This document outlines a federal contract opportunity for roadwork along Camas Road in Glacier National Park, Montana. The solicitation seeks a contractor to complete asphalt paving, sub-excavation, slide repair, turnout rehabilitation, curb and gutter installation, sidewalk construction, underdrain installation, ditch reconditioning, and signage and striping work along 4 miles of the road. The federal agency issuing the solicitation is the Department of Transportation Federal Highway Administration under solicitation number 69056720B000031. The work includes addressing road slumps and resurfacing the remaining sections of Camas Road.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRENT L COE Digitally signed by BRENT L COE Date: 2020.12.16 16:02:26 -08'00' 12/16/2020
12/07/2020JEFFREY MOW Digitally signed by JEFFREY MOW Date: 2020.12.07 19:10:34 -07'00'
:3
P
M
D e c e m b e r
IN
D E
X T
O P
L A
N S
H E
E T
S
C
M y
F il e s \F
H W
A \D e s ig n \L
E M
H I_
\Q A
R e v ie w
\g la c g e n
-2 .d g n
INDEX TO PLAN SHEETS
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) A.2
NPS Drwg No. 117/137434 NPS PMIS No. 188751 nathan.fischer Sticky Note Completed set by nathan.fischer
AND ABBREVIATIONS
PLAN SYMBOLS
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
U.S. CUSTOMARY DETAIL
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
DI
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Treeline; Individual Trees
Silt Fence
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
- no symbol -
EXISTING PROPOSED
wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Miscellaneous Utility Features
Building
Fiber Roll or Wattle
BH
TP
National Boundary
W west
RIP
G G
W
WNOTE:
NO SCALE
1.
Above Ground Tank; Underground Tank
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Control Point (Terrestrial and GPS); Jump Hub
Riprap
CP GPS
JH
T
DIdrwg(s).
dist.
diaph.
diag.
dia.
DHV
D jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o.c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Intermittent Drainage or Small Creek θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center
STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Transition
Toe of Fill
Top of Cut
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
M.P.
M.L.
mile post main line yd3 yd2 cubic yard(s) square yard on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend
:0
A u g u s t
D e ta il c p w
-w o rk
\d \W
-1
-O ld
.d g n
DETAIL
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) A.3
NPS Drwg No. 117/137434 NPS PMIS No. 188751
SCALE IN MILES
01 1 2 3 4
C re e k
Fish
C re ek
Cr ee k
C r e e k
How e
F e rn
McGee
Apgar Creek
Camas Creek
Ca mas
C re e k
Falls
Walton
C re ek
L in co ln
C re e k
Falls
Falls
Falls
L A K
D O N A L D
Flathead
Ri ve r
Camas Road Overlay 28+95 Camas Road Overlay 52+54
Camas Road Overlay 54+14
Wolf Overlook Parking Area
Camas Road at
193+77 to 195+60
123+00 to 129+40
Camas Road Overlay 277+00
Overlook Parking Area
Camas Road at Wolf
Sprague
Creek
Sn yd er
Cr ee k
Jackson
C re ek
H A R R
IS
O
LA
E
M C D
O N
A L
D
McGee Creek G L A
C
IE
R R
O U
T E
E
IG
H T
G L A C
IE
R
R O
U T E
M c G e e
M e a d o w
Apgar
Sp er ry
Gla cie r
N
TWIN LAKES
C re e k
M c
D o n a ld
Campground
Sprague Creek
Park Services Fish Creek
Meadows Christensen
Meadow Rogers
Basin Avalanche
G
NI
O
G
O T
E H
T
N U
S
D A
O R
REMAINING 4 MILES
AND RESURFACE
CAMAS ROAD SLUMPS
MT NPS GLAC 11(3)
REMAINING 4 MILES
AND RESURFACE
CAMAS ROAD SLUMPS
MT NPS GLAC 11(3)
LAKE
HIDDENLAKE
TROUT
Parking Area
Wolf Overlook
SUSPEND WORK
RESUME WORK
N A T I O N A L P A R K
G L A C I E R
BEGIN PROJECT
RESUME WORK
END PROJECT
SLIDE REPAIR
CAMAS ROAD
SUSPEND WORK
ENTRANCE STATION
CAMAS
Country Pond Moose
Lake Johns
WILSON
ELLEN
LAKE
LAKE
LINCOLN
LAKE
MARY BAKER
LAKE
AVALANCHE
LAKE
ROGERS
LAKE
HOWE
LAKE
FISH
P A R K
N A T I O N A L
G L A C I E R
P A R K
N A T I O N A L
G L A C I E R bridge
Foot
LAKE
SNYDER
UPPER
LAKE
SNYDER
Campground
Avalanche
LAKE
GUNSIGHT
113°59'20.12"W
48°31'18.64"N
114° 4'27.33"W
48°37'20.44"N
:4
O c to b e r
V ic in it y M a p p w
-w o rk
\d \M
T N
P S
G
L A
C (3
A
.d g n
VICINITY MAP
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) A.4
NPS Drwg No. 117/137434 NPS PMIS No. 188751 nathan.fischer
Cancelled set by nathan.fischer
Sheet and Description
SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J SECTION K SECTION L -
PLAN
SHEETS
APPROACHES
AND
TURNOUTS
CAMAS
ENTRANCE
STATION
CAMAS
SLIDE
AREA
WOLF
OVERLOOK
PARKING
AREA
DRAINAGE
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 710 40 750
A0140 15706-0200 SOIL EROSION CONTROL, CHECK
DAM EACH 7 3 10
A0160 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0180 20103-0000 CLEARING AND GRUBBING SQYD 7,554 1,615 534 297 10,000 Contract Quantity
A0200 20301-2300 REMOVAL OF SIGN/MARKER EACH 25 25
A0220 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 5,565 1,782 518 435 8,300
A0240 20401-0000 ROADWAY EXCAVATION CUYD 776 890 76 158 1,900 Contract Quantity
A0260 20402-0000 SUBEXCAVATION CUYD 3,596 580 324 4,500
A0280 20411-0000 SELECT BORROW TON 6,471 1,044 485 8,000
A0300 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C SQYD 6,818 1,309 373 8,500
A0320 20720-0400 REINFORCEMENT GEOSYNTHETIC,
TYPE 4 SQYD 316 14 330
A0340 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 753 417 130 1,300 Contract Quantity
A0360 25201-0000 SPECIAL ROCK EMBANKMENT CUYD 1,279 121 1,400
A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,373 319 1,166 116 226 3,200
A0400 30302-1000 DITCH RECONDITIONING LNFT 202 18 220
A0420 31301-0000 AGGREGATE-TOPSOIL COURSE TON 1,557 88 66 38 101 1,850
A0460 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 9,160 619 521 10,300
A0480 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 93 7 5 105
A0520 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 1,085 32 574 57 102 1,850
