Spec 01 31 00.01 Project Management and Coordination.docx

DOCX document 27 KB Posted

Attached to
Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Spring
Solicitation number
36C77626B0001
Issued by

About this file

This document is a technical specification section for Project Management and Coordination, specifically detailing digital project management procedures for a construction project. The specification requires a web-based project management software package (such as Procore or Oracle Primavera Submittal Exchange) with comprehensive features including document workflow planning, access control, real-time communication tracking, and mobile device compatibility. The software must support various project documentation processes like RFI tracking, submittal management, change order processing, and meeting minute distribution. The specification mandates providing user licenses for the Owner, Architect, and consultants, along with eight hours of software training, and requires a digital archive of project documents in a locked, readable format upon project completion.

View the file

Other files

File Type Posted
Redacted Abstract of Bids OF 1419 - Big Spring EHRM Tier 2 Data Ctr.pdf PDF
Tech Questions Tracker - Big Spring EHRM 2-2-26.pdf PDF
36C77626B0001 0008.pdf PDF
36C77626B0001 0007.docx DOCX document
Brand Name Justification - Big Spring EHRM_Redacted.pdf PDF
36C77626B0001 0006.docx DOCX document
Howard County Bldg Construction 1-2-2026.pdf PDF
36C77626B0001 0005.docx DOCX document
Asbestos Survey Report September 2016 Building 1.pdf PDF
Howard County Bldg Construction 12-12-2025.pdf PDF
000110 - Addendum 01.pdf PDF
087100 - Addendum 01.pdf PDF
AE300 - Addendum 01.pdf PDF
GC201a - Addendum 01.pdf PDF
2022-12-23 VA BSP EHRM Contract Documents Drawings.pdf PDF
Asbestos and Lead Based Paint Photolog Building 1 Final.pdf PDF
Asbestos Management Plan Building 1 Final.pdf PDF
02 82 11.01 - Addendum 01.pdf PDF
Lead Inspection Report Building 1 Final.pdf PDF
Tech Questions Tracker - Big Spring EHRM 12-31-2025.pdf PDF
36C77626B0001 0004.docx DOCX document
36C77626B0001 0003.docx DOCX document
36C77626B0001 0002.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
36C77626B0001 0001.docx DOCX document
PCRA_Tier_2_Data_Center.pdf PDF
Site Visit Instructions.docx DOCX document
VA_BSP Data Center Bid Resubmission - Spec Vol 2.pdf PDF
VA.BSP Data Center Bid Resubmission - Spec Vol 1.pdf PDF
ICRA_Tier_2_Data_Center.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
VA_BSP Data Center Bid Resubmission - Drawings.pdf PDF
Howard County Bldg Construction 7-18-2025.pdf PDF
36C77626B0001_1.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 31 00.01

PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provision for coordinating construction operations on Project, including, but not limited to, the following:

1. Web-based Project management software package.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

1.3 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.4 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Web-Based Project Management Software Package: Provide, administer, and use web-based Project management software package for purposes of hosting and managing Project communication and documentation until Final Completion.

1. Basis of Specification: Procore, Oracle Primavera Submittal Exchange or other equivalent web-based project management software.

2. Web-based Project management software includes, at a minimum, the following features:

a. Compilation of Project data, including Contractor, subcontractors, Architect, Architect's consultants, Owner, and other entities involved in Project. Include names of individuals and contact information.

b. Access control for each entity for each workflow process, to determine entity's digital rights to create, modify, view, and print documents.

c. Document workflow planning, allowing customization of workflow between project entities.

d. Creation, logging, tracking, and notification for Project communications required in other Specification Sections, including, but not limited to, RFIs, submittals, Minor Changes in the Work, Construction Change Directives, and Change Orders.

e. Track status of each Project communication in real time, and log time and date when responses are provided.

Project Number Project Name Project Location

PROJECT MANAGEMENT AND COORDINATION

05-01-24

01 31 00.01 - 1

f. Procedures for handling PDFs or similar file formats, allowing markups by each entity. Provide security features to lock markups against changes once submitted.

g. Processing and tracking of payment applications.

h. Processing and tracking of contract modifications.

i. Creating and distributing meeting minutes.

j. Document management for Drawings, Specifications, and coordination drawings, including revision control.

k. Management of construction progress photographs.

l. Mobile device compatibility, including smartphones and tablets.

3. Provide Project management software user licenses for use of Owner, Architect, and Architect's consultants. Provide eight hours of software training for web-based Project software users.

4. At completion of Project, provide digital archive in format that is readable by common desktop software applications in format acceptable to Architect. Provide data in locked format to prevent further changes.

PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)

- - - END - - -