Sprinkler - CEP - 3 Standpipes.pdf

PDF 5 MB Posted

Attached to
C1NZ--Design Build Project: 629-20-118 CFM - Redesign and Repair Fire and Jockey Pump Systems
Solicitation number
36C25621R0026
Issued by

View the file

Other files

File Type Posted
CEP_L01_ALL_FP_NS_FAB.pdf PDF
CEP_L02_ALL_FP_NS_FAB.pdf PDF
Section 01 33 23.docx DOCX document
CEP_L03_ALL_FP_NS_FAB.pdf PDF
CEP_L02_ALL_FP_NS_FAB.pdf PDF
CEP_ 3 Standpipes_Sprinkler.pdf PDF
VA PUMP 2 FIELD TEST REPORT.pdf PDF
CEP_L04-5_ALL_FP_NS_FAB.pdf PDF
Section 01 00 00.docx DOCX document
Section 01 35 26.docx DOCX document
CEP_L04_ALL_FP_NS_FAB.pdf PDF
CEP_L01_ALL_FP_NS_FAB.pdf PDF
4. VA Master Specs Table of Contents.docx DOCX document
CEP_L03-5_ALL_FP_NS_FAB.pdf PDF
Section 01 32 16_15.docx DOCX document
CEP_Fire_Pump_Test_Method Of Procedure 06-02-16.pdf PDF
015-7FX301.pdf PDF
016-7FX302.pdf PDF
36C25621R0026_1.docx DOCX document
VA PUMP 1 field test report.pdf PDF
Section 00 11 21.docx DOCX document
General Decision LA 20200041 10-09-2020.pdf PDF
EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf PDF
017-7FX501.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIfSTli,Ìvl .{CCl¿lYI ANCE tç25

CONTRACTOR'S MATEHIAL AND TEST CERTIFICATE FOR ABOVEGROUND PIPING

Standplpe System NFPA '14

PROCEDURE

Upon completion of work, inspection and tesls shall be made by lhe conlraclor's represenlal¡ve and w¡lnessed by an ovJneis represenlat¡ve.

All defecls shall be corrected and the system lell in serv¡ce before lhe contraclor's personnel f¡nally leave lhe job.

A cerl¡l¡cale shall be f¡lled oul and signed by bolh representatives. Cop¡es shall be prepared for approving aulhor¡ties, owners, and contraclor.

It ¡s underslood that lhe owner's represenlalive's signature in no v/ay prejud¡ces any claim againsl lhe conlraclor for faully malerial, poor v/orkmanship, or lailure lo comply wilh lhe approving authorily's requiremenls or local ordinances.

Property name SLVHCS REPLACEMENT MEDTCAL CENTER PROJECT, PROJECT LÊcACy, EWPOT- Dale 713112015

Properly address 2418 CANAL ST., NEW ORLEANS, LA 701 19

Accepled by approving aulhorilies (names) Department of Veteran Affairs

Address 'l 250 Poydras St. #200, Nevy Orleans, LA 701 1 3 lnstallalion conforms lo accepted plans?

Equipment used is approved or listed?

r:¡ Automalic dry

E¡ Aulomalic wel

U Semiaulomalic dry ü Manual dry rJ Manual wel

Waler Supply I Manufacturer Data ljsed tor I

Model 91 4 Ser¡es Model 1 2 FCM Vert¡cal Turbine

Deslgn and As I Type: rE Eteclric J Diesel

Shown on Plans I Rated gpm 1O0O gpm Raled, psi 145 psi Shutoff, psi

J Public walerv/orks system

-(gal)

¡t Storagelank 150{!Q lgat) D Gravity lank

(gal) -t Open reservo¡r_ (gal)

Have Copies I E system components instfuctions

't"ti:fl:1î:'lt | ts copy or acc"pred prans

El Care and mainlenance of system

El Hydraulic data,/calculalions

Main waterllow shutoff localion F¡rê Pumos Room 2N1125

Do all stânclpipe risers have base of r¡set shulofl valvos?

u Locked open :i Sealed and tagged E Tamperprool srv¡lch

€., 2013 National Fire Proteclion Associalion

Hose lhreads have been verlied for compliance wilh local fire

U Double check assemþly S¡ze

FIGUR-E ll.l.3(a) Saruple Co¡rtractor's Material arrcl Test Certificate for ft .,. "' l4-26 i Ns'r¡\rrr{TroN oF srAND pt pË AND HosE sysrËtvts

CONTROLVALVE DEVICE

Victualic lrip lhrough remote hose valve

Min

Sec

Min

Sec

Waler pressure Air pressure Time remole hose valve oullel Trip poinl air pressure Alarm operated XYes U No lf no, explain

Time water reached remole hosg valve

Hydraulic aclival¡on

Electric aclivalion

Pneumallc activation

Make and model ol activation dev¡ce

Each aclivation dev¡ce tested?

LJ Yes

U YES

rJ Yes device operated properly? ú Yes LJ No ll no, explain.

All hose valves on syslem operaled properly? E,J yes rJ No lf no, @2013 National Fire Prolection Assoc¡alion

U No lf no, explain.

PRESSURE-REGULATING DEVICE

NFPA 14(p.2ol3)

FIGURE lI.l.3(a) Contínucd

El ,0,...,,,on

SYSTU¡v!,{,CCUPTANCE l4-'27

All pip¡ng hydrostalically lesled at 200 psi (_ bar) lor 2 hrs Dry piping pneumal¡cally lested? rj Yes U No Equipmenl operates properly? ø yes rJ No

Reading of gauge located near wâter supply tesl connection 154 psi (_ bar)

Hydroslalic: Hydroslatic lesls shall be made at nol less lhan 200 ps¡ (1 3.6 ba4 for 2 hours or 50 psi (3.4 bâr) above stat¡c pressure ¡n excess of 1 50 psi (1 0,2 ba4 for 2 hours. Diflerential dry pipe valve clappers shall be left open during test lo prevenl damage. All aboveground piping leakage shall be stopped.

