015-7FX301.pdf
PDF 1 MB Posted
- Attached to
- C1NZ--Design Build Project: 629-20-118 CFM - Redesign and Repair Fire and Jockey Pump Systems
- Solicitation number
- 36C25621R0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sprinkler - CEP - 3 Standpipes.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| Section 01 33 23.docx | DOCX document | |
| CEP_L03_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| CEP_ 3 Standpipes_Sprinkler.pdf | ||
| VA PUMP 2 FIELD TEST REPORT.pdf | ||
| CEP_L04-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 00 00.docx | DOCX document | |
| Section 01 35 26.docx | DOCX document | |
| CEP_L04_ALL_FP_NS_FAB.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| 4. VA Master Specs Table of Contents.docx | DOCX document | |
| CEP_L03-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 32 16_15.docx | DOCX document | |
| CEP_Fire_Pump_Test_Method Of Procedure 06-02-16.pdf | ||
| 016-7FX302.pdf | ||
| 36C25621R0026_1.docx | DOCX document | |
| VA PUMP 1 field test report.pdf | ||
| Section 00 11 21.docx | DOCX document | |
| General Decision LA 20200041 10-09-2020.pdf | ||
| EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf | ||
| 017-7FX501.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7-L1 100' - 0"
7-L2 122' - 8"
7-L3.5 152' - 8"
7-L3 140' - 0"
7-L4 157' - 0"
7-L4.5 178' - 8"
7-R2 199' - 2"
L4i - Concourse 168' - 8"
7-R1 187' - 8"
7-R3 212' - 4"
Street 92' - 0 29/32"
07 3 07 5
01B BASEMENT
88' - 0"
HOSE
VALVE
HOSE
VALVE
HOSE
VALVE
HOSE
VALVE
4"ø
4"ø
PRESSURE
GAUGE
2" DRAIN WITH
BALL VALVE
07 - B14 EL. 168'-8"
168' - 8"
4.5 78' - 8"
4"ø
DRAIN RISER
4" MAIN
7-L1 100' - 0"
7-L2 122' - 8"
7-L3.5 152' - 8"
7-L3 140' - 0"
7-L4 157' - 0"
7-L4.5 178' - 8"
7-R2 199' - 2"
L4i - Concourse 168' - 8"
7-R1 187' - 8"
7-R3 212' - 4"
Street 92' - 0 29/32"
07 A 07 J
07 H
01B BASEMENT
88' - 0"
HOSE VALVE
HOSE VALVE
HOSE VALVE
HOSE
VALVE
2" DRAIN WITH
BALL VALVE
4"ø
4"ø
4"ø
4"ø
PRESSURE
GAUGE
8" FIRE MAIN LOOP
SERVING
CONCOURSE
FLOW
SWITCH BUTTERFLY VALVE
WITH TAMPER
SWITCHCHECK
VALVE
HOSE
VALVE (2)
FLOW
SWITCH BUTTERFLY VALVE
WITH TAMPER SWITCH
CHECK
VALVE
PRESSURE
GAUGE
PRESSURE
GAUGE
BUTTERFLY VALVE
WITH TAMPER SWITCH
AUTOMATIC AIR VENT
07 - B14 EL. 168'-8"
168' - 8"
2" DRAIN
RISER
PRESSURE
GAUGE
FLOW
SWITCH
ALARMED
SHUT-OFF
VALVE
4" TO PUMP VAULT
7FX501
7-L1 100' - 0"
7-L2 122' - 8"
7-L3.5 152' - 8"
7-L3 140' - 0"
7-L4 157' - 0"
7-L4.5 178' - 8"
Street 92' - 0 29/32"
07 Z07 Y
BUTTERFLY VALVE WITH
TAMPER SWITCH (2)
FLOW
SWITCH (2)
BUTTERFLY VALVE
WITH TAMPER
SWITCH (2)
FLOW SWITCH (2)
BUTTERFLY VALVE WITH
TAMPER SWITCH
FLOW SWITCH
BUTTERFLY VALVE
WITH TAMPER SWITCH
FLOW SWITCH
HOSE
VALVE 2 1/2" DRAIN BETWEEN TOP
OF SLAB AND BTM OF
ARCHITECTURAL CURTAIN
WALL
PRESSURE
GAUGE (2)
2" DRAIN
4" SERVICE TO
SECOND LEVEL
2 1/2"ø