A0540 40303-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1, WEDGE AND LEVELING
COURSE TON 3,073 177 3,250
A0560 41201-0000 TACK COAT (CSS-1) TON 56 4 5 65
A0580 41801-2000 ASPHALT CONCRETE PAVEMENT
PATCH, TYPE 2 SQYD 291 19 310
MileStone: 100% Date Completed: In Progress Report Date: 12/10/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-D ec -2
:0
A
M
Remarks and/or Determination of Estimated QuantityPay Item Description Unit
Estimated Quantities
C
M yF ile s\
FH
W
A \D es ig n \C a m a s_
R o a d \F ix K io sk R a m p su m m a ry
.x ls m ]S h ee t
STATE PROJECT
B.1NPS GLAC 11(3)MT
SHEET
NUMBER
NPS PMIS No. 188751 NPS Drwg No. 117/137434
PLAN
SHEETS
APPROACHES
AND
TURNOUTS
CAMAS
ENTRANCE
STATION
CAMAS
SLIDE
AREA
WOLF
OVERLOOK
PARKING
AREA
DRAINAGE
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
A0600 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 245 15 260
A0620 60510-0700 6-INCH COLLECTOR PIPE LNFT 2,256 114 2,370
A0640 60510-0800 6-INCH OUTLET PIPE LNFT 300 53 17 370
A0660 60901-1300 CURB, CONCRETE, 15-INCH DEPTH LNFT 512 38 550
A0680 61501-0100 SIDEWALK, CONCRETE (SURFACE
FINISH) SQYD 24 2 26
A0700 61501-0500 SIDEWALK, EXPOSED AGGREGATE
CONCRETE SQYD 365 35 400
A0720 61504-1000 ACCESSIBILITY RAMP, CONCRETE SQYD 92 8 100
A0740 61509-0000 DETECTABLE WARNING PANELS SQYD 7 7
A0760 61904-0000 BOLLARD POST EACH 4 4
A0780 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40 40
A0800 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 20 20
A0820 62201-3000 HYDRAULIC EXCAVATOR (MINI, 35
HP TO 45 HP) HOUR 20 20
A0840 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 20 20
A0860 62301-0000 GENERAL LABOR HOUR 20 20
A0880 62401-0300 FURNISHING AND PLACING
TOPSOIL, 4-INCH DEPTH SQYD 86 555 2,312 855 450 242 4,500
A0900 62502-0000 TURF ESTABLISHMENT SQYD 86 620 3,460 1,006 534 294 6,000
A0920 63301-1000 SIGN SYSTEM, GOVERNMENT
FURNISHED SIGN EACH 2 2
A0940 63302-0000 SIGN SYSTEM SQFT 229.75 229.75
A0960 63308-2000 OBJECT MARKER, TYPE 2 EACH 4 4
A0980 63308-3000 OBJECT MARKER, TYPE 3 EACH 8 8
A1000 63318-1000 SNOW POLE HOLDER EACH 23 23
A1020 63401-0100 PAVEMENT MARKINGS, TYPE A,
SOLID (WHITE) LNFT 83,424 6 83,430
A1040 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID (WHITE) LNFT 48,555 5 48,560
A1060 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID (YELLOW) LNFT 51,316 4 51,320
A1080 63403-0400 PAVEMENT MARKINGS, TYPE D
(CROSSWALK WHITE) SQFT 500 500
A1100 63405-1350 PAVEMENT MARKINGS, TYPE D,
STRAIGHT ARROW EACH 2 2
-D ec -2
:0
A
M
MileStone: 100% Date Completed: In Progress Report Date: 12/10/20
C
M yF ile s\
FH
W
A \D es ig n \C a m a s_
R o a d \F ix K io sk R a m p su m m a ry
.x ls m ]S h ee t (2
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.2NPS GLAC 11(3)MT
SHEET
NUMBER
PLAN
SHEETS
APPROACHES
AND
TURNOUTS
CAMAS
ENTRANCE
STATION
CAMAS
SLIDE
AREA
WOLF
OVERLOOK
PARKING
AREA
DRAINAGE
EROSION
CONTROL
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
A1120 63405-1500 PAVEMENT MARKINGS, TYPE D,
"STOP" WORD MESSAGE EACH 5 5
A1140 63405-1650 PAVEMENT MARKINGS, TYPE D,
ACCESSIBILITY SYMBOL EACH 2 2
A1160 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 9 1 10
A1180 63502-1050 TEMPORARY TRAFFIC CONTROL,
TUBULAR MARKER EACH 120 120
A1200 63502-1500 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE A EACH 16 16
A1220 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 30 30
A1240 63502-1700 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE C EACH 50 50
A1260 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS LNFT 99,871 9 99,880
A1280 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 498.5 498.5
A1300 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 2,580 2,580
A1320 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 1,290 1,290
A1340 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 133 133
A1360 63601-3100 SYSTEM INSTALLATION, TELEPHONE LPSM All ALL
A1380 63610-0500 CONDUIT, 1-INCH, RIGID
GALVANIZED STEEL LNFT 30 2 32
A1400 63610-1600 CONDUIT, 2-INCH, PVC LNFT 951 19 970
A1420 63621-5000 UTILITY BOX, CONCRETE EACH 1 1
A1440 63622-0000 UTILITY TRENCH LNFT 951 19 970
A1460 64601-1000 BUILDING, RESTROOM FACILITY EACH 1 1
A1480 64620-1100 REMOVE AND RESET KIOSK (AND
IRON RANGER) EACH 1 1
-D ec -2
:0
A
M
MileStone: 100% Date Completed: In Progress Report Date: 12/10/20
C
M yF ile s\
FH
W
A \D es ig n \C a m a s_
R o a d \F ix K io sk R a m p su m m a ry
.x ls m ]S h ee t (3
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
STATE PROJECT
B.3NPS GLAC 11(3)MT
SHEET
NUMBER
CL
11' travel way
Shldr
2'11' travel way
Shldr
2'
1:3 1:3
Profile grade
Existing ground
CAMAS ROAD OVERLAY
typ, both sides
Aggregate topsoil course, Top of existing pavement
Cross-slope
Tack coat
Cross-slope ground
Existing
CL
1:3 1:3
Profile grade
Existing ground
CAMAS ROAD OVERLAY
typ, both sides
Aggregate topsoil course, Top of existing pavement
Cross-slope
Tack coat
Cross-slope ground
Existing
-inch compacted depth2 type II pavement roughness, 2 nominal maximum size aggregate, 0.3 to <3 million ESAL, "4
" or 2
Asphalt concrete pavement, gyratory mix, type IV pavement roughness, 2-inch compacted depth nominal maximum size aggregate, 0.3 to <3 million ESAL, "4
" or 2
Asphalt concrete pavement, gyratory mix, and 195+60 to 277+00
129+40 to 193+77
54+14 to 123+00
28+95 to 52+54 and leveling course, 1-inch compacted depth
Asphalt concrete pavement, type 1, wedge
11' travel way
Shldr
2'11' travel way
Shldr
2'
NO SCALE
NTS NTS
PAVEMENT CONNECTION AT BRIDGES
Saw cut vertical
50' smooth connection
Asphalt pavement milling (transition)
PAVEMENT CONNECTION AT OVERLAY LIMITS
Saw cut vertical
Asphalt pavement milling (transition)
Top of existing pavement
50' smooth connection
Tack coat Tack coat pavement existing
Top ofsee this Sheet for details
Camas Road overlay, see this Sheet for details
Camas Road overlay, Top of subgrade
Top of subgrade
NOTE:
FOOTNOTE:
from horizontal.
