VA_BSP Data Center Bid Resubmission - Drawings.pdf
PDF 20 MB Posted
- Solicitation number
- 36C77626B0001
About this file
This document is a comprehensive set of architectural and engineering drawings for the VA Big Spring Data Center renovation project, located at the West Texas VA Health Care System in Big Spring, Texas. The project involves a multi-phase renovation of Building 1, focusing on converting Room 96 into a new data center with critical infrastructure upgrades including electrical, mechanical, telecommunications, and fire protection systems.
Key technical details include installing two 100 KVA uninterruptible power supplies, new cable trays, redundant telecommunications service entry, a clean agent fire suppression system for the 12,600 cubic foot data center, and new CRAC (Computer Room Air Conditioning) units with redundant configurations. The renovation includes modifying existing electrical, mechanical, and telecommunications systems to support the new data center, with specific attention to grounding, power distribution, cable routing, and environmental control. The project is scheduled for completion by July 18, 2025, and involves careful phasing to minimize disruption to the existing VA facility operations.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
HUITT - ZOLLARS
500 WEST 7TH ST. STE 700
FORT WORTH, TX 76102
817-335-3000
CONSULTANT:
ECS SOUTHWEST
3033 KELLWAY DR. #100
CARROLTON, TX 75006
281-814-2502
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
CONSULTANT:
OCMI, INC.
6110 EXECUTIVE BLVD.
STE 440
ROCKVILLE, MD 20852
202-450-3843
07/18/2025
519-23-908
JSKJ
VA BIG SPRING DATA CENTER
BID RESUBMISSION
COVER SHEET
GI100
-2
-9
G I1
.p d f
Department of Veterans Affairs
VA BIG SPRING DATA CENTER
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
BID RESUBMISSION
LOCATION MAP DRAWING LIST PROJECT DIRECTORY
Medical Center Director
Director of Facility Management Service
Medical Director
Project COR
Project CO
Infection Control
Safety Officer
CONTRACTING OFFICER REPRESENTATIVE (COR)
Eric Landrum
West Texas VA Health Care System 300 Veterans Blvd.
Big Spring, TX 79720
PHONE: (432) 816-8840
eric.landrum@va.gov
ARCHITECT
Demiko Richardson
CB DESIGN GROUP, INC
421 King St. Suite 301 Alexandria, VA. 22314
PHONE: (888) 585-CBDG (2234)
drichardson@cbdg-ae.com
MEP/FP/STRUCTURAL ENGINEER
Nicholas Young
HUITT-ZOLLARS
500 West 7th Street, Suite 300 Fort Worth, TX 76102
PHONE: (817) 269-2394
nyoung@huitt-zollars.com
CONTRACTING OFFICER (CO)
Rhonda M. Richardson
Department of Veterans Affairs | Contracting Network Contract Office 17 (NC017) 1901 Veterans Memorial Drive, Building 171 Temple, TX 76504
PHONE: (254) 899-6011
rhinda.richardson5@va.gov
APPROVALS
GENERAL INFORMATION
GI100 COVER SHEET
GI200 SYMBOLS, ABBREVIATIONS & NOTES
GI300 GENERAL NOTES
GENERAL CONTRACT
GC201 BUILDING 1 - 1ST FLOOR - EXISTING OVERALL FLOOR PLAN
GC201a BUILDING 1 - 1ST FLOOR - ENLARGED PHASING PLAN
GC202 BUILDING 1 - 2ND FLOOR AND LOWER ROOF - PARTIAL EXISTING PLAN
GC400 ICRA PLAN
GC400a ICRA PLAN - PHASE 1
GC400b ICRA PLAN - PHASE 2
STRUCTURAL
S-101 BUILDING 1 - FLOOR PLANS AND DETAILS
ARCHITECTURAL DEMOLITION
AD101 BUILDING 1 - 1ST FLOOR - DEMOLITION PLAN
AD101a BUILDING 1 - 1ST FLOOR - ENLARGED DEMO WORK PHASING PLAN
AD101b BUILDING 1 - 1ST FLOOR - ENLARGED DEMO WORK PLAN - PHASE 1
AD101c BUILDING 1 - 1ST FLOOR - ENLARGED DEMO WORK PLAN - PHASE 2
AD102 BUILDING 1 - 2ND FLOOR AND LOWER ROOF - DEMOLITION PLAN
AD102a BUILDING 1 - LOWER ROOF - ENLARGED DEMO WORK PLAN
AD701 BUILDING 1 - 1ST FLOOR - OVERALL RCP DEMOLITION PLAN
AD701a BUILDING 1 - 1ST FLOOR - ENLARGED RCP - DEMO WORK PHASING PLAN
AD701b BUILDING 1 - 1ST FLOOR - ENLARGED RCP - DEMO WORK PLAN - PHASE 1
AD701c BUILDING 1 - 1ST FLOOR - ENLARGED RCP - DEMO WORK PLAN - PHASE 2
ARCHITECTURAL ELEMENTS
AE101 BUILDING 1 - 1ST FLOOR - OVERALL NEW WORK PLAN
AE101a BUILDING 1 - 1ST FLOOR - ENLARGED NEW WORK PHASING PLAN
AE101b BUILDING 1 - 1ST FLOOR - ENLARGED NEW WORK PLAN - PHASE 1
AE101c BUILDING 1 - 1ST FLOOR - ENLARGED NEW WORK PLAN - PHASE 2
AE102 BUILDING 1 - 2ND FLOOR AND LOWER ROOF - NEW WORK PLAN
AE102a BUILDING 1 - LOWER ROOF - NEW WORK PLAN
AE300 DOOR SCHEDULE, FINISH SCHEDULE, & DETAILS
AE301 WALL TYPES
AE400 WALL SECTIONS AND DETAILS
AE701 BUILDING 1 - 1ST FLOOR - OVERALL RCP NEW WORK PLAN
AE701a BUILDING 1 - 1ST FLOOR - ENLARGED RCP - NEW WORK PHASING PLAN
AE701b BUILDING 1 - 1ST FLOOR - ENLARGED RCP - NEW WORK PLAN - PHASE 1
AE701c BUILDING 1 - 1ST FLOOR - ENLARGED RCP - NEW WORK PLAN - PHASE 2
AE800 SIGN TYPES
MECHANICAL
M-001 GENERAL NOTES AND STANDARDS
M-002 ABBREVIATIONS AND SYMBOLS
M-010 BUILDING 1 - 1ST FLOOR - OVERALL FLOOR PLAN
MD-101 BUILDING 1 - 1ST FLOOR - DEMOLITION PLAN
MD-102 BUILDING 1 - LOWER ROOF - DEMOLITION PLAN
M-101 BUILDING 1 - 1ST FLOOR - NEW WORK PLAN
M-102 BUILDING 1 - LOWER ROOF - NEW WORK PLAN
M-501 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-701 HVAC CONTROLS
M-702 HVAC CONTROLS
PLUMBING
P-001 PLUMBING GENERAL NOTES
P-010 BUILDING 1 - 1ST FLOOR - OVERALL FLOOR PLAN
PD-101 BUILDING 1 - 1ST FLOOR - DEMOLITION PLAN
P-101 BUILDING 1 - 1ST FLOOR - NEW WORK PLAN
P-501 PLUMBING DETAILS
ELECTRICAL
E-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
E-010 ELECTRICAL SITE PLAN
ED-100 BUILDING 1 - 1ST FLOOR - ENLARGED DEMOLITION PLAN - ELECTRICAL
E-100 BUILDING 1 - OVERALL BASEMENT - ELECTRICAL PLAN
E-101 BUILDING 1 - BASEMENT ENLARGED PLANS - ELECTRICAL
E-200 BUILDING 1 - 1ST FLOOR - OVERALL ELECTRICAL PLAN
E-201 BUILDING 1 - 1ST FLOOR - ENLARGED PLAN - LIGHTING
E-202 BUILDING 1 - 1ST FLOOR - ENLARGED PLAN - POWER
E-203 BUILDING 1 - 1ST FLOOR - ENLARGED PLAN - CABLE TRAY AND GROUNDING
E-500 ELECTRICAL DETAILS
E-501 ELECTRICAL DETAILS
ED-600 ONE-LINE DIAGRAMS - DEMOLITION
E-600 ONE-LINE DIAGRAMS- NEW WORK
E-601 GROUNDING DIAGRAM
E-700 PANEL SCHEDULES
TELECOM
