853.941

VPC 19412.194 3855.482

Tangent Grade: 0.056

Tangent Length: 27.580

Element: Symmetrical Parabola

VPC 19412.194 3855.482

VPI 19537.194 3862.465

VPT 19662.194 3868.095

Length: 250.000

Page 1 of 2Vertical Alignment Review Report

12/9/2020file:///C:/Users/nathan.fischer/AppData/Local/Temp/RPTgtc4eprb.html nathan.fischer Sticky Note Completed set by nathan.fischer

Entrance Grade: 0.056

Exit Grade: 0.045 r = (g2 - g1) / L: -0.433

K = l / (g2 - g1): 230.989

Middle Ordinate: -0.338

Element: Linear

VPT 19662.194 3868.095

END 19662.540 3868.110

Tangent Grade: 0.045

Tangent Length: 0.347

Page 2 of 2Vertical Alignment Review Report

12/9/2020file:///C:/Users/nathan.fischer/AppData/Local/Temp/RPTgtc4eprb.html

File details come from the government source that posted it. Updated .