Finish edges of pavement between a 25 and 45 degree angle
Furnish and place topsoil, and round slopes according to Sheet C.4 bridge ends as directed by the CO.
and milling limits as directed by the CO. Remove pavement near
To avoid damaging bridge ends and joints, adjust saw cut locations image for pavement connections back on line.
Pavement connection ahead on line shown. Construct mirror
4.
3.
2.
1.
Match existing cross-slope, unless otherwise directed by the CO.
B ri d g e E n d
O v e r la y L im it
:1
O c to b e r
T y p ic a l
S e c ti o n m a s R o a d
O v e r la y
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \Q
A R e v ie w \M
T N
P S
G
L A
C (3
C
.d g n
CAMAS ROAD OVERLAY
TYPICAL SECTION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) C.1
-2.44%
Median Shoulder Varies (0'-6" to 0')Median Shoulder Varies (0'-6" to 0')
(0' to 8'-6")
Varies
(0' to 8'-6")
Varies
CL
1:3 1:3
Va rie s Varies
Varies
-2% -2%
Shldr
2'-0"
Shldr
2'-0"
Roadway aggregate, method 2, 6-inch compacted depth
Profile grade
Asphalt Median Varies
(0' to 17'-0")(11'-0" to 20'-0")
FOOTNOTE:
NOTE:
Slope stake limit
Slope stake limit
Asphalt concrete pavement, type 1, 3-inch compacted depth
Entrance Lanes
-2% -2%
11'-0"
Exit Lane surfaces
Median
Varies (0' to 16'-0")
(0' to 8'-6")
Varies
(0' to 8'-6")
Varies coat
Tack
(6-inch width)
15-inch depth
Curb, concrete, Top of subgrade Top of subgrade grade
Profile
See Sheet C.3
123+90 LT to 125+87 LT
STATION PARKING LT
CAMAS ENTRANCE
STATION PARKING RT
CAMAS ENTRANCE
See Sheet C.3
124+37 RT to 126+11 RT typ, both sides
Aggregate topsoil course, Va rie s
CL
-2%
NO SCALE
4-inch depth placing topsoil, Furnishing and
4-inch depth
Furnishing and placing topsoil, -0.5%
123+00 and 129+40
PAVEMENT CONNECTION AT OVERLAY LIMITS
Saw cut vertical
Asphalt pavement milling (transition)
20' smooth connection
Tack coat pavement overlay proposed
Top ofsee this Sheet for details
Entrance station, Top of subgrade
5'-0" 5'-0"
Turf establishment Turf establishment
125+91 to 126+67
CAMAS ROAD ENTRANCE STATION
4.
3.
2.
1.
from horizontal.
Finish edges of pavement between a 25 and 45 degree angle
See Sheet F.1 for entrance station quantities.
Sheet C.4.
Furnish and place topsoil, and round slopes according to new pavement. See Sheet F.9 for details.
Complete subexcavation and backfill work before constructing and 126+67 to 129+40
123+00 to 125+91;
ENTRANCE STATION
CAMAS ROAD
(see Sheets F.3-5 for details) or Sidewalk, Concrete
Kiosk Island of the roadway surfaces.
Profile grade is the centerline elevation for the projected grades
L im it
E n tr a n c e S ta ti o n
:1
O c to b e r
T y p ic a l
S e c ti m a s R o a d
E n tr a n c e S ta ti
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \Q
A R e v ie w \M
T N
P S
G
L A
C (3
C
.d g n
CAMAS ROAD ENTRANCE STATION
TYPICAL SECTION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) C.2
CAMAS ENTRANCE STATION PARKING LT
123+90 LT to 125+87 LT
:3 type 1, 3-inch compacted depth
Asphalt concrete pavement, Varies 22'-0" to 27'-0"
Southbound travel way
Varies 0' to 16'-0" 2'-0"
Shldr
7'-0"
Sidewalk, concrete
6-inch compacted depth
Roadway aggregate, method 2, Portland cement concrete, 4-inch depth
Bedding material, 4-inch depth ground
Existing
Parking area limits coat
Tack
3'-0"
CAMAS ENTRANCE STATION PARKING RT
124+37 RT to 126+11 RT
Northbound travel way
Varies 16'-0" to 25'-0" type 1, 3-inch compacted depth
Asphalt concrete pavement, Sidewalk, concrete
7'-0"
6-inch compacted depth
Roadway aggregate, method 2, 4-inch depth concrete, cement
Portland
4-inch depth material, Bedding
Tack coat
1:3
Varies 0'-0" to 53'-0"
Parking area limits
3'-0"
NOTE:
Furnish and place topsoil, and round slopes according to Sheet C.4.
directed by the CO
See layout details on Sheets F.3-7. Adjust layouts in the field as
2.
1.
4-inch depth placing topsoil, Furnishing and
4-inch depth placing topsoil, Furnishing and
2'-0"
Shldr
NO SCALE
-0.5%
-0.5% drainpan See Detail A for
Curb, concrete, 15-inch depth
0.5%
0.5%
15-inch depth Curb, concrete,drainpan
See Detail A for
6-inch compacted depth Roadway aggregate, method 2, type 1, 3-inch compacted depth Asphalt concrete pavement, ground Existing
5%
Turf establishment
Varies
Turf establishment
Varies
See Sheet C.2 for details
See Sheet C.2 for details
Detail A
3'-0"
1'-6"
3' Varies
Pan Drainage
Pan Drainage
:5
O c to b e r
T y p ic a l S e c ti m a s E n tr a n c e
S ta ti o n P a rk in g
M y F ile s \F
H W
A \D e s ig n \C a m a s R o a d \Q
A R e v ie w \M
T N
P S
G
L A
C (3
C
.d g n
PARKING
CAMAS ENTRANCE STATION
TYPICAL SECTION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) C.3
NO SCALE
le a r in g l im it s
1:51:5
CL
Profile grade rounding
Fill slope
2'-0" Shldr
C le a r in g l im it
5'-0' 5'-0"
D le a r in g l im it
0.25 D
10'-0"
10'-0"
8'-0"
CUT SLOPE ROUNDING DETAIL
2'-0" Shldr
Varies
Varies
FOOTNOTE:
NOTE:
m in .4
Existing ground
-2%-2%
Westbound lane
11'-0"
Eastbound lane
11'-0"
3' min.
Separation-stabilization geotextile, class 1, type C
Existing ditch
Daylight to exist ditch
Existing ground
Slope stake limit
Existing ground typ, both sides
Aggregate topsoil course, see Sheet C.1 for details
Top of existing pavement, begin overlay, type II pavement roughness, 2 1/2-inch compacted depth nominal maximum size aggregate, 0.3 to <3 million ESAL, Asphalt concrete pavement, gyratory mix, 1/2" or 3/4"
4-inch compacted depth
Roadway aggregate, method 2, type 1, 2-inch compacted depth
Asphalt concrete pavement, embankment
Special rock
C le a r in g l im it s
:1
5'-0"
FILL SLOPE ROUNDING DETAIL
0.25 D
li m it
S lo p e s ta k e
Varies
3.
