VA PUMP 1 field test report.pdf
PDF 204 KB Posted
- Attached to
- C1NZ--Design Build Project: 629-20-118 CFM - Redesign and Repair Fire and Jockey Pump Systems
- Solicitation number
- 36C25621R0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sprinkler - CEP - 3 Standpipes.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| Section 01 33 23.docx | DOCX document | |
| CEP_L03_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| CEP_ 3 Standpipes_Sprinkler.pdf | ||
| VA PUMP 2 FIELD TEST REPORT.pdf | ||
| CEP_L04-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 00 00.docx | DOCX document | |
| Section 01 35 26.docx | DOCX document | |
| CEP_L04_ALL_FP_NS_FAB.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| 4. VA Master Specs Table of Contents.docx | DOCX document | |
| CEP_L03-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 32 16_15.docx | DOCX document | |
| CEP_Fire_Pump_Test_Method Of Procedure 06-02-16.pdf | ||
| 015-7FX301.pdf | ||
| 016-7FX302.pdf | ||
| 36C25621R0026_1.docx | DOCX document | |
| Section 00 11 21.docx | DOCX document | |
| General Decision LA 20200041 10-09-2020.pdf | ||
| EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf | ||
| 017-7FX501.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P.O. BOX 10608, NEW ORLEANS, LA 70181
(504) 733-1330 FAX (504) 736-9348
FIRE PUMP TEST
PER
NFPA 20
Property V.A. HOSPITAL Address 2418 CANAL STREET
Date 7-28-2015 NEW ORLEANS, LA. 70119
Contractor NORTHSTAR FIRE PROTECTION
Pump Manufacturer AURORA Capacity 1000 GPM 145 PSI
Model 12CFM-4 STAGE 150% 1500 GPM 99.7 PSI
Serial # 2360595-0 S.O. 0 GPM 179.0 PSI
Imp. Dia. 4 @ 9.61" Size 6" “X “
RPM __1770_________________________
Controller
Manufacturer METRON Serial # 23120674
Model MP300-125-46--
MTS
H.P. 125 Voltage 460
Phase 3 Cycles 60
Interrupting Capacity 100,000
Electric Motor
Manufacturer U.S. Serial # U10-469831-0001-GT-01
H.P. 125 Voltage 460 AMP 147.0
RPM 1780 Phase 3 Cycles 60 Enclosure WP1
Conductors # Size (To Controller)
Conductors # Size (To Motor))
Transformer
Piping
Sensing Lines Per NFPA 20 Yes No
Check Valves Suction ----- Discharge 6" Bypass ---
OS&Y Valves Suction ---- Discharge 6" Bypass -----
TEST Header 6" with 4 2-1/2 Hose Valves
Roof Manifold
Pump Casing Relief Valve ------- Auto Air Release -------
Gauges: Suction ------ Discharge 3-1/2" System 3-1/2"
Jockey Pump Cut in Pressure: 150 Cut out Pressure: 160
Fire Pump Cut in Pressure: 140 Cut out Pressure: 145
Manual Stop: Auto Stop: XX Time 10 Min. 10 Manual Starts 10 Auto Starts
Remarks: Personnel At Test:
TRANSFER SWITCH TEST NOT COMPLETED AT THIS JESSE KLUPS - NORTHSTAR FIRE PROTECTION
TIME CHUCK RHODES - NORTHSTAR FIRE PROTECTION
JASON CHRISTOPHERSON - NORTHSTAR FIRE PROTEC.
CHRIS FAVA - CMHP
TOM EPPY - CMHP
GERALD FAULKNER - VA HOSPITAL
STEVE ECUYER -AURORA -FLUID PROCESS PUMPS
(504) 733-1330 FAX (504) 736-9348
Property Name: V.A. HOSPITAL PUMP #1
Date: 7-28-2015
Time Electric Motor Pump Pressures Flow Nozzel / Pitot / GPM Total
Volts Amps RPM Suct Disc Net # 1 2 3 4 GPM
487 79 -30' 162 175
10:31 490 79 1783
490 83 1 0
486 124 -30 130 143 1-3/4" 1-3/4"
10:36 488 126 1776 30 35
488 130 2 501 540 1041
485 135 -30 88 101 FLOW Meter
10:44 488 135 1772
488 139 3 1500
Stand Pipe Test Test Conducted By
Static Pressure PSI STEVE ECUYER
Pitot Pressure
GPM Flowing GPM
Flowing Pressure PSI
File details come from the government source that posted it. Updated .