T-001 TELECOMMUNICATIONS SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
T-010 TELECOMMUNICATIONS SITE PLAN
T-100 BUILDING 1 - 1ST FLOOR - OVERALL TELECOMMUNICATIONS PLAN
TD-101 BUILDING 1 - 1ST FLOOR - ENLARGED DEMOLITION PLAN - TELECOMMUNICATIONS
T-101 BUILDING 1 - 1ST FLOOR - ENLARGED PLAN - TELECOMMUNICATIONS
T-500 TELECOMMUNICATIONS DETAILS
T-501 TELECOMMUNICATIONS DETAILS
T-600 TELECOMMUNICATIONS RISER DIAGRAM
T-700 TELECOMMUNICATIONS SCHEDULES
FIRE PROTECTION
F-001 FIRE PROTECTION NOTES, LEGENDS
FD-101 BUILDING 1 - 1ST FLOOR - DEMOLITION PLAN
F-101 BUILDING 1 - 1ST FLOOR - NEW WORK FIRE PROTECTION PLAN
WOOD
ALUMINUM
STEEL
EARTH
CONCRETE MASONRY UNITS
RIGID INSULATION
CONCRETE
EXISTING CONSTRUCTION
TO REMAIN
EXISTING CONSTRUCTION
TO BE REMOVED
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM - PLASTER
ACOUSTIC TILE
CAST STONE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
CERAMIC TILE
CARPET
GRAVEL
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATIOR
DIMENSION LINE
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
SECTION INDICATOR
TYPICAL DETAIL INDICATOR
COLUMN GRID
KEYNOTE
NORTH ARROW
A
DETAIL NUMBER
SHEET WHERE
DRAWN
XXxxx
XXxxx
X
DRAWING TITLE
SCALE: 1 1/2" = 1'-0"
1 1/2"
XXxxx
XXxxx
XXxxx
REVISION
REVISION CLOUD
NORTH
BREAK LINE
DEMOLITION KEYNOTE
A
XXxxx
D
BC
COLUMN NUMBER
COLUMN LETTER
XXxxx
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
SHEET WHERE
DRAWN
ELEVATION NUMBER
NEW DOOR TAG OPENING
FURNITURE, FIXTURE, & EQUIPMENT TAG
WALL/PARTITION TAG
x'-x" VERTICAL HEIGHT INDICATOR
ROOM NAME
3333333333
A3
ROOM NUMBER
ROOM AREA
PROGRAM AREA
D1
NOTES
1. ALL ABBREVIATIONS SHOWN MAY NOT BE USED ON THIS PROJECT.
2. CERTAIN COMMON ABBREVIATIONS MAY NOT BE SHOWN.
3. TEXT IN BOLD DENOTES ABBREVIATIONS FROM THE TIL.
L
M MORTAR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MB MARBLE
MC MULTI-COLOR COATING
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
MTL METAL
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NF NATURAL FINISH
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND, OVERHEAD
OPNG OPENING
OPP OPPOSITE
OZ OUNCE
P PAINT
PAV PAVING
PC PRECAST CONCRETE
PCT PORTLAND CEMENT TERRAZZO
PFW POLYPROPYLENE FABRIC
WALLCOVERING
PL PLATE, PLASTER
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PMF PREMOLDED FILLER, PERFORATED
METAL FACING (TILE OR PANELS)
PPT PORCELAIN PAVER TILE
PR PAIR
PT POINT
PTN PARTITION
PVT PAVER TILE
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER BASE
RCP REFLECTED CEILING PLAN,
RADIANT CEILING PANEL SYSTEM
RD ROOF DRAIN
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RL ROOF LEADER
RM ROOM
RO ROUGH OPENING
RST RESILIENT STAIR TREAD
RT RUBBER TILE FLOORING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE, HIGH GLAZED
COATING, STRUCTURAL CLAY
SCHED SCHEDULE
SCT FACING TILE
SDG SUSPENSION DECORATIVE GRIDS
SECT SECTION
SF SQUARE FEET, STONE FLOORING
SFTU GLAZED STRUCTURAL FACING TILE
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SLG SPANDREL GLASS
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
SS STAINLESS STEEL
ST STAIN
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
FA FIRE ALARM
FB FACE BRICK
FC FLUOROCARBON
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FG FOOT GRILLE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FM FLOOR MATS & FRAMES
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FP FOLDING PANEL PARTITION
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE, FEATURE STRIPS
FT FOOT OR FEET, FLOOR TILE
MOSAIC
FTCT CERAMIC MOSAIC TILE
FTG FOOTING
FUR FURRING
FUT FUTURE
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GCMU GLAZED FACE CMU
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GT GRANITE
GUMU GLASS MASONRY UNIT
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWD HARDWOOD
HDWR HARDWARE
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HPDL PLASTIC LAMINATE
HR HANDRAIL, HOUR
HSPL HIGH STRENGTH PLASTER
HT HEIGHT
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INCLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KC PLASTER KEENE CEMENT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LG LONG
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LL LEAD LINED
LLV LONG LEG VERTICAL
LM LATEX MASTIC FLOORING
LMC LINEAR METAL CEILING
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
LWC LINEAR WOOD CEILING
& AND
@ AT
C CENTERLINE
# NUMBER, POUND
AA ANODIZED ALUMINUM, NATURAL
FINISH
AAC ANODIZED ALUMINUM, COLORED
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUSTABLE
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFP ACCORDION FOLDING PARTITION
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALUM ALUMINUM
AMP ACOUSTICAL METAL PLAN CEILING
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AT ACOUSTICAL CEILING TILE
AT (SP) ACOUSTICAL CEILING, SPECIAL
FACED
AUTO AUTOMATIC
AVG AVERAGE
AWF ACOUSTICAL WALLCOVERING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL TREATMENT
BD BOARD
BE BAKED ON ENAMEL
BEL BELOW
BF BRICK FLOORING
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BP BRICK PAVING
BR BUMPER RAIL, BRICK FACE
BRG BEARING
BRK BRICK
C, CONC CONCRETE
CAB CABINET
CAF CARPET ATHLETIC FLOORING
CB CATCH BASIN
CCT CUBICLE CURTAIN TRACK
CEM CEMENT
CG CORNER GUARD
CGFB CERAMIC GLAZED FACING BRICK
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CLOSET
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONF CONFERENCE
CONT CONTINUOUS
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CARPET
CPT CARPET MODULE TILE
CT CERAMIC TILE
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DS MB DIVIDER STRIPS, MARBLE
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST, EXISTING
EA EXHAUST AIR, EACH
EC EPOXY COATING
EFS EXTERIOR FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
ERF EPOXY RESIN FLOORING
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXIST EXISTING
EXP EXPANSION, EXPOSED DIVIDER
STRIPS