2.
1.
Varies
193+77 to 195+60
CAMAS ROAD SLIDE REPAIR
from horizontal.
Finish edges of pavement between a 25 and 45 degree angle
Construct variations according to the staking report data listing.
Furnish and place topsoil according to Section 624.
2 1/2-inch compacted depth quantities.
0.3 to <3 million ESAL, type II pavement roughness, 1/2" or 3/4" nominal maximum size aggregate, See Sheet D.1 for asphalt concrete pavement, gyratory mix, 5 feet.
Prorate clearing and rounding distances on cut heights less than points are less than 10-feet apart in horizontal distance.
Apply one rounding for multiple slope breaks where slope breaks
Turf Establishment ilo
Furnishing and placing tops
:4
O c to b e r
T y p ic a l
S e c ti m a s R o a d S li d e R e p ir
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \Q
A R e v ie w \M
T N
P S
G
L A
C (3
C
.d g n
CAMAS ROAD SLIDE REPAIR
TYPICAL SECTION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) C.4
le a r in g l im it s
CL
Profile grade
NOTE:
Existing ground
VariesVaries
Existing ground
Existing pavement
Varies
Varies
Sawcut
Varies Varies
1:2 1:
Varies
Varies
3.
2.
1.
10+00 to 11+39
WOLF OVERLOOK
See Sheets H.2-3 for overlook details.
See Sheet H.1 for overlook quantities.
Furnish and place topsoil according to Section 624.
reconditioning
Shoulder furnishing and placing topsoil, 4 inch depth
Roadway obliteration and li m it s
C le a r in g
:5
S e p te m b e r
T y p ic a l
S e c ti
W lf
O v e r lo k
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
C
.d g n
WOLF OVERLOOK
TYPICAL SECTION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) C.5
:1
S e p te m b e r
C a m a s R o a d O v e r la y Q u a n ti ti e s
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \F ix K io s k R a m p \M
T N
P S
G
L A
C (3
D
.d g n
QUANTITIES
CAMAS ROAD OVERLAY
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.1
All subexcavated material is deemed unsuitable.
before subexcavating.
Where applicable, remove the existing asphalt concrete pavement shown on this Sheet.
according to the Typical Subexcavation and Deep Patch Profile
Construct ramps in and out of subexcavations and deep patches low points, and minimize disturbances.
adjusted by the CO in the to field to coincide with subexcavation
Outlet locations shown in the table are approximate, and may be bottom of deep patches, and type 1 and 2 subexcavations.
Provide a continuous, uniformly-sloped surface across the
1:5 1:5 pavement Saw cut
Subexcavation
Existing ground pavement Saw cut geotextile, class 1, type C Separation-stabilization limits or deep patch or deep patch subexcavation Bottom of
TYPICAL SUBEXCAVATION AND DEEP PATCH PROFILE
NOTE:
5.
4.
3.
2.
1.
FOOTNOTE:
NO SCALE
type 1, 2-inch compacted depth
Asphalt concrete pavement, 4-inch compacted depth
Roadway aggregate, method 2, type 4 (geogrid) geosynthetic, Reinforcement
13'-0"
188+40 to 189+55 subexcavation
Bottom of
CL
Existing shoulder
Profile grade
DEEP PATCH SECTION C
le a r in g l im it
5'-0" fill slope
Round
Separation-stabilization geotextile, class 1, type C
Shoulder subgrade m in
Varies
Select borrow ground Existing
Varies
1:3
Top of existing pavement
Existing ground the existing embankment.
Varies according to where the bottom of subexcavation intersects to drain toward embankment.
is sloped to drain RT. Otherwise provide minimum slope of 0.5%
Match cross-slope of existing pavement where existing pavement aggregate, method 2.
type 1, placed in 1 lift and 4-inch compacted depth roadway method 2. 1B is 2-inch compacted depth asphalt concrete pavement, placed in 2 lifts and 6-inch compacted depth roadway aggregate, 1A is 4-inch compacted depth asphalt concrete pavement, type 1, 4-inch depth soil, op
Furnishing and placing t
:5 e c e m b e r
S
U B
E X
C A
V A
T
IO
N A
E
P P
A T
C H
Q U
A N
T
IT
D D
E T
A
IL
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \F ix K io s k R a m p \M
T N
P S
G
L A
C (3
D
.d g n
AND DETAILS
DEEP PATCH QUANTITES
SUBEXCAVATION AND
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.2
NPS Drwg No. 117/137434 NPS PMIS No. 188751 nathan.fischer Sticky Note Cancelled set by nathan.fischer nathan.fischer Sticky Note Cancelled set by nathan.fischer nathan.fischer
V r ie s pavement
Existing
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
Top of existing pavement
Pay Limits, see Plan Section D
Existing base course Asphalt concrete, Type II, 2-inch compacted depth
Tack coat, CSS-1 around patch perimeter
170+00 to 170+50
154+00 to 154+50; and
115+00 to 115+50;
NO SCALE
NOTE:
See Sheet C.1 for Camas Road Overlay work.1.
to a depth of 2-inches base and subgrade material
Remove damaged pavement, :3 e c e m b e r
A
S P
H A
L T
C O
N C
R E
T E
P A
V E
M E
N T
P A
T C
H S
E C
T
IO
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \F ix K io s k R a m p \M
T N
P S
G
L A
C (3
D
.d g n
PATCH SECTIONS
ASPHALT CONCRETE PAVEMENT
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.3
NPS Drwg No. 117/137434 NPS PMIS No. 188751 nathan.fischer
COLLECTOR AND OUTLET PIPE PLAN
(see Notes 1 and 2)
Outlet pipe
C o ll e c to r p ip e
PLAN VIEW
SUBEXCAVATION AREA
S u b e x c a v a ti o n l im it
S u b e x c a v a ti o n l im it or
D it c h li n e
P r o f il e g r a d e
0.5% min. slope draining toward ditch is required)
(Mirror image for ditch RT, and where
FOOTNOTE:
See Sheet D.5 for additional outlet pipe details.
Subexcavation and/or outlet LT. See Sheet D.2 for details.
Subexcavation and outlet RT shown. Construct mirror image for
2.
1.
roadway aggregate, method 2 compacted depths.
See Sheet D.2 for asphalt concrete pavement, type 1 and
Minimum 12" depth from 174+70 to 175+70. See Sheet D.2.
NOTE:
NO SCALE
TYPE 1 SUBEXCAVATION AND BACKFILL SECTIONS
Perforated collector pipe (6" dia.)
Separation-stabilization geotextile, class 1, type C
Perforated collector pipe (6" dia)
Outlet pipe end
Bottom of subexcavation
Subexcavation backfill Select borrow m in
24" min.
24" min.
Asphalt concrete pavement, type 1 2 2
Roadway aggregate, method 2
Bottom of subexcavation
CL
0.5% min.
Existing ground
Bottom of subexcavation
CL
CL
0.5% min.
