QA_03-18-2021.pdf

PDF 101 KB Posted

Attached to
MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles
Solicitation number
69056720B000031
Issued by

About this file

This document contains 14 questions and answers related to a federal solicitation for road improvement work along Camas Road in Glacier National Park, Montana. The solicitation involves asphalt concrete paving, sub-excavation, slide repair, turnout rehabilitation, curb and gutter, sidewalks, underdrains, ditch reconditioning, and signing and striping work along 4 miles of roadway. Questions address clarification of bid submission dates, special rock embankment and filter rock specifications, accessibility ramp and kiosk foundation details, and bonding and insurance requirements. Amendments will address discrepancies and provide missing details noted in the questions. The work is to be completed by March 2022 and is solicited from small businesses under an unrestricted competition.

View the file

Other files

File Type Posted
Bid Summary .pdf PDF
QA_03-22-2021.pdf PDF
QA_03-23-2021.pdf PDF
QA_03-19-2021.pdf PDF
Amd A003.pdf PDF
QA_03-17-2021.pdf PDF
Amd A002.pdf PDF
SF-1442.pdf PDF
Sheet F.6.pdf PDF
Sheet F.10.pdf PDF
Pages D-1 through D-17.pdf PDF
Sheet F.4.pdf PDF
Amd. A001.pdf PDF
Page F-40.pdf PDF
Sheet F.11.pdf PDF
Page F-42.pdf PDF
Page F-29.pdf PDF
Page G-10.pdf PDF
QA_03-16-2021.pdf PDF
QA_03-15-2021.pdf PDF
QA_03-12-2021_2.pdf PDF
QA_03-12-2021.pdf PDF
QA_03-10-2021.pdf PDF
GR 02-20 Camas Road Geotechnical Report.pdf PDF
Earthwork_Wolf_Overlook.pdf PDF
MT NPS GLAC 11(3)_Binder_SWPPP.pdf PDF
Vertical_Alignment_Wolf_Overlook.pdf PDF
glac01103_Plans.pdf PDF
Horizontal_Alignment_Wolf_Overlook.pdf PDF
Earthwork_Slide_Repair.pdf PDF
Horizontal_Alignment_Entrance_Station.pdf PDF
MT_NPS_GLAC_11(3)_Cross_Sections.pdf PDF
Horizontal_Alignment_Slide_Repair.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
IFB 69056720B000031.pdf PDF
Earthwork_Entrance_Station.pdf PDF
Vertical_Alignment_Entrance_Station.pdf PDF
Camas Road_controlsheet.xlsx XLSX spreadsheet
Vertical_Alignment_Slide_Repair.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT NPS GLAC 11(3)

Camas Road Slumps and Resurface Remaining 4 Miles

# General Technical Question Answer Date

1 X

The posting on beta.sam.gov for the above referenced project lists the date as March 24, 2021 at 2:00PM PDT; however, the Solicitation (form 1442) section 13 lists the date as March 23, 2021 at 2:00PM. Please clarify which date is correct.

Submit bids according to the solicitation documents.

3/10/2021

2 X Is there a special spec section for gradation or other factors in regard to the special rock embankment in the slump area?

See gradation requirements under FP‐14 Subsection 705.04.

3/12/2021

3 X

Hello, we cant seem to find the engineers estimate so we can do bonding for this job. Can you tell me the amount or the page number on the IFB for the amount?

The Engineer’s Estimate is not disclosed prior to bidding. See Page A‐6 where the estimated price range for this project is shown, and see FAR Clause 52.228‐1 Bid guarantee for bid bond requirements.

3/12/2021

4 X Do bid bonds have to be sent in person or can we do it electronically?

Bid bonds cannot be sent electronically.

See first page of the solicitation and the bid submittal checklist.

3/12/2021

5 X

Can you confirm the table 705‐4 in the special contract requirements on page G‐2 is the material to be used for the bid item for special rock embankment?

The requirements on Page G‐2 are for Filter Rock. See FP‐14 Subsection 705.04 for Special Rock Embankment requirements.

3/15/2021

6 X What grading classification is to be used for materials for roadway aggregate method 2

See FP‐14 Subsection 703.06. 3/15/2021

Check General or Technical

7 X

RE: Plan Sheet F.10. Accessibility Ramp Details shows a 15‐inch curb along the front face of the sidewalk while Section A‐A shows a 9‐inch curb.

No bid item for a 9‐inch curb. Please clarify.

This will be addressed under Amendment A001.

3/16/2021

8 X

RE: Plan Sheet F.11. Kiosk Accessibility Ramp Details shows a 15‐inch curb along the front face of the ramp and assumed around the entire Kiosk Island. Kiosk Foundation Details shows a standard curb and gutter detail for which there is no bid item. Please clarify. There are no details for the Kiosk Foundation as to slab thickness or dimensions.

This will be addressed under Amendment A001.

3/16/2021

9 X RE: Bid Item 61904‐0000 Bollard Posts. There are no details for this item.

This will be addressed under Amendment A001.

3/16/2021

10 X Can you clarify where the Filter rock on page G‐ 2 is to be used?

See SCR Subsection 157.02 and Plan Sheet J.5.

3/17/2021

11 X

Sheet D.14 show a type 2 subexcavation at station 156+05 ‐ 157+65. Sheet D.15 shows a type 1 subexcavation at the same stationing.

Could you please clarify which subexcavation type it is?

This will be addressed under Amendment A002.

3/17/2021

12 X

I received the quote from the utility company which states they need the trench on the telephone line to be a minimum of 6' below asphalt grade and the plan sheet F.12 it says 3'.

Can you please clarify which it will be?

This will be addressed under Amendment A002.

3/17/2021

13 X

I just wanted to verify that on FORM 1442 Box 12 that NO performance bond or payment bonds are required and that in box 13.b that NO offer guarantee in the form of a bid bond is required?

This will be addressed under Amendment A003.

3/18/2021

File details come from the government source that posted it. Updated .