EXT EXTERIOR
T TREAD
T&G TONGUE AND GROOVE
TEL TELEPHONE
TEMP TEMPERED
TGC TEXTURED GYPSUM CEILING
PANEL
THK THICK
TIL TECHNICAL INFORMATION
LIBRARY (VA)
TMC TEXTURED METAL CEILING
PANEL
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TST THIN SET TERRAZZO
TT TERRAZZO TILE
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE NOTED
VB VAPOR BARRIER, VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VP VENEER PLASTER
VSF VINYL SHEET FLOORING
VTR VENT THRU ROOF
W WEST, VINYL COATED FABRIC
WALLCOVERING
W/ WITH
WB WALL BORDER
WD WOOD
WF FABRIC WALLCOVERING
W/O WITHOUT
WP WATERPROOF
WSF VINYL SHEET FLOORING
(WELDED SEAMS)
WT WEIGHT
WWF WELDED WIRE FRAME
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
HUITT - ZOLLARS
500 WEST 7TH ST. STE 700
FORT WORTH, TX 76102
817-335-3000
CONSULTANT:
ECS SOUTHWEST
3033 KELLWAY DR. #100
CARROLTON, TX 75006
281-814-2502
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
CONSULTANT:
OCMI, INC.
6110 EXECUTIVE BLVD.
STE 440
ROCKVILLE, MD 20852
202-450-3843
07/18/2025
519-23-908
JSKJ
VA BIG SPRING DATA CENTER
BID RESUBMISSION
SYMBOLS, ABBREVIATIONS & NOTES
GI200
-2
-9
G I2
.p d f
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
SYMBOLS OF MATERIALS DRAWING SYMBOLS ARCHITECTURAL ABBREVIATIONS
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING
SHARPS CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE START OF THE
PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF
IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS
IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA HEALTH CARE FACILITIES AND PROPERTY
ASSIGNED TO VHA THAT IS UNDER THE CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO
CIGARETTES, CIGARS, PIPES OR ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT
LIMITED TO ELECTRONIC OR E-CIGARETTES, VAPE PENS OR E-CIGARS.
UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE FOR
PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND VENDORS EFFECTIVE OCTOBER 1,
2019.
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. VA MASTER SPECIFICATIONS
10. VA SUSTAINABLE DESIGN MANUAL
NOTE: SEE LIFE SAFETY DRAWINGS FOR SPECIFIC EDITIONS OF APPLICABLE CODES
1. ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR CONDITIONS
ON THE JOB.
2. SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE SHOULD
BE DIRECTED TO THE CONTRACTING OFFICER DURING THE BID PERIOD.
3. ALL CONSTRUCTION IS TO BE NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
4. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR NOTES PERTAINING TO THEIR PARTICULAR DISCIPLINES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE CONTRACTING OFFICER ANY PERCEIVED DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS.
5. CONTRACTOR SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK
SOLE AS TO AVOID CONFLICTS IN THE FIELD.
6. ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTES SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR FUNCTION
ELSEWHERE IN THE BUILDING.
7. WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND OTHER SIMILAR ITEMS.
8. ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVERS, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS IN ACCORDANCE WITH A UL LISTED ASSEMBLY. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE
WATERPROOF SEALED.
9. FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL".
CONTRACTORS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER INSTALLATION OF
THE NEW WORK.
10. SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
11. IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO
SEEK CLARIFICATION OF ANY PERCEIVED DISCREPANCY DURING BID PHASE.
12. WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
13. IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT CONTRACTING OFFICER . DO NOT SCALE DRAWINGS. ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
14. EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OBTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
15. AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
16. CONSULT HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT OR
ANCHORING. IN COORDINATION WITH SHOP DRAWINGS.
17. ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. WALL MOUNTED ITEMS ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY EQUIPMENT
OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
18. ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE CONTRACTING OFFICER OF ANY PERCEIVED DISCREPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE
OF DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.
19. ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
20. SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
21. CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEDULE. EACH SUBCONTRACTOR SHALL COORDINATE WITH THE GENERAL CONTRACTOR PRIOR TO BEGINNING THEIR PORTION OF THE WORK.
ALL SUBMITTAL ARE TO BE APPROVED BY THE VA PRIOR TO START OF WORK.
22. CONTRACTOR SHALL, AT ALL TIMES, MAINTAIN THE INTEGRITY OF EXISTING SMOKE PARTITION WALLS, SMOKE BARRIER WALLS, AND FIRE RATED WALLS TO REMAIN. SEE LIFE SAFETY DRAWINGS AND ARCHITECTURAL DRAWINGS FOR THE LOCATION OF THESE WALLS. CONSULT COR AND LOCAL VA FIRE / SAFETY PERSONNEL FOR CONFIRMATION OF THESE WALLS PRIOR TO BEGINNING DEMOLITION. DAMAGE TO ANY EXISTING-TO-REMAIN SMOKE PARTITION WALLS, SMOKE BARRIER WALLS, OR FIRE RATED WALLS, INCLUDING DAMAGE FROM REMOVAL OF INTERSECTING WALLS, SHALL BE REPAIRED AT CONTRACTOR’S
EXPENSE.
23. PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS. STORAGE WILL ONLY BE PERMITTED IN THE ENCLOSED CONSTRUCTION SITE, AND DESIGNATED SPACE WITH PRIOR APPROVAL OF THE VA.
24. PATCH ALL EXISTING AND NEW HOLES IN FLOORS, WALLS AND CEILINGS WITHIN THE PROJECT LIMITS. ENSURE THAT ALL EXISTING AND NEW PATCH WORK IS RATED TO THE LEVEL OF FLOORS, WALLS AND CEILINGS TO THE REQUIRED EXISTING CONDITION, PRIOR TO THE START OF NEW WORK.
25. UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC". IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP DRAWINGS IN DIAGRAMMATIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE / DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
26. ALTHOUGH THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY, SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. ANY DISCREPANCIES BETWEEN THE CONTRACT DRAWINGS AND/OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION PRIOR TO SUBMITTING A BID AMOUNT IF THERE SHOULD APPEAR TO BE A DISCREPANCY BETWEEN DRAWINGS AND/OR THE SPECIFICATIONS. OTHERWISE, THE MOST STRINGENT (TYPICALLY THE MOST EXPENSIVE) REQUIREMENT SHALL APPLY AT THE DISCRETION OF THE COR AT NO ADDITIONAL COST TO THE GOVERNMENT.
27. ABOVE-CEILING COORDINATION – PRIOR TO PERFORMING ANY ABOVE-CEILING WORK, CONTRACTOR, WORKING WITH ALL SUB-CONTRACTORS, SHALL CREATE DRAWINGS THAT SHOW COORDINATION OF ALL ABOVE-CEILING WORK ITEMS WITH EXISTING CONDITIONS AND PROPOSED CEILINGS. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE SEQUENCES OF INSTALLATION TO ENSURE THAT ABOVE-CEILING ITEMS CAN FIT ABOVE THE CEILING HEIGHTS INDICATED ON THE REFLECTED CEILING PLAN(S). CONTRACTOR SHALL BRING ALL PERCEIVED CONFLICTS TO THE ATTENTION OF THE ARCHITECT / ENGINEER FOR RESOLUTION PRIOR TO THE START OF THE WORK. CONFLICTS RESULTING FROM INACCURATE COORDINATION DRAWINGS AND / OR FAILURE TO IDENTIFY CONFLICTS PRIOR TO INSTALLATION OF THE WORK SHALL BE CORRECTED / ADJUSTED AT THE CONTRACTOR’S EXPENSE AND
SHALL RESULT IN NO ADDITIONAL COST TO THE GOVERNMENT.
28. PRIOR TO BEGINNING PRODUCT-RELATED SUBMITTALS, THE CONTRACTOR SHALL PROVIDE A SUBMITTAL SCHEDULE THAT LISTS ALL PRODUCT-RELATED SUBMITTALS ANTICIPATED FOR THIS PROJECT. THE SUBMITTAL SCHEDULE SHALL INCLUDE SPECIFICATION SECTION, SUBMITTAL NAME, ANTICIPATED DATE TO BE ISSUED, AND ANTICIPATED DUE DATE. PRIORITIZE SUBMITTALS SO THAT CRITICAL PATH SUBMITTALS ARE SUBMITTED FIRST. SCHEDULE SUBMITTALS TO AVOID MORE THAN FIVE (5) SUBMITTALS BEING DUE IN THE SAME FIVE (5) BUSINESS DAY TIME-PERIOD. FAILURE TO SUBMIT REQUIRED SUBMITTAL SCHEDULE WILL RESULT IN EXCESSIVE SUBMITTALS BEING REJECTED WITHOUT REVIEW OR WILL RELIEVE THE GOVERNMENT OF LIABILITY FOR DELAYED SUBMITTAL REVIEWS. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS FOR SUBMITTALS AND CONSTRUCTION SCHEDULE.
THE CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS INCLUDING FLOOR TO FLOOR HEIGHTS, FLOOR TO CEILING HEIGHTS, SPOT ELEVATIONS PRIOR TO PROCEEDING WITH WORK. ANY
DISCREPANCIES OR CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO THE RESIDENT
ENGINEER'S ATTENTION FOR CLARIFICATION.
THE CONTRACTOR SHALL KEEP AND MAINTAIN TWO COMPLETE AND UPDATED SET OF
CONSTRUCTION DRAWINGS AND SPECIFICATIONS AT THE CONSTRUCTION SITE THROUGH THE
DURATION OF CONSTRUCTION FOR REVIEW AND REFERENCE BY THE RESIDENT ENGINEER AND
ARCHITECT. THIS SHALL INCLUDE ALL DOCUMENTS WITH CHANGES, MODIFY OR REVISED THE
SCOPE OF WORK AND / OR THE COST OF THE PROJECT. REFER TO SPECIFICATION SECTION 01
00 00, 1.12 "AS BUILT DRAWINGS".
THE TERM "PROVIDE" AS USED IN THESE CONTRACT DOCUMENTS MEANS ALL WORK TO BE
ACCOMPLISHED BY THE CONTRACTOR TO INCLUDE FURNISHING, INSTALLING, MODIFYING, AND
CONNECTING ALL SPECIFIED ITEMS IN ACCORDANCE WITH PLANS AND SPECIFICATIONS.
IN ORDER TO PROVIDE AN APPROPRIATE BLAST RESISTANT DESIGN IN ACCORDANCE WITH THE
VA PHYSICAL SECURITY DESIGN MANUAL, THE CONTRACTOR, SUBCONTRACTORS, AND
VENDORS MAY REQUIRE THE BLAST PRESSURES AND IMPULSES VALUES CALCULATED BY THE
A/E TEAM'S STRUCTURAL BLAST ENGINEER. THE CONTRACTOR, SUBCONTRACTOR, AND
VENDORS CAN SUBMIT A REQUEST TO THE VA CFM THROUGH THE VA COR. IF THE REQUEST IS
APPROVED, THE VA WILL DIRECT THE A/E TEAM STRUCTURAL BLAST ENGINEER TO PROVIDE
THE COMPUTER PRESSURE AND IMPULSE (WHICH ARE BASED ON THE SPECIFIC CONDITIONS
OF THE PROJECT SUCH AS STANDOFF DISTANCE, BUILDING GEOMETRY, OR OTHER FACTORS)
TO THE VENDOR. WITHOUT THE COMPUTED VALUES, THE PRESSURE AND IMPULSE VALUES IN
THE DATA DEFINITIONS DOCUMENT ALONE ARE NOT SUFFICIENT TO PROVIDE A COMPLIANT
DESIGN.
1. THESE PLANS DEPICT AREAS WHERE MATERIAL SAMPLES SHOWED THE PRESENCE OF ASBESTOS CONTAINING MATERIALS AND / OR LEAD-BASED PAINT. THESE PLANS ARE ONLY REPRESENTATIVE OF A LIMITED NUMBER OF SAMPLES AND SHALL
NOT BE ASSUMED TO BE THE ONLY LOCATIONS OF THESE MATERIALS.
2. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT CONTAIN LEAD-BASED
PAINT (LBP):
2.1. OFF-WHITE PLASTER WALLS
2.2. WHITE METAL RADIATOR COVERS
2.3. CERAMIC TILE WALLS AND FLOORS
2.4. OFF-WHITE METAL DOOR FRAMES
2.5. BROWN PLASTER BASEBOARD
2.6. RED PLASTER FIRE CABINETS
2.7. OFF-WHITE METAL / PLASTER PIPE COLUMNS
2.8. OFF-WHITE BRICK / DRYWALL / PLASTER WALLS
3. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT ARE ASBESTOS
CONTAINING MATERIALS (ACM):
3.1. AIRCELL TSI INSULATION - WHITE AND GRAY
3.2. WHITE TSI
3.3. RAISED FLOOR FOOT MASTIC - BLACK
3.4. TAN VINYL FLOOR TILE (VFT)
3.5. BLACK MASTIC ASSOCIATED WITH BEIGE VFT
3.6. OFF-WHITE FIBERGLASS BRIDGING PAINT
3.7. MIXED CARPET MASTIC - BLACK / YELLOW
4. CONTRACTOR SHALL ASSUME THAT ACM'S ARE PRESENT WITHIN CONCEALED SPACES SUCH AS PIPE CHASES AND THE
CRAWL SPACE AND SHALL REMOVE AND DISPOSE OF ALL SUCH MATERIALS ENCOUNTERED.