HALF-WIDTH SUBEXCAVATION BACKFILL FULL WIDTH SUBEXCAVATION BACKFILL
CL
Existing shoulder
Existing ground
FULL-WIDTH SUBEXCAVATIONHALF-WIDTH SUBEXCAVATION
Profile grade
13'-0"
Profile grade
Existing ground
Bottom of subexcavation m in m in
Existing ground
Existing shoulder Profile grade
13'-0"13'-0"
Profile grade Existing shoulder
Outlet pipe end
Existing shoulder
Separation-stabilization geotextile, class 1, type C pavement, asphalt
Removal of
Roadway excavation pavement, asphalt
Removal of excavation
Roadway
Subexcavation Subexcavation
:5
S e p te m b e r
T y p e
S u b e x c a v a ti
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
D
.d g n
TYPE 1 SUBEXCAVATION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.4
TYPE 2 SUBEXCAVATION BACKFILL
CL
Existing shoulder geotextile, class 1, type C
Separation-stabilization
Outlet pipe end, see detail on this sheet
COLLECTOR AND OUTLET PIPE PLAN
C o ll e c to r p ip e
PLAN VIEW
SUBEXCAVATION AREA
S u b e x c a v a ti o n l im it
S u b e x c a v a ti o n l im it or
D it c h li n e
P r o f il e g r a d e
0.5% min. slope
Subexcavation trench
(Mirror image for ditch RT)
2"
SUBEXCAVATION TRENCH DETAIL
18"2
6-inch perforated collector pipe geotextile, class 1, type C
Separation-stabilization
NOTE:
FOOTNOTE:
Subexcavation trench
13'-0"13'-0" m in
Profile grade m in
1.
ditchline is required.
Construct mirror image of outlet pipe(s) where draining to the subexcavation
Bottom of
(Top of subexcavation trench)
Bottom of subexcavation
(see Notes 1 and 2)
Outlet pipe
Select borrow
2-inch compacted depth (placed in one lift)
Asphalt concrete pavement, type 1, Existing shoulder m in pipe (6" dia) collector
Perforated
4-inch compacted depth
Roadway aggregate, method 2, requirements and minimize disturbances.
Skew outlet pipe as directed by the CO to meet pipe slope
Install outlet pipes to drain at a minimum 0.5% slope.
TYPE 2 SUBEXCAVATION AND BACKFILL SECTION
TYPE 2 SUBEXCAVATION
CL
18"
NO SCALE
OUTLET PIPE END DETAIL
RODENT SCREEN
0.5% min.
0.5% min.
Existing ground
Subgrade shoulder
6-inch outlet pipe
Bottom of subexcavation
6-inch outlet pipe
Bottom of subexcavation trench
Outlet pipe
Hose clamp
Wire mesh
Subexcavation backfill
Select borrow
Bottom of subexcavation excavation
Roadway pavement, asphalt
Removal of
Subexcavation shoulder
Existing
Granular backfill
:2
S e p te m b e r
T y p e
S u b e x c a V
A ti p w
-w o rk \d
\M
T
N P
S
G L
A C
(3
D
.d g n
TYPE 2 SUBEXCAVATION
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.5
NPS Drwg No. 117/137434 NPS PMIS No. 188751 nathan.fischer
GPS
24114
N
P
CP
11101
CP
11102
N
BEGIN PROJECT
28+95 to 29+45 milling (transition)
Asphalt pavement
31+05 to 32+07
Apgar Transit Approach RT
32+10 to 41+55
Type 1 Subexcavation RT
32+10 to 41+55
Type 1 Subexcavation RT
50 SCALE
28+95.00
REMAINING 4 MILES
AND RESURFACE
CAMAS ROAD SLUMPS
MT NPS GLAC 11(3)
CONSTRUCTION
BEGIN PROJECT
E = 881474.7058
N = 1588586.7625
3. See E sheets for subexcavation quantities and details.
2. See E sheets for asphalt pavement milling (transition) details.
1. See E sheets for overlay approach quantities and details.
NOTE:
:2
O c to b e r
L I N
E G
R A
H
T O p w
-w o rk
\d \M
T N
P S
G
L A
C (3 p la n p la n .d g n
28+95 TO 41+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.6
NPS Drwg No. 117/137434 NPS PMIS No. 188751 nathan.fischer
B
MP
C P
N
52+04 to 52+54 milling (transition)
Asphalt pavement
44+26 to 45+51
Apgar Loop Approach RT
32+10 to 41+55
Type 1 Subexcavation RT
45+56 to 47+46
Apgar Loop Turnout RT
52+29 to 52+48
McDonald Creek Trail Approach LT
52+29 to 52+48
McDonald Creek Trail Approach RT
50+86 to 52+26
McDonald Creek Turnout RT
48+64 to 48+82
Apgar Bike Path Approach LT and RT
SUSPEND WORK
54+14 to 54+64 milling (transition)
Asphalt pavement
1 4
2 4 3 4
50 554
50 51 52 53 54 55
50 SCALE
3. See E sheets for subexcavation quantities and details.
2. See E sheets for asphalt pavement milling (transition) details.
1. See E sheets for overlay approach and turnout quantities and details.
NOTE:
52+54 TO 54+14
OVERLAY
MT NPS GLAC 11(3)
:4
S e p te m b e r
L
I N
E G
R A
T O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
41+00 TO 55+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.7
N
N 61+42 to 62+20
Type 1 Subexcavation LT
59+01 to 60+36
Grist Road Approach RT
62+62 to 63+35
Type 1 Subexcavation RT
62+62 to 63+35
Type 1 Subexcavation RT
6056 57 58 59 60 61 6
3 6
4 6
50 SCALE
2. See E sheets for subexcavation quantities and details.
1. See E sheets for overlay approach quantities and details.
NOTE:
:4
S e p te m b e r
L
I N
E G
R A
T O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
55+60 TO 70+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.8
0 7
1 7 2 7
50 SCALE
:1 e p te m b e r
L I N
E G
R A
T O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
70+00 TO 84+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.9
94+21 to 100+50
Fish Creek Campground Approach RT
94+00 to 100+50
Fish Creek Campground Turnout LT
0 9
94 9
50 SCALE
1. See E sheets for overlay approach and turnout quantities and details.
NOTE:
:4
S e p te m b e r
L
I N
E G
R A
T O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
84+60 TO 99+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.10
G P S
C A
M A
S
N
103+01 to 109+18
Milepost 3.2 Turnout RT
94+00 to 100+50
Fish Creek Campground Turnout LT
94+21 to 100+50
Fish Creek Campground Approach RT
103+01 to 109+18
Milepost 3.2 Turnout RT
Method 1 RT
Roadway obliteration, Method 1 RT
Roadway obliteration, 0 1
50 SCALE
1. See E sheets for overlay approach and turnout quantities and details.
NOTE:
:4
S e p te m b e r
L
I N
E G
R A
T O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
99+00 TO 113+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.11
S
C A
M A
S
N
C P
N
115+00 to 115+50 pavement patch, Type 2 LT and RT
Asphalt concrete
STATION WORK
BEGIN ENTRANCE
50 SCALE
123+00
SUSPEND OVERLAY
MT NPS GLAC 11(3)