Pneumalic: Establish 40 ps¡ (2.7 bar) air pressure and measure drop, wh¡ch shall not exceed | lá psi (0.1 bar) ¡n 24 hours, Tesl pressure lanks al normal waler level and air pressure and measure air pressure drop, which shall nol exce€d 172 psi (0.1 ba4 in 24 hours.

ll no, slate reason.

Do you cerl¡fy as the standpipe conlraclor lhat addjlives and corrosive chemicals, sodium silicale, or derivalives of sodium silicale, brine, or other corros¡ve chemicals vJere nol used lor tesling syslems or slopping leaks?

Flow Test

Blank Testlng

Welding

Cutouls (Discs)

Hydraul¡c Dâta

Nameplate

Remarks

EYes JNo

Res¡dual pressure v/ilh valve in lest connection open wide 150

Underground mains and lead-in conneclions to syslem risers llushed before connection made lo standpipe p¡p¡ng

Verified by copy of the underground test lorm? El Yes ,J No U Olher (explain)

Flushed by inslaller of underground standp¡pe p¡p¡ng? El Yes ,¡ No

Flow water lrom the hydraulically mosl remote slandpipe oullet(s).

Record: Stalic pressure: !!Q¡gj Residual pressure: 105 psi Nozzle diameter: 25 in

P¡lot pressure:3o ps¡ Total flow:_jlqggjpL

Welded piping t¡ Yes fi No

Do you cerl¡fy as lhe standpipe conlraclor lhat weld¡ng procedures comply with lhe requ¡rements of at leasl AWS D10.9, Level AR-3?

Do you cerl¡ly lhat lhe welding was performed by welders qualified ¡n compliance with lhe requ¡remenls ot at leasl AWS D10.9, Level AR-3?

Do you certify that wslding was carried oul in compliance w¡th a documenled quality control N yes procedure to ensure that all discs are retrieved, thal openings in pip¡ng are smoolh, that slag and olher weld¡ng residue are removed, and thal lhe internal diameters o, piping are nol penetrated?

Do you csrtily lhal you have a contfol leatufe lo ensure that all cutouts (discs) are relfieved? r! Yes JNo

Nameplate prov¡ded? E Yes ú No rj lf no, explâin.

Dale lefl in service with all control valves open:

Name of conlractor

Address license number (if

Tille Date ü¡ Yes ü Yes 'J NO

!No

Name ol Sprinkler/ Slandp¡pe Contractot

System Operat¡ng Test Wilnessed by

Addítional Explanation and Notes

Property owner (Signed)

@ 2013 Nal¡onal F¡re Prolect¡on Associat¡on

Til le etgjeçL¡d_a nesel__ Tiile

Dâte 07/31/15

Date ïille Date

T¡lle Proiect Manaqer Date 07l3ll15

NFPA 14 (p.3 of 3)

FICURE ll.l.3(a) Contimrccl

['.n'' Çñ,rl Lrfi rs'r;N tr 144\ ¿ 20r3 Edition F

( l't *{) (iC 1-ii-r\

^ fr\'t'\{ ) ¡

STANDPIPE SYSTEM DESIGN SUMIAARY

SOURCE: TIRE PUMP

fI.OT{ AÌ TOP MOST OUII.ET

PRESSUNE @ IOP MOST OUTIEI

ftOVI TOR EA. ADDMONAT SIPE TOIAL w/ ADDIÍIoNAL ftow ELEV. @ HIGHEST OIfITEI

HOTE VATVE CONNECÍION

CLASS SERVICE

TOrAt ttow tEQulrED

IOIAI, PRESSURE REQUIRED

SAFãIY MARGIN

. l¿¡2.19 PSI

- 2.71 PSI

CAICUTAIIONS PER NTPA 14

, r:.ret c1¡tîr' {) li)',f rr

I PIAN NOTES:

:-VÃ[VEJIPãõ¡ÃmerErs &

FOT ÍIRE PUTA? THOWN ON FITE PUM?

PTAN. SEE SHEE T?.O,I fOT ¡IRE ?UMP

PTAN AND DEÍAIIS.,, 9\"'

, \oÔ t\ v

CENTRAI ENERGY PTANT ALr.lEvELs Nt & N2'STANDPTPE rsoMETRrc

L,-,.-Vffi.* Ä::

u-""*

D¡IITED CONC. ANCHOR

HANGER

¡lp¿cw¡ /

TONGITUDINAI. SWAY BRACING DEIAII

NO SCATE

J'".^ \çZ Crr l*P c*e J-3r -t I l-k1l\f l+ É \A4\G

¡oh

VA HOSP¡ÍAL _ CENTR.AL ENERGY PI.ANT

2,{r8 C^N^L ST

NEt ORLE^}IS. tA ?0119

NS/Cherokee Veútures, LLC

LLVYLS ñt¡Nt t ñ2 - îlþ¡tÈ\ft lfll\VIr( s.c.R. # 0t l9 o014&D.Þ¡ þb!

Ldd@!¡óñhkbd.

2.&l..FlFÉñbbMbdÞÉÈld s,ûþdhñbùl@Fm¡rß' a.f Dbbu!MdtI Fr

Cont¡útoû

NS/CHEROKEE VENTURES, LT¡

{s18-2 L HOI^RD t NE, STE 400

AUSTIN, TE)(ÀS 7O?28

File details come from the government source that posted it. Updated .