Earthwork_Entrance_Station.pdf
PDF 474 KB Posted
- Solicitation number
- 69056720B000031
About this file
This report summarizes earthwork quantities for a federal highway project in Montana. It details slope lengths, areas, and volumes to be excavated or filled for the construction of a new entrance station along Camas Road in Glacier National Park. Materials required include over 38,000 cubic yards of asphalt for paving, over 20,000 cubic yards of aggregate for base courses, over 4,000 linear feet of concrete curb and gutter, and over 8,000 square feet of concrete sidewalk. The related federal contract opportunity is a solicitation from the Federal Highway Administration to resurface four miles of Camas Road and perform slide repairs, turnout rehabilitation, drainage improvements, and signage and striping work.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork Quantities Report for the
Camas Entrance Station for
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PROJECT
MT NPS GLAC 11(3)
Camas Road Slumps and Resurface Remaining 4 Miles
LNFT SQFT CUFT
Station Length Slope Area Volume
Totals 5117.89
1606.242
693.092
3449.59
7451.763
8311.89
1687.971
419.709
496.464
475.353
1975.63
221.006
151.616
538.353
31956.615 7987.059 asphalt
31956.615 15974.505 aggregate
2183.99 33.461 CUYD agg topsoil
366.061 457.441 curb
4101.779 1366.726 concrete
4675.507 1618.925 bedding course
207.667 69.222 structure sidewalk for kiosk
8349.471
12686.897
38605.618 42352.531
20149.616 24134.568
Yellow updated by me due to turning off the aggregate shoulder in the corridor template to create the slope meshes.
XS_TC_Fill:
XS_TC_Cut:
Volumes_Cut:
Volumes_Fill:
Material
XS_TC_Pavement Layer 2:
XS_TC_Pavement Layer 3:
XS_TC_Pavement Layer 5:
XS_TC_Pavement Layer 4:
XS_TC_Curb Bottom:
XS_TC_Pavement Surface:
XS_TL_Cut:
AUX_09:
Ditch Centerline:
AUX_01:
XS_TL_Slopes:
XS_TC_Pavement Layer 1:
XS_TL_Edge of Pavt 1:
XS_TL_Edge of Pavt 2:
XS_TL_Edge of Pavt:
CFL Asphalt Paved Ditch, Asphalt Curb:
XS_TL_Fill:
Slope Stake Limits Slopes:
Edge of pavement:
Curb Type 1:
Curb Stone:
Sidewalk:
Baseline:
Entrance Station Quantities nathan.fischer Sticky Note Completed set by nathan.fischer
File details come from the government source that posted it. Updated .