2. See F sheets for Entrance Station quantities and details.
1. See E sheets for subexcavation quantities and details.
NOTE:
:1 e p te m b e r
L I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
113+60 TO 128+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.12
N
N
STATION WORK
END ENTRANCE
50 SCALE
1. See F sheets for Entrance Station quantities and details.
NOTE:
129+40
RESUME OVERLAY
MT NPS GLAC 11(3)
:3 e p te m b e r
L I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
128+00 TO 142+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.13
156+05 to 157+65
Type 2 Subexcavation LT and RT
154+00 to 154+50 pavement patch, Type 2 RT
Asphalt concrete
6 1
50 SCALE
1. See E sheets for subexcavation quantities and details.
NOTE:
:3
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
142+60 TO 157+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.14
156+05 to 157+65
Type 1 Subexcavation LT and RT
170+02 to 172+27
Milepost 2.0 Turnout RT
170+00 to 170+50 pavement patch, Type 2 RT
Asphalt concrete
169+15 to 171+30
Standard underdrain system LT
5 1
50 SCALE
3. See I sheets for standard underdrain system quantities and details.
2. See E sheets for subexcavation quantities and details.
1. See E sheets for overlay turnout quantities and details.
NOTE:
:4
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
157+00 TO 171+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.15
170+02 to 172+27
Milepost 2.0 Turnout RT
172+92 to 174+42
Method 1 RT
Roadway obliteration, 174+70 to 175+70
Type 1 Subexcavation LT and RT 176+45 to 178+05
Type 2 Subexcavation LT and RT
178+35
Standard underdrain system LT
50 SCALE
3. See I sheets for standard underdrain system quantities and details.
2. See E sheets for subexcavation quantities and details.
1. See E sheets for overlay approach and turnout quantities and details.
NOTE:
:4
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
171+60 TO 186+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.16
P S
C A
M A
S
C P
3 4
N
199+35 to 202+75
Type 2 Subexcavation LT and RT
SLIDE WORK
CAMAS ROAD
188+40 to 189+55
Deep Patch Subexcavation RT
50 SCALE
193+77 TO 195+60
SUSPEND OVERLAY
MT NPS GLAC 11(3)
2. See G sheets for Camas Road Slide quantities and details.
1. See E sheets for subexcavation quantities and details.
NOTE:
:3
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
186+00 TO 200+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.17
S
C A
M A S
C P
N
N
199+35 to 202+75
Type 2 Subexcavation LT and RT
207+86 to 208+84
Method 1 RT
Roadway obliteration, 205+45 to 206+30
Type 1 Subexcavation LT and RT
50 SCALE
2. See E sheets for subexcavation quantities and details.
1. See E sheets for overlay approach and turnout quantities and details.
NOTE:
:4
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
200+60 TO 215+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.18
50 SCALE
:3
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
215+00 TO 229+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.19
231+00 to 234+15
Type 2 Subexcavation LT and RT
50 SCALE
1. See E sheets for subexcavation quantities and details.
NOTE:
:3
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
229+60 TO 244+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.20
255+53 to 257+23
Milepost 0.3 Turnout RT
50 SCALE
1. See E sheets for overlay turnout quantities and details.
NOTE:
:4
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
244+00 TO 258+60
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.21
50 SCALE
:3
J u ly
L I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \p la n P la n P ro fi le \M
T N
P S
G
L A
C (3 p la n p la n .d g n
258+60 TO 273+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.22
SUSPEND WORK
276+50 to 277+00 milling (transition)
Asphalt pavement
50 SCALE
277+00.00
CAMAS ROAD
MT NPS GLAC 11(3)
OVERLAY
E = 873001.4063
N = 1610935.8067
1. See E sheets for asphalt pavement milling (transition) details.
NOTE:
:3
S e p te m b e r
L
I N
E G
R A
T
O
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3 p la n p la n .d g n
273+00 TO 277+00
LINE GRAPH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) D.23
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
24114 1588533.231 881489.879 3181.921 48°31'18.217979"N 113°59'19.783153"W 3131.656 0.99959216 1/2" IR W/YPC,USE CAUTION IN AREA 1.
NOT24114 1588534.466 881485.545 3180.309 48°31'18.227698"N 113°59'19.848493"W 3130.044 0.99959223 1/2" IR W/YPC, USE CAUTION IN AREA
11101 1588890.827 881031.167 3180.435 48°31'21.482314"N 113°59'26.891995"W 3130.161 0.99959265 5/8" IR W/FHWA ALUM CAP
11102 1589203.920 880553.901 3178.230 48°31'24.297503"N 113°59'34.238410"W 3127.945 0.99959312 5/8" IR W/FHWA ALUM CAP
11103 1589529.361 880143.854 3177.291 48°31'27.272290"N 113°59'40.598419"W 3126.998 0.99959355 5/8" IR W/FHWA ALUM CAP
11104 1590102.625 879758.441 3173.079 48°31'32.702942"N 113°59'46.804470"W 3122.781 0.99959445 5/8" IR W/FHWA ALUM CAP
11105 1590720.984 879310.537 3173.184 48°31'38.542454"N 113°59'53.976408"W 3122.882 0.9995952 5/8" IR W/FHWA ALUM CAP
CAMAS1 1595765.882 878999.840 3497.141 48°32'28.077661"N 114°00'02.890994"W 3446.892 0.99958619 5/8" IR w/FHWA Alum cap
CAMAS2 1596279.029 878947.144 3525.791 48°32'33.104195"N 114°00'04.111012"W 3475.547 0.99958548 5/8" IR w/FHWA Alum cap
1 1596996.752 878690.396 3542.746 48°32'40.030860"N 114°00'08.53392"W 3492.539 0.999585329 RPC
2 1597454.490 878489.262 3545.539 48°32'44.427200"N 114°00'11.90973"W 3495.3325 0.999585772 RPC
CAMAS3 1604050.869 876748.565 3873.375 48°33'48.436981"N 114°00'43.387555"W 3823.202 0.99957883 5/8" IR w/FHWA Alum cap
CAMAS4 1604498.472 876612.643 3880.591 48°33'52.770189"N 114°00'45.788615"W 3830.422 0.99957906 5/8" IR w/FHWA Alum cap
CAMAS5 1626095.536 863284.924 3775.809 48°37'17.942929"N 114°04'22.378075"W 3725.599 0.99961183 5/8" IR w/FHWA Alum cap
CAMAS6 1626316.155 863059.445 3768.540 48°37'19.986746"N 114°04'25.920669"W 3718.328 0.99961246 5/8" IR w/FHWA Alum cap
PROJECT : Camas Road DATE OF FIELD WORK : June/July 2016
PROJECT UNITS : International Foot COORDINATE SYSTEM : Montana SPCS NAD83 GEOID99 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID99
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
0\ M on ta na \C am as
\P W
C am as R oa d_ co nt ro ls he et
_v 2.
xl sx
]S he et
-J ul
-2
:4
A M
W
FL
H D
S ur ve y
W
FL
H D
S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.24
SHEET
NUMBER
NPS GLAC 11(3)MT
SURVEY CONTROL
Asphalt concrete milling (transition)
Tack coat
PAVED APPROACH PROFILE
MCDONALD CREEK TRAIL RT (52+29 to 52+48)
MCDONALD CREEK TRAIL LT (52+29 to 52+48)
APGAR BIKE PATH LT & RT (48+64 to 48+82)
Saw cut verticalCamas Road Overlay
Edge of shoulder for pavement existing
Top of
Approach Length Varies million ESAL, type II pavement roughness maximum size aggregate, 0.3 to <3 " nominal4
" or 2 gyratory mix, Asphalt concrete pavement, Match existing cross-slope, unless otherwise directed by the CO.
