View the file

Other files

File Type Posted
Sprinkler - CEP - 3 Standpipes.pdf PDF
CEP_L01_ALL_FP_NS_FAB.pdf PDF
CEP_L02_ALL_FP_NS_FAB.pdf PDF
Section 01 33 23.docx DOCX document
CEP_L03_ALL_FP_NS_FAB.pdf PDF
CEP_L02_ALL_FP_NS_FAB.pdf PDF
CEP_ 3 Standpipes_Sprinkler.pdf PDF
VA PUMP 2 FIELD TEST REPORT.pdf PDF
CEP_L04-5_ALL_FP_NS_FAB.pdf PDF
Section 01 00 00.docx DOCX document
Section 01 35 26.docx DOCX document
CEP_L04_ALL_FP_NS_FAB.pdf PDF
CEP_L01_ALL_FP_NS_FAB.pdf PDF
4. VA Master Specs Table of Contents.docx DOCX document
CEP_L03-5_ALL_FP_NS_FAB.pdf PDF
Section 01 32 16_15.docx DOCX document
CEP_Fire_Pump_Test_Method Of Procedure 06-02-16.pdf PDF
015-7FX301.pdf PDF
36C25621R0026_1.docx DOCX document
VA PUMP 1 field test report.pdf PDF
Section 00 11 21.docx DOCX document
General Decision LA 20200041 10-09-2020.pdf PDF
EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf PDF
017-7FX501.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T ectonic Cop yright 2007

JOCKEY

PUMP JP-1

FIRE PUMP FP-2

8" TEST MAIN

DOWN TO 1ST

LEVEL

8" FIRE MAIN UP TO

4TH LEVEL

FIRE PUMP FP-1

JOCKEY PUMP

CONTROLLER

FIRE PUMP FP-2

CONTROLLER

FIRE PUMP FP-1

CONTROLLER

6" FIRE MAIN DOWN

TO FIRST LEVEL

FLOW

METER

8" TEST MAIN

RETURN TO FIRE

TANK

OUTLINE OF SHAFT

BELOW

07 XA 07 A 07 J

07 5

07 7

07 H

FLOW METER

(EXACT LOCATION PER

PUMP MANUFACTURERS

RECOMMENDATION)

8"ø

6"ø

8"ø 8"ø

7FX302

7FX302

8"ø

CHECK VALVE

AUTOMATIC AIR

RELEASE VALVE & DRAIN

EXTEND DRAIN

TOWARD FLOOR DRAIN

FLOOR DRAIN

LOCATION (SEE

PLUMBING

DRAWINGS)

7-L1 100' - 0"

7-L2 122' - 8"

7-L3 140' - 0"

Street 92' - 0 29/32"

07 XA 07 A07 H

01B BASEMENT

88' - 0"

SECTIONAL PUMP SHAFT DOWN

TO FIRE PROTECTION WATER

TANK

8"ø

8"ø

8"ø

8"ø

6"ø

6"ø

FIRE PUMP FP-1

FIRE PUMP

CONTROLLER

TEST MAIN RETURN

TO FIRE TANK

7FX301

7-L1 100' - 0"

7-L2 122' - 8"

7-L3 140' - 0"

Street 92' - 0 29/32"

07 5

01B BASEMENT

88' - 0"

JOCKEY PUMP JP-1 SUCTION

6" FP-2 SUCTION

6" PUMP TEST DISCHARGE

6" FP-1 SUCTION

TERMINATE PUMP SUCTION

INLETS 2" ABOVE BOTTOM OF

FIRE TANK SUMP

11 1

FIRE PUMP FP-2

CONTROLLER

FIRE PUMP FP-1

CONTROLLER

JOCKEY PUMP JP-1

CONTROLLER

6"ø

6"ø

2"ø

8"ø

8"ø

8" FIRE MAIN UP

TO 3RD LEVEL

11 1

11 1

8"ø

AUTOMATIC AIR VENT

1-1/2" DRAIN

FORM AIR VENT

INSTALL VERTICAL PUMP SUCTION INLETS IN 10'-0"

FLANGED SECTIONS TO FACILITATE REMOVAL AND

MAINTENANCE.

KEYED NOTES:

7-L1 100' - 0"

Street 92' - 0 29/32"

07 Z07 Y

FIRE DEPARTMENT

CONNECTION

CHECK VALVE WITH

BALL DRIP

6" IN 10" PIPE

SLEEVE

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H A L

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

E E T

(1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

X T

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

NEW ORLEANS, LOUISIANA

7FX302

SECTIONS AND DETAILS

CRS MJOctober 31, 2011

7629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

SCHRENK & PETERSON / CIVIL

KORDA/NEMETH ENGINEERS / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECURAL ENGINEERS / PLUMBING

SCALES & ASSOCIATES INC. / FIRE PROTECTION

COMMUNICATION DESIGN GROUP / LOW VOLTAGE

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

PYBURN & ODOM / ABATEMENT

Department of

Veterans Affairs

OFFICE OF

CONSTRUCTION

MANAGEMENTEWP_07

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

1/4" = 1'-0"

ENLARGED PLAN - FIRE PUMP ROOM

1/4" = 1'-0"

SECTION AT FIRE PUMP

1/4" = 1'-0"

FIRE PUMP ELEVATION

TERMINATE PUMP

SUCTION INLET ABOVE

BOTTOM OF FIRE TANK

SUMP

1/4" = 1'-0"

SECTION AT FIRE DEPATMENT CONNECTION

RFI 01433.1: Disregard Detail 4 as the 6" pipe is run from above vs. being run underground. See RFI for more detail.

RFI:01433.2 - Standpipe feeding the FDC will be run from above and exit through the exterior skin just above the slab. The outside grade will be adjusted to ensure FDC falls within NFPA height requirements.

RFI:02074 - Vertical Turbine Fire Pump Opening Supports and Curb

RFI:02074.1 - Vertical Turbine Fire Pump Opening Supports and Curb

RFI:02074.2 - Vertical Turbine Fire Pump Opening Supports and Curb