Vertical_Alignment_Entrance_Station.pdf

PDF 369 KB Posted

Attached to
MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles
Solicitation number
69056720B000031
Issued by

About this file

This vertical alignment review report details the proposed grade changes along a 4-mile section of the Camas Road in Glacier National Park, Montana. The project involves asphalt concrete paving, sub-excavation, slide repair, turnout rehabilitation, curb and gutter, sidewalks, underdrains, ditch reconditioning, and signing and striping. The report provides station elevations and element descriptions for the vertical alignment of the entrance road from the kiosk to the project end, including linear sections, symmetrical parabolas connecting different grades, and corresponding tangent lengths, entrance and exit grades, and middle ordinates. The related federal contract opportunity is being conducted by the Department of Transportation Federal Highway Administration for the MT NPS GLAC 11(3) Camas Road Slumps and Resurface Remaining 4 Miles project.

View the file

Other files

File Type Posted
Bid Summary .pdf PDF
QA_03-22-2021.pdf PDF
QA_03-23-2021.pdf PDF
QA_03-19-2021.pdf PDF
Amd A003.pdf PDF
QA_03-17-2021.pdf PDF
QA_03-18-2021.pdf PDF
Amd A002.pdf PDF
SF-1442.pdf PDF
Sheet F.6.pdf PDF
Sheet F.10.pdf PDF
Pages D-1 through D-17.pdf PDF
Sheet F.4.pdf PDF
Amd. A001.pdf PDF
Page F-40.pdf PDF
Sheet F.11.pdf PDF
Page F-42.pdf PDF
Page F-29.pdf PDF
Page G-10.pdf PDF
QA_03-16-2021.pdf PDF
QA_03-15-2021.pdf PDF
QA_03-12-2021_2.pdf PDF
QA_03-12-2021.pdf PDF
QA_03-10-2021.pdf PDF
GR 02-20 Camas Road Geotechnical Report.pdf PDF
Earthwork_Wolf_Overlook.pdf PDF
MT NPS GLAC 11(3)_Binder_SWPPP.pdf PDF
Vertical_Alignment_Wolf_Overlook.pdf PDF
glac01103_Plans.pdf PDF
Horizontal_Alignment_Wolf_Overlook.pdf PDF
Earthwork_Slide_Repair.pdf PDF
Horizontal_Alignment_Entrance_Station.pdf PDF
MT_NPS_GLAC_11(3)_Cross_Sections.pdf PDF
Horizontal_Alignment_Slide_Repair.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
IFB 69056720B000031.pdf PDF
Earthwork_Entrance_Station.pdf PDF
Camas Road_controlsheet.xlsx XLSX spreadsheet
Vertical_Alignment_Slide_Repair.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vertical Alignment Review Report for the

Camas Entrance Station for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

MT NPS GLAC 11(3)

Camas Road Slumps and Resurface Remaining 4 Miles

Vertical Alignment Review Report

Report Created: Wednesday, December 9, 2020 Time: 10:21:13 AM

Project: Default

Description:

File Name: C:\MyFiles\FHWA\Design\Camas_Road\Physical_Data\Entrance_Road_New.dgn

Last Revised: 12/9/2020 10:18:34 Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: BL_kiosk

Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: BL2

Vertical Description:

Vertical Style: Alignment\Baseline

Station Elevation

Element: Linear

START 11198.960 3500.206

VPC 11582.812 3522.019

Tangent Grade: 0.057

Tangent Length: 383.852

Element: Symmetrical Parabola

VPC 11582.812 3522.019

VPI 11960.312 3543.471

VPT 12337.812 3544.222

Length: 755.000

Entrance Grade: 0.057

Exit Grade: 0.002 r = (g2 - g1) / L: -0.726

K = l / (g2 - g1): 137.681

Middle Ordinate: -5.175

Element: Linear

VPT 12337.812 3544.222

VPC 12685.405 3544.913

Tangent Grade: 0.002

Tangent Length: 347.594

Element: Symmetrical Parabola

VPC 12685.405 3544.913

VPI 13140.405 3545.818

VPT 13595.405 3558.983

Length: 910.000

Page 1 of 2Vertical Alignment Review Report

12/9/2020file:///C:/Users/nathan.fischer/AppData/Local/Temp/RPTaqr3udil.html nathan.fischer Sticky Note Completed set by nathan.fischer

Entrance Grade: 0.002

Exit Grade: 0.029 r = (g2 - g1) / L: 0.296

K = l / (g2 - g1): 337.744

Middle Ordinate: 3.065

Element: Linear

VPT 13595.405 3558.983

END 14117.460 3574.087

Tangent Grade: 0.029

Tangent Length: 522.055

Page 2 of 2Vertical Alignment Review Report

12/9/2020file:///C:/Users/nathan.fischer/AppData/Local/Temp/RPTaqr3udil.html