Match thickness of adjacent Camas Road Overlay. See Sheet C.1.
and RT side approaches. See Sheet E.7.
The McDonald Creek Trail quantities shown are for both the LT
RT side approaches. See Sheet E.6.
The Apgar Bike Path quantities shown are for both the LT and in the field as directed by the CO.
applicable details shown on Sheets E.3-13. Adjust layouts
Construct approach variations and edges according to the
3.
2.
1.
Profile grade
Existing ground
CL
11' travel way
Shldr
2'11' travel way
Shldr
2'
1:3 1:3
APPROACH SECTION
typ, both sides
Aggregate topsoil course, Top of existing pavement
Cross-slope
Tack coat
Cross-slope ground
Existing
CL
1:3 1:3
Profile grade
Existing ground
APPROACH SECTION
typ, both sides
Aggregate topsoil course, Top of existing pavement
Cross-slope
Tack coat
Cross-slope ground
Existing
-inch compacted depth2 type II pavement roughness, 2 nominal maximum size aggregate, 0.3 to <3 million ESAL, "4
" or 2
Asphalt concrete pavement, gyratory mix, type IV pavement roughness, 2-inch compacted depth nominal maximum size aggregate, 0.3 to <3 million ESAL, "4
" or 2
Asphalt concrete pavement, gyratory mix, FISH CREEK CAMPGROUND ROAD RT (94+20 to 100+50)
GRIST ROAD RT (59+01 to 60+36)
MCDONALD CREEK TRAIL RT (52+29 to 52+48)
APGAR BIKE PATH LT & RT (48+64 to 48+82); MCDONALD CREEK TRAIL LT (52+29 to 52+48)
APGAR TRANSIT RT (31+05 to 32+07); APGAR LOOP RT (44+26 to 45+51)
11' travel way
Shldr
2'11' travel way
Shldr
2'
NOTE:
FOOTNOTE:
NO SCALE
L im it
W o rk
:2
S e p te m b e r
A
P P
R O
A C
H Q
U A
N T
IT
IE
S A
N D
D E
T A
M y
F il e s \F
H W
A \D e s ig n \C a m a s
R o a d
\F ix
K io s k
R a m p \M
T
N P
S
G L
A C
(3
E
.d g n
DETAILS
APPROACH QUANTITIES AND
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.1
Camas Road Overlay
Edge of shoulder for
11'-0" travel way
Shldr
2'-0"
-2%
Turnout width varies course topsoil
Aggregate
NOTE:
FOOTNOTE:
NO SCALE
CL
1:3 and 255+53 RT to 257+23 RT (MP 0.3)
103+01 RT to 109+18 RT (MP 3.2); 170+02 RT to 174+42 RT (MP 2.0);
94+00 LT to 100+50 LT (FISH CREEK CAMPGROUND);
and 50+86 RT to 52+26 RT (MCDONALD CREEK)
45+56 RT to 47+46 RT (APGAR LOOP);
pavement roughness, 2-inch compacted depth maximum size aggregate, 0.3 to <3 million ESAL, type II " nominal4
" or 2
Asphalt concrete pavement, gyratory mix, pavement roughness, 2.5-inch compacted depth maximum size aggregate, 0.3 to <3 million ESAL, type II " nominal4
" or 2
Asphalt concrete pavement, gyratory mix, Top of existing pavement
2.
1.
to fit field conditions.
Adjust aggregate topsoil course slope according to the CO
Match existing cross-slope, unless otherwise directed by the CO.
Place continuously with Camas Road Overlay work. See Sheet C.1.
Turnouts RT shown. Construct mirror image for Turnouts LT.
the field as directed by the CO.
details shown on Sheets E.5, E.7, and E.9-13. Adjust layouts in
Construct turnout variations and edges according to the applicable
Tack coat
TYPICAL TURNOUT OVERLAY
Camas Road Overlay
Edge of shoulder for
11'-0" travel way
Shldr
2'-0"
Cross-slope
Top of existing pavement
Turnout width varies
Aggregate topsoil course ground
Existing ground
Existing
TYPICAL TURNOUT PAVING
CL
1:3
4-inch compacted depth
Roadway aggregate, method 2, type 1, 2-inch compacted depth
Asphalt concrete pavement, compacted depth
Roadway aggregate, method 2, and turf establishment topsoil, 4-inch depth
Furnishing and placing
A p p ro x
Varies
Obliteration
Roadway
:1 e c e m b e r
T
U R
N O
U T
Q U
A N
T
IT
IE
S
A N
D D
E T
A
M y
F il e s \F
H W
A \D e s ig n \C a m a s
R o a d
\F ix
K io s k
R a m p \M
T
N P
S
G L
A C
(3
E
.d g n
DETAILS
TURNOUT QUANTITIES AND
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.2
N milling (transition), Asphalt pavement
Overlay Apgar Transit approach RT for quantities and details see Sheets D.3 and D.4
Type 1 subexcavation, 31+05
Begin 13'-0" RT
32+07
End 13'-0" RT
40'-0"
25' -0"
R
R
55'-0"R
'-0
R
20 SCALE
Sheet L.8 for pavement marking details.
3. See Sheet L.3 for pavement marking quantities and
2. See Sheet E.1 for asphalt pavement milling (transition) details.
1. See Sheet E.1 for overlay approach quantities and details.
NOTE:
:5
S e p te m b e r
A
P G
A R
T R
A N
S
IT
A P
P R
O A t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
31+05 TO 32+07
APGAR TRANSIT APPROACH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.3
N see Sheet E.5 for details
Apgar loop turnout, 45+51
End 13'-0" RT
44+26
Begin 13'-0" RT
Overlay Apgar Loop approach RT milling (transition), Asphalt pavement
3 4
20 SCALE
38'-0"
R 30'-0"R
Sheet L.8 for pavement marking details.
3. See Sheet L.3 for pavement marking quantities and
2. See Sheet E.1 for asphalt pavement milling (transition) details.
1. See Sheet E.1 for overlay approach quantities and details.
NOTE:
:4
S e p te m b e r
A
P G
A R
L O
O P
A P
P R
O A t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
44+26 TO 45+51
APGAR LOOP APPROACH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.4
45+56
Begin 13'-0" RT
47+46
End 13'-0" RT
Overlay Apgar Loop turnout RT see Sheet E.4 for details
Apgar loop approach, 46+00
24'-0" RT
47+00
24'-0" RT
6 47
20 SCALE
R
R
R
R
Sheet L.8 for pavement marking details.
