016-7FX302.pdf
PDF 438 KB Posted
- Attached to
- C1NZ--Design Build Project: 629-20-118 CFM - Redesign and Repair Fire and Jockey Pump Systems
- Solicitation number
- 36C25621R0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sprinkler - CEP - 3 Standpipes.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| Section 01 33 23.docx | DOCX document | |
| CEP_L03_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| CEP_ 3 Standpipes_Sprinkler.pdf | ||
| VA PUMP 2 FIELD TEST REPORT.pdf | ||
| CEP_L04-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 00 00.docx | DOCX document | |
| Section 01 35 26.docx | DOCX document | |
| CEP_L04_ALL_FP_NS_FAB.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| 4. VA Master Specs Table of Contents.docx | DOCX document | |
| CEP_L03-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 32 16_15.docx | DOCX document | |
| CEP_Fire_Pump_Test_Method Of Procedure 06-02-16.pdf | ||
| 015-7FX301.pdf | ||
| 36C25621R0026_1.docx | DOCX document | |
| VA PUMP 1 field test report.pdf | ||
| Section 00 11 21.docx | DOCX document | |
| General Decision LA 20200041 10-09-2020.pdf | ||
| EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf | ||
| 017-7FX501.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T ectonic Cop yright 2007
JOCKEY
PUMP JP-1
FIRE PUMP FP-2
8" TEST MAIN
DOWN TO 1ST
LEVEL
8" FIRE MAIN UP TO
4TH LEVEL
FIRE PUMP FP-1
JOCKEY PUMP
CONTROLLER
FIRE PUMP FP-2
CONTROLLER
FIRE PUMP FP-1
CONTROLLER
6" FIRE MAIN DOWN
TO FIRST LEVEL
FLOW
METER
8" TEST MAIN
RETURN TO FIRE
TANK
OUTLINE OF SHAFT
BELOW
07 XA 07 A 07 J
07 5
07 7
07 H
FLOW METER
(EXACT LOCATION PER
PUMP MANUFACTURERS
RECOMMENDATION)
8"ø
6"ø
8"ø 8"ø
7FX302
7FX302
8"ø
CHECK VALVE
AUTOMATIC AIR
RELEASE VALVE & DRAIN
EXTEND DRAIN
TOWARD FLOOR DRAIN
FLOOR DRAIN
LOCATION (SEE
PLUMBING
DRAWINGS)
7-L1 100' - 0"
7-L2 122' - 8"
7-L3 140' - 0"
Street 92' - 0 29/32"
07 XA 07 A07 H
01B BASEMENT
88' - 0"
SECTIONAL PUMP SHAFT DOWN
TO FIRE PROTECTION WATER
TANK
8"ø
8"ø
8"ø
8"ø
6"ø
6"ø
FIRE PUMP FP-1
FIRE PUMP
CONTROLLER
TEST MAIN RETURN
TO FIRE TANK
7FX301
7-L1 100' - 0"
7-L2 122' - 8"
7-L3 140' - 0"
Street 92' - 0 29/32"
07 5
01B BASEMENT
88' - 0"
JOCKEY PUMP JP-1 SUCTION
6" FP-2 SUCTION
6" PUMP TEST DISCHARGE
6" FP-1 SUCTION
TERMINATE PUMP SUCTION
INLETS 2" ABOVE BOTTOM OF
FIRE TANK SUMP
11 1
FIRE PUMP FP-2
CONTROLLER
FIRE PUMP FP-1
CONTROLLER
JOCKEY PUMP JP-1
CONTROLLER
6"ø
6"ø
2"ø
8"ø
8"ø
8" FIRE MAIN UP
TO 3RD LEVEL
11 1
11 1
8"ø
AUTOMATIC AIR VENT
1-1/2" DRAIN
FORM AIR VENT
INSTALL VERTICAL PUMP SUCTION INLETS IN 10'-0"
FLANGED SECTIONS TO FACILITATE REMOVAL AND
MAINTENANCE.
KEYED NOTES:
7-L1 100' - 0"
Street 92' - 0 29/32"
07 Z07 Y
FIRE DEPARTMENT
CONNECTION
CHECK VALVE WITH
BALL DRIP
6" IN 10" PIPE
SLEEVE
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
TE
R
IN
C H
O
N E
FO
O
T O
N E
H A L
F
IN
C H
O
N E
FO
O
T
TH
R
EE
Q U
AR
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
E E T
(1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
X T
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
ES
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
7FX302
SECTIONS AND DETAILS
CRS MJOctober 31, 2011
7629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON / CIVIL
KORDA/NEMETH ENGINEERS / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECURAL ENGINEERS / PLUMBING
SCALES & ASSOCIATES INC. / FIRE PROTECTION
COMMUNICATION DESIGN GROUP / LOW VOLTAGE
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
PYBURN & ODOM / ABATEMENT
Department of
Veterans Affairs
OFFICE OF
CONSTRUCTION
MANAGEMENTEWP_07
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED
1/4" = 1'-0"
ENLARGED PLAN - FIRE PUMP ROOM
1/4" = 1'-0"
SECTION AT FIRE PUMP
1/4" = 1'-0"
FIRE PUMP ELEVATION
TERMINATE PUMP
SUCTION INLET ABOVE
BOTTOM OF FIRE TANK
SUMP
1/4" = 1'-0"
SECTION AT FIRE DEPATMENT CONNECTION
RFI 01433.1: Disregard Detail 4 as the 6" pipe is run from above vs. being run underground. See RFI for more detail.
RFI:01433.2 - Standpipe feeding the FDC will be run from above and exit through the exterior skin just above the slab. The outside grade will be adjusted to ensure FDC falls within NFPA height requirements.
RFI:02074 - Vertical Turbine Fire Pump Opening Supports and Curb
RFI:02074.1 - Vertical Turbine Fire Pump Opening Supports and Curb
RFI:02074.2 - Vertical Turbine Fire Pump Opening Supports and Curb
File details come from the government source that posted it. Updated .