5. MATERIALS INDICATED ON THIS PLAN SERVE ONLY TO ALERT THE CONTRACTOR TO THEIR PRESENCE ON THIS PROJECT.
EPA REGULATIONS STIPULATE THAT IF ONE SAMPLE OF A MATERIAL IS FOUND TO CONTAIN ASBESTOS THEN THE ENTIRE QUANTITY OF THAT MATERIAL CONTAINS ASBESTOS, REGARDLESS OF ADDITIONAL ANALYSIS. CONTRACTOR SHALL
REMOVE ALL SIMILAR MATERIALS WITHIN THE ENTIRE PROJECT SCOPE.
6. THIS PLAN IS BASED ON THE "HAZARDOUS MATERIALS SURVEY REPORT DATED OCTOBER 25, 2019 BY ECS, LTD." AND SERVES ONLY AS A SUMMARY OF SOME INFORMATION FOUND IN THAT DOCUMENT. REFER TO SECTION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT, 02 83 33.13 LEAD-BASED PAINT REMOVAL & DISPOSAL AND THE "HAZARDOUS MATERIALS SURVEY", INCLUDED IN THE PROJECT SPECIFICATION MANUAL, FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
1. THE WORK OF THIS CONTRACT MAY REQUIRE PARTIAL REMOVAL OR DISASSEMBLY OF EXISTING CEILINGS AND/OR WALLS FOR ACCESS TO SPACES WHERE NEW ITEMS ARE REQUIRED TO BE INSTALLED OR EXISTING ITEMS ARE REQUIRED TO BE DEMOLISHED. EXAMPLES INCLUDE TELECOMMUNICATIONS, PLUMBING, ELECTRICAL, MECHANICAL, FIRE PROTECTION, STRUCTURAL, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THOROUGHLY REVIEWING THE CONSTRUCTION DOCUMENTS AND FOR DETERMINING THE EXTENT OF REMOVAL OR DISASSEMBLY WORK NECESSARY TO PERFORM THE
WORK OF THIS PROJECT IN ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS.
2. THE CONTRACTOR SHALL FIELD-VERIFY AND DOCUMENT THE EXISTING CONDITIONS OF CEILING OR WALL SURFACES TO
BE REMOVED OR DISASSEMBLED PRIOR TO BEGINNING THE WORK.
3. THE CONTRACTOR SHALL CAREFULLY REMOVE, OR DISASSEMBLE, EACH EXISTING CEILING OR WALL SURFACE IN A
MANNER THAT MINIMIZES DAMAGE TO ADJACENT EXISTING SURFACES.
4. AFTER THE WORK HAS BEEN COMPLETED, THE CONTRACTOR SHALL REPLACE, PATCH, AND FINISH THE EXISTING
SURFACE TO THE CONDITION IT WAS IN PRIOR TO REMOVAL.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
HUITT - ZOLLARS
500 WEST 7TH ST. STE 700
FORT WORTH, TX 76102
817-335-3000
CONSULTANT:
ECS SOUTHWEST
3033 KELLWAY DR. #100
CARROLTON, TX 75006
281-814-2502
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
CONSULTANT:
OCMI, INC.
6110 EXECUTIVE BLVD.
STE 440
ROCKVILLE, MD 20852
202-450-3843
07/18/2025
519-23-908
JSKJ
VA BIG SPRING DATA CENTER
BID RESUBMISSION
GENERAL NOTES
GI300
-2
-9
G I3
.p d f
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
MEDICAL WASTE NOTES
SMOKING POLICY
REFERENCES GENERAL NOTES
EXISTING CONDITIONS
CONSTRUCTION SETS
MISCELLANEOUS
VA PHYSICAL SECURITY COMPLIANCE
HAZARDOUS MATERIALS
ACCESS TO EXISTING CONCEALED AREA
WOMEN'S
D8
D6 D6D6
D8
D8
D8 D8
D8
D8
D8
D11
D11 D11
D6
D6
D6
D22
D22
D8
D8
D8
D
D6
D
D 6
D
D 6
D
D 6
D
D
D 6
D8
D8
D6
D
D6
D8
D6
D8 D8
D8
D8
D11
D11
D8
D11
D6
D6
D6
D22
D22
D8
D8
D8
D
D6
D
D 6
D
D 6
D
D 6
D
D 6
D8D8
114A
114B
NORTH
ENTRANCE OPC
INFORMATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59
64 65 66 67 68 69 70 71 72 73 74 76 77 78 79 8060 61 62 63
26.A
UP
RAMP
RAMP
RAMP
18B
3A
87I
87K
20A
113B
107A
107B
96C
96B
151 150 116
127 128
72F
138A
18A
147C
65B
91G
91J
119A
119B
125D
120D
122A 122B
122D 122C
124A 124B
124C 124D
125A
125C 125B
136137138
147B
147A
ATS
ENG.
145A
120C
120B 120A119C
119C
113A
112H
106B
106A
104A
105A
100A
98 97
164A162 161160159
85A
91C
96A
96D96E
91B
91D 91E
91H
91A 91I
91F87E
87D
9090A
87C 87B
87O
87P
87N 87M
87A
87F87G
87L
152A
153B
153A
1B
1D1E
4B
4A
66A78910
65A
72G
55A
53B5353A
28A
31E
31A
31E
31B
31C
91K
91M91N
91L
112A
HEALTH
BENEFIT
ADMIN.
112C
4E 4F
4C
64B
64A
67A
112B
112E
112D
112F
112G
HEALTH
BENEFIT
ADMIN.