PROVIDE COVERAGE IN SPACE
BETWEEN SECOND FLOOR CEILING &
LEVEL 3.5
6"ø 2 1/2"ø
6"ø
4"ø
4"ø
6"ø
HOSE
VALVE
HOSE
VALVE
6" IN 10" PIPE
SLEEVE
HOSE
VALVE
PRESSURE
GAUGE
4"ø
MAINTAIN 1'-0"
MINIMUM CLEAR FROM
DOORWAY (TYPICAL)
4"
6"ø
CHECK
VALVE (2)
CHECK
VALVE
CHECK
VALVE
CHECK VALVE
07 - B14 EL. 168'-8"
168' - 8"
PIPE SLEEVE
(TYPICAL)
7-L1 100' - 0"
7-L2 122' - 8"
Street 92' - 0 29/32"
07 Y2
GATE VALVE WITH
TAMPER SWITCH
6"ø
6" FIRE MAIN
SERVICE TO
RESEARCH BUILDING
7-L1 100' - 0"
2 1/2"ø
2 1/2"ø4"ø
HOSE
VALVE
1 FLOOR
1' - 4"
Level 1 1' - 4 1/4"
7-L2 122' - 8"
07 7
PIPING UNDER
STRUCTURAL BEAM
AND MECHANICAL
DUCTWORK
6" FROM FIRE PUMP DISCHARGE
6" TEST MAIN BEYOND
6" TEST MAIN
7-L1 100' - 0"
7-L2 122' - 8"
7-L3.5 152' - 8"
7-L3 140' - 0"
7-L4 157' - 0"
HOSE VALVE
HOSE VALVE
HOSE VALVE
4"ø
4"ø
2 1/2"ø
7-L4 157' - 0"
7-L4.5 178' - 8"
L4i - Concourse 168' - 8"
7-R1 187' - 8"
07 3
4" FROM MAIN
AT LEVEL 4I
SPRINKLER
MAIN SERVING
LEVEL 4
BUTTERFLY
VALVE WITH
TAMPER SWITCH
FLOW
SWITCH
HOSE
VALVE
PRESSURE
GAUGE
2" DRAIN
07 - B14 EL. 168'-8"
168' - 8"
CHECK
VALVE
3/16" = 1'-0"3 EAST ELEVATION AT STAIR STN-3 HOSE VALVE RISER
DATE
LOCATION
CHECKED DRAWN
PROJECT TITLE PROJECT NUMBER
DOCUMENT SET PACKAGE
DRAWING NUMBERAPPROVED: PROJECT DIRECTOR
DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:
REVISIONS: DATE
B
A
D
C
E
VA FORM 08-6231
O N
E
EI
G H
T
IN
C H
O
N E
FO
O
T O
N E
Q U
AR
T E
R
IN
C H
O
N E
FO
O
T O
N E
H
AL
F I N
C H
O
N E
FO
O
T
TH
R
EE
Q U
A R
TE
R S
IN
C
H
O N
E
FO
O T
TH
R
EE
IN
C H
ES
O N
E
FO
O T
O N
E
IN
C H
F
O R
TY
F
EE
T
( 1
0'
6"
6"
0'
0'
123456
F
B
A
D
C
E
F
O N
E
SI
XT
EE
N
TH
IN
C
H
O N
E
FO
O T
O N
E
AN
D O
N E
H
AL
F
IN
C H
E S
O N
E
FO
O T
6"
BUILDING NUMBER
NEW ORLEANS, LOUISIANA
7FX301
SECTIONS AND DETAILS
CRS MJOctober 31, 2011
7629-HS2-401SLVHCS REPLACEMENT MEDICAL
CENTER PROJECT
SCHRENK & PETERSON / CIVIL
KORDA/NEMETH ENGINEERS / STRUCTURAL
BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE
ARCHITECURAL ENGINEERS / PLUMBING
SCALES & ASSOCIATES INC. / FIRE PROTECTION
COMMUNICATION DESIGN GROUP / LOW VOLTAGE
DESMAN ASSOCIATES / PARKING
CODE CONSULTANTS INC. / CODE CONSULTANT
THE SEXTANT GROUP / AV & ACOUSTICAL
PYBURN & ODOM / ABATEMENT
Department of Veterans Affairs
OFFICE OF
CONSTRUCTION
MANAGEMENTEWP_07
CONSTRUCTION DOCUMENTS 1
FULLY SPRINKLERED 3/16" = 1'-0"1 NORTH ELEVATION AT STAIR STN-3 HOSE VALVE RISER
3/16" = 1'-0"4 ELEVATION AT AUTOMAUTOMATIC SPRINKLER RISER
1/8" = 1'-0"6 SECTION AT UTILTY SERVICE PIT
1/4" = 1'-0"2 SECTION AT FIST FLOOR HOSE VALE
1/4" = 1'-0"7 SECTION AT FIRST FLOOR
3/16" = 1'-0"8 ELEVATION AT WEST HOSE VALVE RISER
1/4" = 1'-0"9 SECTION AT 4TH LEVEL
1 ADDENDUM 1 12/02/11
3 BULLETIN 007 7/20/12
RFI: 00411 -
Relocation of FP Valve Assembly
File details come from the government source that posted it. Updated .