2. See Sheet L.3 for pavement marking quantities and
1. See Sheet E.1 for overlay turnout quantities and details.
NOTE:
:4
S e p te m b e r
A
P G
A R
L O
O P
T U
R N
O U t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
45+56 TO 47+46
APGAR LOOP TURNOUT
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.5
48+64
Begin 13'-0" LT
48+82
End 13'-0" LT
Overlay Apgar Bike Path approach RT
Overlay Apgar Bike Path approach LT
48+82
End 13'-0" RT48+64
Begin 13'-0" RT
8 49 5
20 SCALE
8'-0"
8'-0"
5'-0" R
5' -0
R
5' -0
R 5'-0"
R
Sheet L.8 for pavement marking details.
2. See Sheet L.3 for pavement marking quantities and
1. See Sheet E.1 for overlay approach quantities and details.
NOTE:
:4
S e p te m b e r
A
P G
A R
B
IK
E P
A T
H A
P P
R O
A t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
48+64 TO 48+82
APGAR BIKE PATH APPROACH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.6
P
C P
N
Overlay McDonald Creek Trail approach LT
52+48
End approach 13'-0" LT
52+26
End turnout 13'-0" RT
50+86
Begin turnout 13'-0" RT
52+29
Begin approach 13'-0" LT
Trail approach RT
Overlay McDonald Creek milling (transition), Asphalt pavement
51+30
24'-0" RT 51+80
24'-0" RT
Overlay McDonald Creek turnout RT
52+48
End approach 13'-0" RT 52+29
Begin approach 13'-0" RT
Sawcut
Sawcut
52+48
20.73' LT
52+29
17'-0" RT
51+21
20'-0" RT
52+24
25'-0" RT
52+33
20'-0" RT
52+41
17'-0" RT
52+48
17'-0" RT
pavement edge
Match existing
20 SCALE
R
R
R
'-0
R
Sheet L.8 for pavement marking details.
3. See Sheet L.3 for pavement marking quantities and
2. See Sheet E.1 for asphalt pavement milling (transition) details.
1. See Sheet E.1 for overlay approach and turnout quantities and details.
NOTE:
:1
S e p te m b e r
M
C D
O N
A L
D C
R E
E K
T U
R N
O
D A
P P
R O
A C
H t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
50+86 TO 52+48
AND APPROACHES
MCDONALD CREEK TURNOUT
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.7
milling (transition)
Asphalt pavement
Overlay Grist Road approach RT
60+36
End 13'-0" RT
59+01
Begin 13'-0" RT
20 SCALE
22ft-0in ft-in ft -0 in
R ft-0 in R
Sheet L.8 for pavement marking details.
3. See Sheet L.3 for pavement marking quantities and
2. See Sheet E.1 for asphalt pavement milling (transition) details.
1. See Sheet E.1 for overlay approach quantities and details.
NOTE:
:1
S e p te m b e r
G
R
IS
T R
O A
D A
P P
R O
A t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
59+01 TO 60+36
GRIST ROAD APPROACH
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.8
94+00
13'-0" LT
Begin turnout
Overlay Fish Creek Campground turnout LT
95+53
18'-0" RT
100+50
13'-0" LT
End turnout
Overlay Fish Creek Campground approach RT
100+50
End approach 13'-0" RT
94+21
Begin approach 13'-0" RT milling (transition)
Asphalt pavement
94+45
15'-0" LT 95+15
21'-0" LT
95+53
23'-0" LT
98+63
23'-0" LT
99+25
20'-0" LT
98+35
16'-0" RT
99+56
16'-0" RT
5 1
5 9 6 9 7 9
50 SCALE
R
R
R
R
'-0
R
32'-0"
36'-0"
Sheet L.8 for pavement marking details.
3. See Sheet L.3 for pavement marking quantities and
2. See Sheet E.1 for asphalt pavement milling (transition) details.
1. See Sheet E.1 for overlay approach and turnout quantities and details.
NOTE:
:5
S e p te m b e r
F
IS
H
C R
E E
K C
A M
P G
R O
U N
D T
U R
N O
U T
A N
D A
P P
R O
A t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
94+00 TO 100+50
TURNOUT AND APPROACH
FISH CREEK CAMPGROUND
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.9
Method 1 RT
Roadway obliteration, Overlay Milepost 3.2 turnout RT
103+01
Begin 13'-0" RT
109+18
End 13'-0" RT
Method 1 RT
Roadway obliteration, 104+65
43'-0" RT
107+35
43'-0" RT
50 SCALE
R
R
'-0
R
'-0
R
Sheet L.8 for pavement marking details.
2. See Sheet L.3 for pavement marking quantities and
1. See Sheet E.1 for overlay turnout quantities and details.
NOTE:
:1
S e p te m b e r
M
IL
E
P O
S T
.2
T U
R N
O t o
M y F il e s \F
H W
A \D e s ig n \C a m a s R o a d \S h e e ts to p ri n t\
M T
N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
103+01 TO 109+18
MILEPOST 3.2 TURNOUT
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.10
Method 1 RT
Roadway obliteration, 170+02
Begin 13'-0" RT
Overlay Apgar Loop turnout RT
172+27
End 13'-0" RT see Sheet D.3 for quantities and details
Asphalt concrete pavement patch, Type 2see Sheet I.1 for quantities and Sheet I.2 for details
Standard underdrain system
170+72 RT
informational kiosk
Remove and reset
174+42
End 13'-0" RT
172+92
Begin 13'-0" RT
40 SCALE
R
R
R
Sheet L.8 for pavement marking details.
2. See Sheet L.3 for pavement marking quantities and
1. See Sheet E.1 for overlay turnout quantities and details.
NOTE:
:2
O c to b e r
M
IL
E P
O S
T
.0 T
U R
N O t o
M y
F il e s \F
H W
A \D e s ig n \C a m a s
R o a d
\Q A
R e v ie w
\M T
N
P S
G
L A
C
(3
A p p ro a c h
V ie w s .d g n
170+02 TO 174+42
MILEPOST 2.0 TURNOUT
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.11
207+86
Begin 13'-0" RT
208+84
End 13'-0" RT
Method 1 RT
Roadway obliteration, 20 SCALE
1. See Sheet E.2 for roadway obliteration quantities and details.
NOTE:
:2
O c to b e r
O B
L
IT
E R
A T
IO
N
T U
R N
O t o p w
-w o rk
\d \M
T N
P S
G
L A
C (3
A p p ro a c h V ie w s .d g n
207+86 TO 208+84
OBLITERATION TURNOUT
STATE PROJECT
NUMBER
SHEET
MT NPS GLAC 11(3) E.12
NPS Drwg No. 117/137434 NPS PMIS No. 188751 nathan.fischer
255+53
Begin 13'-0" RT
256+58
26'-0" RT
Overlay Milepost 0.3 turnout RT
256+03
26'-0" RT
257+23
End 13'-0" RT
255+87
23'-0" RT
256+68
25'-0" RT
255+69
16'-0" RT
257+12
15'-0" RT
20 SCALE
R
R 4
R
R
Sheet L.8 for pavement marking details.
2. See Sheet L.3 for pavement marking quantities and
1. See Sheet E.1 for overlay…