EYEWASH
RO WATER
ICE MACHICE
EYEWASH
EYEWASH
Hose Bibb
3 washers
WH
washer
CLOSET
MENS
BATH RM
MALE
REST RM
CHEMICAL STORAGE
CART WASH
ELECTRICAL CLOSET
HOUSE
KEEPING
SUPPLY
MALE
REST RM
DRESSING RM
DRESSING RM
MALE
REST RM
EMS
SOILED
LINEN RM
REST RM
MALE
REST RM
ELECTRICAL RM ELECTRICAL RM CLOSET
HOUSE KEEPING
TELECOM
CLOSET
SCALE
SOILED UTILITY
REST RM
REST
RM STAFF
TOILET
DATA IRM
TELECOM CLOSET
REST RM
ELECTRICAL RM
HOUSE
KEEPING
FEMALE
REST RM
CLOSET
HOUSE
KEEPING
STORAGE CLOSET
FP
FP
NURSE OFFICE ER
MED DISPENSING
PHARMACY VAULT
SMOKING SHELTERSMOKING SHELTER
FP
CLINIC
WAITING
AREA PRIMARY CARE
SOCIAL
WORKER
NURSE
Office
Primary Care Nurse
ELECTRICAL RM
MED
DISPENSARY
STAIR
EXAM
RM
(PURPLE)
CLINIC
(ORANGE)
COPY RM NURSE CLINIC (GOLD)PHYSICAIN (GOLD)
VACANT
CLINIC
ROOM
(GOLD)
EXAM ROOM (GOLD)
NURSE TRIAGE (SILVER)
PHYSICAIN
(SILVER)
EXAM
RM
(SILVER)
EXAM
ROOM
(SILVER)
NURSE
TRIAGE
(PURPLE)
EXAM
RM
(PURPLE)
PHYSICIAN
(PURPLE)
TELE- HEALTHWOMANS
HEALTH
WHEEL
CHAIR
AREA
RECEPTION CONTROL
FP
STAIR
- C
TEXAS
VETERANS
COMMISSION
CLOSET
D.A.V
CLINIC EXAM (GOLD)
physicain (ORANGE)
NURSE
CLINIC
(ORANGE)
Pahamacist health behavior Coor, AUDIOLOGIST
TRIAGE
UC BED
BREAK RM
MED
RM
CORRIDOR
PATIENT
AFFECT
RM / EMS
PATIENT CLOTHING
LINEN REPAIR
OUTDOOR EQUIP
BREAK RM
LAUNDRY FOREMAN
CLEAN
LINEN
STORAGE
SOILED LINEN
RM / EMS
LINEN
RM EMS
FEMALE
REST
RM EMS
RELEASE OF
INFORMATION
CHIEF
HIMS
STORAGE
EQUINOX RM IRM FILE RM
CLINICAL
PHARMACY
MY
HEALTHY
VET
TELE-
HEALTHPHARMACY WAITING AREA
PHARMACY PATIENT COUNSELING
LINEN CHUTE
FIRE
ALARM
PHARMACY CHIEF
SECY
SUPPLY
RM IRM
OFFICEOFFICE
NARC VAULT
STORAGE
CONSULTING RM
INPATIENT PHARMACY
IV
RM
BREAK RM
MEDICATION DISPENSINGINGREDIENT CONTROL
DIET
OFFICE
TRAVEL AGENTAGENT CASHIER
NUTRITION AND FOOD
CHIEF
NUTRITION
FOOD AND SVC
DISHWASHER AREA
FP
POTS
AND
PANS
WASH RM
WALK-IN
REFRIGERATION
FREEZER
FREEZER
WALK-IN REFRIED
WALK-IN
REFRIGERATION
DESSERT / NOURISHMENT AREA
VEGETABLE PREP
WALK-IN
REFRIGERATION
STORAGE
C&P
VACANT
STAFF
OPHTHALMOLOGY
NURSE
OFFICE
PROVIDERS OFFICEEXAM RM
LOCKER RM
TRAINING RM
CHIEF POLICE
PATIENT
REPRESENTATIVE
DIRECTOR
FP
FEE
BASIS
DIRECTORS
STAIR
- B
COMMUNCATION
SPECIALIST
STORAGE
VOLUNTARY
STORAGE
VCS
STORAGE
A/O
CANTEEN OFFICE
FP
VCS
STORAGE
FEMALE
REST RM
CHAPEL
FP
CHAPLAIN
STAIR - A
CONFERENCE RM
A/O
INTEGRATED
CARE
A/O
TO THE
DIRECTOR
HEALTH
SYSTEM
BENEFITS
A/O TO
CHIEF OF
STAFF
COPIER
ADMIN OFFICER
ASSOCIATE DIRECTOR
ASST
COS
ADMIN
DIRECTOR
CHIEF STAFF
TELEPHONE
SWITCH
BOARD /
IRM
CORRIDOR
ELEVATOR
CORRIDOR
EMERGENCY
PANEL
TOILET
CHEMICAL STORAGE
MALE REST RM
FP
TOILET
ELEVATOR
FP
STAIR
ELEVATOR ELEVATOR ELEVATOR ELEVATOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PHARMACY PATIENT COUNSELING
C&P
VACANT
C&P
VACANT
C&P
FILEROOM
C&P
EXAM
C&P
EXAMC&P
EXAM
C&P
EXAM
C&P
EXAM
C&P
EXAM
C&P
EXAM
CORRIDOR
AUDIOLOGIST
PATIENT
REPRESENTATIVE
DIRECTOR
OFFICE RM
HOLDING
RMARMORY RM
PATIENT
REPRESENTATIVE
DIRECTOR
POLICE CHECK IN
PRIVACY
OFFICER
CHIEF
VOLUNTARY
NURSE
MANAGER
VOLUNTARY
SERVICE
HEALTH
SYSTEM
BENEFITS
ASST TO
CHIEF
NURSING
NURSE
CHIEF
A/O
INTEGRATED
CARE
HK
AOD
EQUIPMENT
STORAGE
UC BED
UC BED
UC BED
AUDIOLOGY TECH
ISOLATION
ROOM
TELE- HEALTH
WAITING
AREA
VACANT
W A T E R
S U P P
LY
DISH
FIRE
ALARM
FP
ROLLING SHUTTER
ROLL UP DOOR 10'2"
UP
UP
N
AREA OF
WORK
SITE KEY PLAN
SCALE: NTS
1. EXISTING CONDITION DRAWINGS IS FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL TEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF
WORK.
GENERAL EXISTING PLAN NOTES
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
HUITT - ZOLLARS
500 WEST 7TH ST. STE 700
FORT WORTH, TX 76102
817-335-3000
CONSULTANT:
ECS SOUTHWEST
3033 KELLWAY DR. #100
CARROLTON, TX 75006
281-814-2502
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
CONSULTANT:
OCMI, INC.
6110 EXECUTIVE BLVD.
STE 440
ROCKVILLE, MD 20852
202-450-3843
07/18/2025
519-23-908
JSKJ
VA BIG SPRING DATA CENTER
BID RESUBMISSION
BUILDING 1 - 1ST FLOOR - EXISTING
OVERALL FLOOR PLAN
GC201
-2
-9
G C
/2
/2
.p d f
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
1" = 20'-0"C11
BUILDING 1 - 1ST FLOOR - EXISTING CONDITION OVERALL FLOOR PLAN
N
BUILDING
NORTH
TRUE
NORTH
N
EXTERIOR
OFFICE
96D
OFFICE
96E
TELEPHONE
SWITCH BOARD /
IRM
SUPPLY RM IRM
96A
EQUINOX RM IRM
FILE ROOM
RELEASE OF
INFORMATION
CHIEF HIMS
100A
STORAGE
PHARMACY CHIEF
SEC Y
91C
ROOM
WOMEN REST RM
96C
MEN REST RM
96B
PHASE 1
PHASE 1
PHASE 2
PHASE 3
N
BUILDING
NORTH
KEY PLAN
BUILDING 1
SCALE: NTS
1. EXISTING CONDITION DRAWINGS IS FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL TEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF
WORK.
