Earthwork_Entrance_Station.pdf

PDF 474 KB Posted

Attached to
MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles
Solicitation number
69056720B000031
Issued by

About this file

This report summarizes earthwork quantities for a federal highway project in Montana. It details slope lengths, areas, and volumes to be excavated or filled for the construction of a new entrance station along Camas Road in Glacier National Park. Materials required include over 38,000 cubic yards of asphalt for paving, over 20,000 cubic yards of aggregate for base courses, over 4,000 linear feet of concrete curb and gutter, and over 8,000 square feet of concrete sidewalk. The related federal contract opportunity is a solicitation from the Federal Highway Administration to resurface four miles of Camas Road and perform slide repairs, turnout rehabilitation, drainage improvements, and signage and striping work.

View the file

Other files

File Type Posted
Bid Summary .pdf PDF
QA_03-22-2021.pdf PDF
QA_03-23-2021.pdf PDF
QA_03-19-2021.pdf PDF
Amd A003.pdf PDF
QA_03-17-2021.pdf PDF
QA_03-18-2021.pdf PDF
Amd A002.pdf PDF
SF-1442.pdf PDF
Sheet F.6.pdf PDF
Sheet F.10.pdf PDF
Pages D-1 through D-17.pdf PDF
Sheet F.4.pdf PDF
Amd. A001.pdf PDF
Page F-40.pdf PDF
Sheet F.11.pdf PDF
Page F-42.pdf PDF
Page F-29.pdf PDF
Page G-10.pdf PDF
QA_03-16-2021.pdf PDF
QA_03-15-2021.pdf PDF
QA_03-12-2021_2.pdf PDF
QA_03-12-2021.pdf PDF
QA_03-10-2021.pdf PDF
GR 02-20 Camas Road Geotechnical Report.pdf PDF
Earthwork_Wolf_Overlook.pdf PDF
MT NPS GLAC 11(3)_Binder_SWPPP.pdf PDF
Vertical_Alignment_Wolf_Overlook.pdf PDF
glac01103_Plans.pdf PDF
Horizontal_Alignment_Wolf_Overlook.pdf PDF
Earthwork_Slide_Repair.pdf PDF
Horizontal_Alignment_Entrance_Station.pdf PDF
MT_NPS_GLAC_11(3)_Cross_Sections.pdf PDF
Horizontal_Alignment_Slide_Repair.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
IFB 69056720B000031.pdf PDF
Vertical_Alignment_Entrance_Station.pdf PDF
Camas Road_controlsheet.xlsx XLSX spreadsheet
Vertical_Alignment_Slide_Repair.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Earthwork Quantities Report for the

Camas Entrance Station for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

MT NPS GLAC 11(3)

Camas Road Slumps and Resurface Remaining 4 Miles

LNFT SQFT CUFT

Station Length Slope Area Volume

Totals 5117.89

1606.242

693.092

3449.59

7451.763

8311.89

1687.971

419.709

496.464

475.353

1975.63

221.006

151.616

538.353

31956.615 7987.059 asphalt

31956.615 15974.505 aggregate

2183.99 33.461 CUYD agg topsoil

366.061 457.441 curb

4101.779 1366.726 concrete

4675.507 1618.925 bedding course

207.667 69.222 structure sidewalk for kiosk

8349.471

12686.897

38605.618 42352.531

20149.616 24134.568

Yellow updated by me due to turning off the aggregate shoulder in the corridor template to create the slope meshes.

XS_TC_Fill:

XS_TC_Cut:

Volumes_Cut:

Volumes_Fill:

Material

XS_TC_Pavement Layer 2:

XS_TC_Pavement Layer 3:

XS_TC_Pavement Layer 5:

XS_TC_Pavement Layer 4:

XS_TC_Curb Bottom:

XS_TC_Pavement Surface:

XS_TL_Cut:

AUX_09:

Ditch Centerline:

AUX_01:

XS_TL_Slopes:

XS_TC_Pavement Layer 1:

XS_TL_Edge of Pavt 1:

XS_TL_Edge of Pavt 2:

XS_TL_Edge of Pavt:

CFL Asphalt Paved Ditch, Asphalt Curb:

XS_TL_Fill:

Slope Stake Limits Slopes:

Edge of pavement:

Curb Type 1:

Curb Stone:

Sidewalk:

Baseline:

Entrance Station Quantities nathan.fischer Sticky Note Completed set by nathan.fischer

File details come from the government source that posted it. Updated .