MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles
Solicitation number
69056720B000031
Issued by

About this file

This document contains contract requirements for a federal transportation project. The work includes asphalt concrete paving, sub-excavation, slide repair, turnout rehabilitation, curb and gutter, sidewalks, underdrains, ditch reconditioning, and signing and striping along 4 miles of Camas Road in Glacier National Park, Montana. The requirements specify replacing communications in conduit with new phone pedestals below construction limits to maintain service, and installing a new 6-pair phone line from a communication pedestal box to a Kiosk Island. Notifications must be provided to the contracting officer and utility contacts prior to beginning utility system installation. Plans for permanent telephone systems must be submitted to the contracting officer. New conduits and utility boxes must be installed to connect to existing telephone systems at each end of the permanent relocation to ensure systems are maintained with approved temporary outages. Holes are required at new phone pedestal locations for the telephone provider to access lines and make cuts and splices.

View the file

Other files

File Type Posted
Bid Summary .pdf PDF
QA_03-22-2021.pdf PDF
QA_03-23-2021.pdf PDF
QA_03-19-2021.pdf PDF
Amd A003.pdf PDF
QA_03-17-2021.pdf PDF
QA_03-18-2021.pdf PDF
Amd A002.pdf PDF
SF-1442.pdf PDF
Sheet F.6.pdf PDF
Sheet F.10.pdf PDF
Pages D-1 through D-17.pdf PDF
Sheet F.4.pdf PDF
Amd. A001.pdf PDF
Sheet F.11.pdf PDF
Page F-42.pdf PDF
Page F-29.pdf PDF
Page G-10.pdf PDF
QA_03-16-2021.pdf PDF
QA_03-15-2021.pdf PDF
QA_03-12-2021_2.pdf PDF
QA_03-12-2021.pdf PDF
QA_03-10-2021.pdf PDF
GR 02-20 Camas Road Geotechnical Report.pdf PDF
Earthwork_Wolf_Overlook.pdf PDF
MT NPS GLAC 11(3)_Binder_SWPPP.pdf PDF
Vertical_Alignment_Wolf_Overlook.pdf PDF
glac01103_Plans.pdf PDF
Horizontal_Alignment_Wolf_Overlook.pdf PDF
Earthwork_Slide_Repair.pdf PDF
Horizontal_Alignment_Entrance_Station.pdf PDF
MT_NPS_GLAC_11(3)_Cross_Sections.pdf PDF
Horizontal_Alignment_Slide_Repair.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
IFB 69056720B000031.pdf PDF
Earthwork_Entrance_Station.pdf PDF
Vertical_Alignment_Entrance_Station.pdf PDF
Camas Road_controlsheet.xlsx XLSX spreadsheet
Vertical_Alignment_Slide_Repair.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F-40 DIVISION 600

Special Contract Requirements Project: MT NPS GLAC 11(3), Camas Road Slumps and Resurface Remaining 4 Miles

Section 636. — TRAFFIC SIGNAL, TRAFFIC COUNTER, LIGHTING, AND ELECTRICAL SYSTEMS

08/01/14–FP14

Description

636.01 Add the following:

This work also consists of replacing permanent communications in conduit with new phone pedestals below the construction limits to maintain service during construction.

This work also consists of installing a 6-pair phone line from a communication pedestal box to the Kiosk Island.

Material

636.02 Add the following to the material list:

Detectable Warning Tape 725.19 725.20 Granular Backfill 703.03

Description

636.11 System Installation, Telephone. (Added Subsection).

Telephone service is required during the reconstruction of the Entrance Station from station 123+00 to 129+40.

Notify the CO and utility contacts according to Subsection 107.02 prior to beginning utility system installation. Submit plans for the permanent telephone systems to the CO according to Subsection 104.03.

Install new conduits and utility boxes as shown on the plans and install new permanent telephone cables. Connect to the existing telephone systems at each end of the permanent relocation. Ensure all systems served by the existing telephone systems are maintained except as approved by the CO for temporary short term outages for cut over process.

Provide a 4-foot by 4-foot by 4-foot hole at each new phone pedestal location to provide access for the Century Link work crew to access the existing line and make the necessary cuts and splices.

Verify locations of hole with CO.

Install new conduits running from the mainline telephone line to the Kiosk as shown on the plans.

Connect a 6-pair communication line to the mainline telephone and run over to the Kiosk for future connection.

Revised by Amendment A001