GENERAL EXISTING PLAN NOTES
PHASING NOTES
1 PHASE 1 INCLUDES THE FOLLOWING WORK:
1. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT
PROTECTION DEVICES AS NEEDED TO PROTECT OCCUPANTS OF ADJACENT
AREA FROM CONSTRUCTION ACTIVIES.
2. SELECTIVE DEMOLITION OF PHASE 1.
3. CONTRUCTION OF ALL WORK DESIGNATED AS PHASE 1 ON THIS PLAN. REFER
TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR WORK TO OCCUR
WITHIN THESE AREA. ALL AREA OUTSIDE OF PHASE 1 SHALL REMAIN
OPERATIONAL UNIT PHASE 1 IS COMPLETE. DO NOT START ANY WORK ON
PHASE 2 UNTIL AUTHORIZED BY COR.
4. UPON APPROVAL OF PHASE 1 WORK BY THE COR, REMOVE TEMPORARY
CONSTRUCTION BARRIER. RESTORE AREAS IMPACTED BY CONSTRUCTION
BARRIER TO LIKE NEW CONDITION.
2. PHASE 2 INCLUDES THE FOLLOWING WORK:
1. DECONSTRUCTION OF PHASE 1 TEMPORARY CONSTRUCTION BARRIERS.
2. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT
PROTECTION DEVICES AS NEEDED TO PROTECT OCCUPANTS OF ADJACENT
AREA FROM CONSTRUCTION ACTIVIES.
3. SELECTIVE DEMOLITION OF PHASE 2.
4. CONTRUCTION OF ALL WORK DESIGNATED AS PHASE 2 ON THIS PLAN. REFER
TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR WORK TO OCCUR
WITHIN THESE AREA. ALL AREA OUTSIDE OF PHASE 1 SHALL REMAIN
OPERATIONAL UNIT PHASE 1 IS COMPLETE. DO NOT START ANY WORK ON
PHASE 2 UNTIL AUTHORIZED BY COR.
5. UPON APPROVAL OF PHASE 2 WORK BY THE COR, REMOVE TEMPORARY
CONSTRUCTION BARRIER. RESTORE AREAS IMPACTED BY CONSTRUCTION
BARRIER TO LIKE NEW CONDITION.
3. PHASE 3 INCLUSES THE FOLLOWING WORK:
1. DECONSTRUCTION OF PHASE 2 TEMPORARY CONSTRUCTION BARRIERS.
2. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT
PROTECTION DEVICES AS NEEDED TO PROTECT OCCUPANTS OF ADJACENT
AREA FROM CONSTRUCTION ACTIVIES.
3. SELECTIVE DEMOLITION OF PHASE 3.
4. CONTRUCTION OF ALL WORK DESIGNATED AS PHASE 2 ON THIS PLAN. REFER
TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR WORK TO OCCUR
WITHIN THESE AREA. ALL AREA OUTSIDE OF PHASE 2 SHALL REMAIN
OPERATIONAL UNIT PHASE IS COMPLETE.
5. UPON APPROVAL OF PHASE 3 WORK BY THE COR, REMOVE TEMPORARY
CONSTRUCTION BARRIER. RESTORE AREAS IMPACTED BY CONSTRUCTION
BARRIER TO LIKE NEW CONDITION.
4. AT THE COMPLETION OF EACH PHASE, THE FACILITY SHALL BE ABLE TO FULLY USE SUCH
PHASED SPACE. UPON ACCEPTANCE BY THE COR. THE CONTRACTOR SHALL TURN OVER
THE COMPLETE PHASE WORK TO THE FACILITY AND THE END USER AS THE FINAL
PRODUCT, WITH ALL ASPECTS OF CONSTRUCTION AN FINISHES COMPLETED AND
ACCEPTED BY THE COR.
1. GENERAL CONTRACTOR SHALL COORDINATE AND FINALIZE CONSTRUCTION PHASING
PLAN WITH VA COR PRIOR TO COMMENCEMENT OF CONSTRUCTION.
2. REFER TO DEMOLITION PLANS (ARCHITECTURAL, STRUCTURAL, AND MEP) FOR PHASED
DEMOLITION INFORMATION.
3. CONTRACTOR SHALL SUBMIT A PHASING PLAN INDICATING PRIMARY PHASES AND SUB-
PHASES AS MAY BE REQUIRED TO PROPERLY SEQUENCE THE ENTIRE PROJECT.
PHASING SHALL MINIMIZE IMPACT TO ONGOING VA OPERATIONS IN THE OCCUPIED AREAS
OF THE BUILDING WHERE CONSTRUCTION ACTIVITIES ARE TO OCCUR.
4. PROVIDE TEMPORARY SIGNAGE AND CONSTRUCTION BARRIERS AS NECESSARY TO
ALERT AND PROJECT BUILDING OCCUPANTS IN AREAS OUTSIDE THE CONSTRUCTION
ZONE. TEMPORARY CONSTRUCTION BARRIERS SHALL COMPLY WITH REQUIREMENTS OF
ICRA. SEE GC400 SERIES.
5. ALL CONSTRUCTION WORK WILL BE CONDUCT ED AFTER HOURS TO AVOID MINIMUM
INTERRUPTIONS TO ONGOING OPERATIONS, UNLESS NOTED OTHERWISE.
GENERAL PHASING NOTES
PHASE 1 CONSTRUCTION
PHASING PLAN LEGEND
PHASE 2 CONSTRUCTION
PHASE 3 CONSTRUCTION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
HUITT - ZOLLARS
500 WEST 7TH ST. STE 700
FORT WORTH, TX 76102
817-335-3000
CONSULTANT:
ECS SOUTHWEST
3033 KELLWAY DR. #100
CARROLTON, TX 75006
281-814-2502
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
CONSULTANT:
OCMI, INC.
6110 EXECUTIVE BLVD.
STE 440
ROCKVILLE, MD 20852
202-450-3843
07/18/2025
519-23-908
JSKJ
VA BIG SPRING DATA CENTER
BID RESUBMISSION
BUILDING 1 - 1ST FLOOR - ENLARGED
PHASING PLAN
GC201a
-2
-9
G C a
/1
/2
.p d f
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
1/4" = 1'-0"A14
BUILDING 1 - 1ST FLOOR - ENLARGED PHASING PLAN
N
BUILDING
SITE KEY PLAN
SCALE: NTS
1. EXISTING CONDITION DRAWINGS IS FOR REFERENCE ONLY. CONTRACTOR SHALL
VERIFY LOCATION OF ALL TEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF
WORK.
