Horizontal_Alignment_Slide_Repair.pdf

PDF 362 KB Posted

Attached to
MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles
Solicitation number
69056720B000031
Issued by

About this file

This document contains a horizontal alignment review report and information on a related federal contract opportunity. The horizontal alignment review report provides details on a baseline alignment called BL Slide Alignment for a project along Camas Road in Glacier National Park, Montana. The alignment spans from station 19299.500 to 19662.540 north and ranges from 1603545.633 to 1603900.438 east.

The related federal contract opportunity is solicitation number 69056720B000031 to perform work along 4 miles of Camas Road, including asphalt concrete paving, sub-excavation, slide repair, turnout rehabilitation, curb and gutter, sidewalks, underdrains, ditch reconditioning, and signing and striping. The solicitation is issued by the Department of Transportation Federal Highway Administration for the MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles project.

View the file

Other files

File Type Posted
Bid Summary .pdf PDF
QA_03-22-2021.pdf PDF
QA_03-23-2021.pdf PDF
QA_03-19-2021.pdf PDF
Amd A003.pdf PDF
QA_03-17-2021.pdf PDF
QA_03-18-2021.pdf PDF
Amd A002.pdf PDF
SF-1442.pdf PDF
Sheet F.6.pdf PDF
Sheet F.10.pdf PDF
Pages D-1 through D-17.pdf PDF
Sheet F.4.pdf PDF
Amd. A001.pdf PDF
Page F-40.pdf PDF
Sheet F.11.pdf PDF
Page F-42.pdf PDF
Page F-29.pdf PDF
Page G-10.pdf PDF
QA_03-16-2021.pdf PDF
QA_03-15-2021.pdf PDF
QA_03-12-2021_2.pdf PDF
QA_03-12-2021.pdf PDF
QA_03-10-2021.pdf PDF
GR 02-20 Camas Road Geotechnical Report.pdf PDF
Earthwork_Wolf_Overlook.pdf PDF
MT NPS GLAC 11(3)_Binder_SWPPP.pdf PDF
Vertical_Alignment_Wolf_Overlook.pdf PDF
glac01103_Plans.pdf PDF
Horizontal_Alignment_Wolf_Overlook.pdf PDF
Earthwork_Slide_Repair.pdf PDF
Horizontal_Alignment_Entrance_Station.pdf PDF
MT_NPS_GLAC_11(3)_Cross_Sections.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
IFB 69056720B000031.pdf PDF
Earthwork_Entrance_Station.pdf PDF
Vertical_Alignment_Entrance_Station.pdf PDF
Camas Road_controlsheet.xlsx XLSX spreadsheet
Vertical_Alignment_Slide_Repair.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment Review Report for the

Slide Repair for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

MT NPS GLAC 11(3)

Camas Road Slumps and Resurface Remaining 4 Miles

Horizontal Alignment Review Report

Report Created: Wednesday, December 9, 2020 Time: 9:44:54 AM

Project: Default

Description:

File Name: C:\MyFiles\FHWA\Design\Camas_Road\Physical_Data_Slide_Repair\Camas_Slide_Repair.dgn

Last Revised:

12/9/2020 09:42:08

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: BL Slide

Alignment Description:

Alignment Style: Alignment\Baseline

Station Northing Easting

Element: Linear

START ( ) 19299.500 1603545.633 876840.486

END ( ) 19662.540 1603900.438 876763.595

Tangential Direction: N12.228°W

Tangential Length: 363.040

Page 1 of 1Horizontal Alignment Review Report

12/9/2020file:///C:/Users/nathan.fischer/AppData/Local/Temp/RPTn515s1t3.html

File details come from the government source that posted it. Updated .