CEP_ 3 Standpipes_Sprinkler.pdf
PDF 4 MB Posted
- Attached to
- C1NZ--Design Build Project: 629-20-118 CFM - Redesign and Repair Fire and Jockey Pump Systems
- Solicitation number
- 36C25621R0026
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sprinkler - CEP - 3 Standpipes.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| Section 01 33 23.docx | DOCX document | |
| CEP_L03_ALL_FP_NS_FAB.pdf | ||
| CEP_L02_ALL_FP_NS_FAB.pdf | ||
| VA PUMP 2 FIELD TEST REPORT.pdf | ||
| CEP_L04-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 00 00.docx | DOCX document | |
| Section 01 35 26.docx | DOCX document | |
| CEP_L04_ALL_FP_NS_FAB.pdf | ||
| CEP_L01_ALL_FP_NS_FAB.pdf | ||
| 4. VA Master Specs Table of Contents.docx | DOCX document | |
| CEP_L03-5_ALL_FP_NS_FAB.pdf | ||
| Section 01 32 16_15.docx | DOCX document | |
| CEP_Fire_Pump_Test_Method Of Procedure 06-02-16.pdf | ||
| 015-7FX301.pdf | ||
| 016-7FX302.pdf | ||
| 36C25621R0026_1.docx | DOCX document | |
| VA PUMP 1 field test report.pdf | ||
| Section 00 11 21.docx | DOCX document | |
| General Decision LA 20200041 10-09-2020.pdf | ||
| EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf | ||
| 017-7FX501.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYSTU¡v!,{,CCUPTANCE l4-'27
All pip¡ng hydrostalically lesled at 200 psi (_ bar) lor 2 hrs Dry piping pneumal¡cally lested? rj Yes U No Equipmenl operates properly? ø yes rJ No
Reading of gauge located near wâter supply tesl connection 154 psi (_ bar)
Hydroslalic: Hydroslatic lesls shall be made at nol less lhan 200 ps¡ (1 3.6 ba4 for 2 hours or 50 psi (3.4 bâr) above stat¡c pressure ¡n excess of 1 50 psi (1 0,2 ba4 for 2 hours. Diflerential dry pipe valve clappers shall be left open during test lo prevenl damage. All aboveground piping leakage shall be stopped.
Pneumalic: Establish 40 ps¡ (2.7 bar) air pressure and measure drop, wh¡ch shall not exceed | lá psi (0.1 bar) ¡n 24 hours, Tesl pressure lanks al normal waler level and air pressure and measure air pressure drop, which shall nol exce€d 172 psi (0.1 ba4 in 24 hours.
ll no, slate reason.
Do you cerl¡fy as the standpipe conlraclor lhat addjlives and corrosive chemicals, sodium silicale, or derivalives of sodium silicale, brine, or other corros¡ve chemicals vJere nol used lor tesling syslems or slopping leaks?
Flow Test
Blank Testlng
Welding
Cutouls (Discs)
Hydraul¡c Dâta
Nameplate
Remarks
EYes JNo
Res¡dual pressure v/ilh valve in lest connection open wide 150
Underground mains and lead-in conneclions to syslem risers llushed before connection made lo standpipe p¡p¡ng
Verified by copy of the underground test lorm? El Yes ,J No U Olher (explain)
Flushed by inslaller of underground standp¡pe p¡p¡ng? El Yes ,¡ No
Flow water lrom the hydraulically mosl remote slandpipe oullet(s).
Record: Stalic pressure: !!Q¡gj Residual pressure: 105 psi Nozzle diameter: 25 in
P¡lot pressure:3o ps¡ Total flow:_jlqggjpL
Welded piping t¡ Yes fi No
Do you cerl¡fy as lhe standpipe conlraclor lhat weld¡ng procedures comply with lhe requ¡rements of at leasl AWS D10.9, Level AR-3?
Do you cerl¡ly lhat lhe welding was performed by welders qualified ¡n compliance with lhe requ¡remenls ot at leasl AWS D10.9, Level AR-3?
Do you certify that wslding was carried oul in compliance w¡th a documenled quality control N yes procedure to ensure that all discs are retrieved, thal openings in pip¡ng are smoolh, that slag and olher weld¡ng residue are removed, and thal lhe internal diameters o, piping are nol penetrated?
Do you csrtily lhal you have a contfol leatufe lo ensure that all cutouts (discs) are relfieved? r! Yes JNo
Nameplate prov¡ded? E Yes ú No rj lf no, explâin.
Dale lefl in service with all control valves open:
Name of conlractor
Address license number (if
Tille Date ü¡ Yes ü Yes 'J NO
!No
Name ol Sprinkler/ Slandp¡pe Contractot
System Operat¡ng Test Wilnessed by
Addítional Explanation and Notes
Property owner (Signed)
@ 2013 Nal¡onal F¡re Prolect¡on Associat¡on
Til le etgjeçL¡d_a nesel__ Tiile
Dâte 07/31/15
Date ïille Date
T¡lle Proiect Manaqer Date 07l3ll15
NFPA 14 (p.3 of 3)
FICURE ll.l.3(a) Contimrccl
['.n'' Çñ,rl Lrfi rs'r;N tr 144\ ¿ 20r3 Edition F
( l't *{) (iC 1-ii-r\
^ fr\'t'\{ ) ¡
STANDPIPE SYSTEM DESIGN SUMIAARY
SOURCE: TIRE PUMP
fI.OT{ AÌ TOP MOST OUII.ET
PRESSUNE @ IOP MOST OUTIEI
ftOVI TOR EA. ADDMONAT SIPE TOIAL w/ ADDIÍIoNAL ftow ELEV. @ HIGHEST OIfITEI
HOTE VATVE CONNECÍION
CLASS SERVICE
TOrAt ttow tEQulrED
IOIAI, PRESSURE REQUIRED
SAFãIY MARGIN
. l¿¡2.19 PSI
- 2.71 PSI
CAICUTAIIONS PER NTPA 14
, r:.ret c1¡tîr' {) li)',f rr
I PIAN NOTES:
:-VÃ[VEJIPãõ¡ÃmerErs &
FOT ÍIRE PUTA? THOWN ON FITE PUM?
PTAN. SEE SHEE T?.O,I fOT ¡IRE ?UMP
PTAN AND DEÍAIIS.,, 9\"'
, \oÔ t\ v
CENTRAI ENERGY PTANT ALr.lEvELs Nt & N2'STANDPTPE rsoMETRrc
L,-,.-Vffi.* Ä::
u-""*
D¡IITED CONC. ANCHOR
HANGER
¡lp¿cw¡ /
TONGITUDINAI. SWAY BRACING DEIAII
NO SCATE
J'".^ \çZ Crr l*P c*e J-3r -t I l-k1l\f l+ É \A4\G
¡oh
VA HOSP¡ÍAL _ CENTR.AL ENERGY PI.ANT
2,{r8 C^N^L ST
NEt ORLE^}IS. tA ?0119
NS/Cherokee Veútures, LLC
LLVYLS ñt¡Nt t ñ2 - îlþ¡tÈ\ft lfll\VIr( s.c.R. # 0t l9 o014&D.Þ¡ þb!
Ldd@!¡óñhkbd.
2.&l..FlFÉñbbMbdÞÉÈld s,ûþdhñbùl@Fm¡rß' a.f Dbbu!MdtI Fr
Cont¡útoû
NS/CHEROKEE VENTURES, LT¡
{s18-2 L HOI^RD t NE, STE 400
AUSTIN, TE)(ÀS 7O?28
File details come from the government source that posted it. Updated .