GENERAL EXISTING PLAN NOTES
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
52 53
100.5
100.6
100.7
100.8
100.9
100.10
100.11
50.5
46.5
46.1
45.5
55.5
54.5
LEVEL 02
LEVEL 01 ROOF
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
HUITT - ZOLLARS
500 WEST 7TH ST. STE 700
FORT WORTH, TX 76102
817-335-3000
CONSULTANT:
ECS SOUTHWEST
3033 KELLWAY DR. #100
CARROLTON, TX 75006
281-814-2502
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
CONSULTANT:
OCMI, INC.
6110 EXECUTIVE BLVD.
STE 440
ROCKVILLE, MD 20852
202-450-3843
07/18/2025
519-23-908
JSKJ
VA BIG SPRING DATA CENTER
BID RESUBMISSION
BUILDING 1 - 2ND FLOOR AND LOWER
ROOF - PARTIAL EXISTING PLAN
GC202
-2
-9
G C
/2
/2
.p d f
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
1/16" = 1'-0"B13
BUILDING 1 - 2ND FLOOR AND LOWER ROOF - PARTIAL EXISTING PLAN
N
BUILDING
NORTH
TRUE
ICRA MATRIX
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III/IV
MEDIUM I II III IV
HIGH I II III/IV IV
HIGHEST II III/IV III/IV IV
PATIENT
RISK GROUP
1. EXECUTE WORK BY METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION
OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE
DISPLACED FOR VISUAL INSPECTION.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. CLEAN ANY DUST/DEBRIS GENERATED BY PROJECT.
C
LA
S
I
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST
FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
2. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA.
3. REMOVE ISOLATION OF HVAC SYSTEM WHEN JOB IS
COMPLETED.
4. CLEAN TRACKED DUST/DEBRIS IN COMMON AREAS AS
NEEDED; CLEAN AREA AT THE END IF THE WORK DAY.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL SERVICES PRIOR TO USE.
C
LA
II
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING DONE TO PREVENT CONTAMINATION OF
DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM OR VACUUMING PRIOR
TO EXIT) BEFORE CONSTRUCTION BEGINS).
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS; OR
HEPA AIR SCRUBBER IF UNABLE TO ACHIEVE NEGATIVE
PRESSURE; FILTER CHANGED AS NEEDED.
4. MAINTAIN STICKY MATS AT ENTRANCE. AVOID TRACKING
DUST/DEBRIS OUTSIDE OF WORK AREA, CLEAN AREA AS
NEEDED.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED AND DIRT AND DEBRIS HAS
BEEN REMOVED.
2. WET MOP AND/OR VACUUM WORK AREA WITH HEPA
FILTERED VACUUM.
3. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL MANAGEMENT SERVICES
DEPARTMENT PRIOR TO USE
C
LA
III
WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION
TO WORK SITE WITH HEPA VACUUM OR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM SO THEY
CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED
EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE AREA
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED PROJECT AND INSPECTED.
8. AREA SHOULD BE TERMINALLY CLEANED BY THE
OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT
PRIOR TO USE.
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
C
LA
IV
AREA NOT IN
SCOPE OF WORK
ICRA LEGEND
ICRA BARRIER
ICRA KEYNOTE
TAG
ICRA DOOR
WALK OFF
MATT
41 42 43 44 45 46 47 48 4950
52 53
100.6
100.7 100.8
50.5
46.5 46.145.5
EXTERIOR
UP
OFFICE
96E
OFFICE
96D
TELEPHONE SWITCH
BOARD / IRM
SUPPLY RM IRM
96A
ROOM
WOMEN
RES RM
96C
MEN REST RM
96B
GC400a
A13
GC400a
F13
GC400b
A13
PHASE 1 CONSTRUCTION
PHASING PLAN LEGEND
PHASE 2 CONSTRUCTION
PHASE 3 CONSTRUCTION
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
CONSULTANT:
HUITT - ZOLLARS
500 WEST 7TH ST. STE 700
FORT WORTH, TX 76102
817-335-3000
CONSULTANT:
ECS SOUTHWEST
3033 KELLWAY DR. #100
CARROLTON, TX 75006
281-814-2502
ARCHITECT:
CB DESIGN GROUP
421 KING ST.
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
PROFESSIONAL SEAL:
2345678910111213141516
B
C
D
E
F
G
H
J
K
12345678910111213141516
CONSULTANT:
OCMI, INC.
6110 EXECUTIVE BLVD.
STE 440
ROCKVILLE, MD 20852
202-450-3843
07/18/2025
519-23-908
JSKJ
VA BIG SPRING DATA CENTER
BID RESUBMISSION
ICRA PLAN
GC400
-2
-9
G C
/2
/2
.p d f
West Texas VAHCS 300 Veterans Blvd.
Big Spring, TX 79720
ICRA - GENERAL NOTES
IG1 PROVIDE TEMPORARY / PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY INDICATED ON PLANS. CONTRACTOR
SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR TO BEGINNING ANY WORK.
IG2 DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS.
DOORS SHALL AUTOMATICALLY LOCK UPON CLOSURE.
IG3 CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL
ICRA DOORS.
IG4 ALL ICRA PARTITIONS SHALL BE WALL TYPE "T1". REFER TO AE301 FOR MORE INFORMATION.
IG5 CONTRACTOR SHALL COMPLY WITH NFPA 241 FOR DURATION OF DEMOLITION AND CONSTRUCTION.
IG6 CONTRACTOR SHALL PROVIDE NEW UPRIGHT SPRINKLERS WHEN THE CEILING ARE REMOVED IN ORDER TO MAINTAIN
SPRINKLER PROTECTION WITHOUT THE NEED TO USE RATED CONSTRUCTION BARRIERS.
ICRA - CONSTRUCTION NOTES
IC1 ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
IC2 COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, & PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH
HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
IC3 MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. THE CONTRACTOR SHALL USE TEMPORARY PRESSURE SENSORS CONNECTED TO THE BUILDING AUTOMATION SYSTEM (BAS) VIA AHU-7 CONNECTION. THE CONTRACTOR SHALL TRACK, TREND, AND ALARM PROJECT AREA PRESSURE TO ENSURE PROOF OF NEGATIVE PRESSURE ENVIRONMENT AT ALL TIMES UNTIL
APPROVED BY VA COR TO REMOVE.
IC4 SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS REQUIRED.
IC5 CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT
ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
IC6 ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED
EACH TIME THE WORKER EXITS THE WORK AREA.
IC7 DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROGHLY CLEANED BY THE
OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
IC8 REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630.
IC9 CONTRACTOR TO USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS THROUGH
THE FACILITY.
IC10 PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA - KEY NOTES
IK1 AIRTIGHT ANTEROOM. CONTRACTOR SHALL MAINTAIN 44" CLEAR IN CORRIDOR
OUTSIDE.
IK2 TEMPORARY WALK-OFF MAT
IK3 HEPA FILTER EXHAUST FAN SYSTEM VENTED THROUGH EXISTING WINDOW OR DOOR.
CONTRACTOR SHALL VERIFY LOCATION WITH COR.
IK4 CONTRACTOR ENTRANCE AND DEBRIS REMOVAL DOOR.
ICRA…
This is the start of the file's text. The full file is on GovTribe.