This document is a comprehensive asbestos survey report for Building 1 at the Veterans Affairs (VA) Medical Center in Big Spring, Texas, conducted by HGS Engineering, Inc. in September 2016. The survey systematically examined interior building materials, roofing, and previously sampled areas across all floors (basement through eighth floor) to identify and evaluate asbestos-containing materials (ACMs).
Key findings include the discovery of two confirmed asbestos-containing materials: black/grey flashing mastic with rubber seal (5% chrysotile) and black mastic in the hallway near Room 100 (5% chrysotile). The report indicates widespread historical asbestos presence, including thermal system insulation, floor tiles, mastics, and waterproofing materials in walls and pipechases. Multiple previous surveys dating back to 1995 had partially identified and abated asbestos materials. The document recommends that any identified ACMs potentially disturbed during future renovations must be properly removed by a licensed asbestos abatement contractor, following strict EPA, OSHA, and Texas Department of State Health Services regulations. Additional sampling and assessment are recommended for inaccessible spaces like pipe chases and mechanical areas.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
November 3, 2016
Mr. Darron Moore Department of Veterans Affairs Contracts 00504 Engineering Services – Big Springs, Texas Location 7201 I-40 West Suite 100 Amarillo TX 79106 Darron.Moore@va.gov
RE: Limited Asbestos Survey Veterans Affairs (VA) Medical Center 300 West Veterans Boulevard, Big Spring, Texas 79720
Building 1
Dear Mr. Moore:
HGS Engineering Inc. (HGS) was retained by Department of Veterans Affairs Contracts 00504 Engineering Services – Big Springs, Texas Location to perform a limited asbestos survey of the interior building materials and the roof at Building 1, and a review of a previous survey conducted by Dougherty Sprague Environmental, Inc. (dse) in June 2011. This investigation included a visual inspection and physical survey to identify suspect asbestos-containing materials (ACMs) or asbestos-containing building materials (ACBMs) and evaluate their general condition. The scope of work for this assessment included the sampling and laboratory analysis of suspect ACMs that may be disturbed during future renovations.
dse ACM SURVEY JUNE 2011 (previous survey)
According to dse, “Comprehensive asbestos inspections of the facility were performed in 1995 by Encon International (Encon) and in 2004 by Asset Group, Inc. (Asset Group). In addition, several consultants have performed limited inspections of building areas scheduled for renovation as early as 1986 and as recently as 2008. dse reviewed all of the available asbestos inspection reports prior to performing the re-inspection of the facility to avoid re-sampling homogeneous areas that were adequately sampled during earlier inspections and shown to be non-ACBMs. Moreover, the classification of homogeneous areas shown to be ACBMs during earlier inspections cannot be changed by re-sampling unless the homogeneous areas are redefined or the previous sampling results are in question because of poor documentation. In general, the 1995 and 2004 comprehensive inspections were well documented; however, the limited inspections were poorly documented with minimal supporting data such as drawings, photos and laboratory reports.”
According to dse in 2011:
Building 1 – Basement
All of the TSI in the basement was reportedly abated in 1990 and 1991; however, ACBM TSI may be located in the crawl space and in other areas that were inaccessible at that time.
ACBM TSI observed in the Universal Waste Storage Room (B-01) during 2008 inspection has been abated.
VCT in Bio Engineering was sampled on the First Floor of Building 1 and is a non-ACBM.
Drywall / joint compound / texture in Bio Engineering were sampled and identified as non-ACBMs.
September 23, 2016
Old drywall / joint compound / texture in basement area sampled and identified as non-ACBMs.
A Transite panel was identified hanging from the ceiling in the mechanical room north of the elevator shafts (B-14).
Limited sampling and analysis of TSI seam seal mastic in the 1996 Addition area did not identify any ACBMs.
Asbestos was detected on black TSI sealant on chilled water lines in the main corridor during the 2008 inspection. This material remains in place and is in good condition.
Building 1 - First Floor Northwest quadrant abated in 2011. Work in progress during the 2011 inspection.
Lobby Area abated in 2011. Work in progress during the 2011 inspection.
Areas adjacent to the 1996 Addition, and Rooms 1 and 1A through 1E, were listed abated in the
2004 Asset Group inspection; however, no documentation was available.
Limited sampling and analysis of new finishes in the 1996 Addition area did not identify any ACBMs.
Limited sampling and analysis of new finishes in this Pharmacy Cache Addition and adjacent areas did not identify any ACBMs.
ACBM TSI is present in walls, ceilings and pipechases throughout the First Floor of the original building.
Asbestos-containing Transite panels and black asbestos-containing mastic are present behind steam radiators.
Black asbestos-containing waterproofing is present on the inside of perimeter walls.
Mastic buttons behind acoustical ceiling tiles glued to walls and ceilings of Room 100 need to be sampled before they are disturbed. Ceiling tile was identified as a non-ACBM during the 2008 inspection.
Building 1 - Second Floor Majority of floor has new VCT, sheet vinyl or carpet over ACBM VCT and black mastic, in places two layers of VCT on top of ACBM VCT.
Dental clinic hallway and rooms 202 and 203 abated in 2011. ACBM sheet vinyl remains below
VCT in exam rooms and X-ray room.
Sterile Processing Department (SPD) was inaccessible. SPD area was reportedly built in a former conference room area after 1995; however, no abatement in that area was documented.
Lab area ACBM TSI above ceiling abated in Oct. 2005. Lab ACBM VCT and black mastic was not abated. Lab area and Rooms 235 and 251 have only one layer of ACBM VCT and black mastic.
Sheet vinyl in histology area of Lab is suspect ACBM, may be on top of ACBM VCT and black mastic.
The 1996 Addition was inaccessible. Limited sampling and analysis of new finishes on the First Floor of the 1996 Addition did not identify any ACBMs.
Rooms 245, 246, 248 and OP 233 area completely abated in 2008. One layer of ACBM VCT and black mastic observed in north-south hallway outside of X-Ray rooms.
Rooms 218 and 219 area completely abated in 2008. Limited sampling and analysis of new finishes in this area did not identify any ACBMs.
ACBM TSI insulation is present in walls, ceilings and pipechases throughout the Second Floor.
Asbestos-containing Transite panels and black asbestos-containing mastic may be present behind steam radiators.
Black asbestos-containing waterproofing is present on the inside of perimeter walls.
Building 1 - Third Floor
ACBM VCT and black mastic in elevator lobby and adjacent rooms and halls has not been abated.
ACBM VCT and black mastic observed in Patient Rooms 311 and 314.
TB Isolation Rooms TSI abated in Oct. 2005. New VCT installed at that time.
East Wing (MCU) totally abated between 1995 and 2004. Abatement appears to have been complete but limited documentation was available.
West Wing VCT and black mastic reportedly abated prior to 1995 ENCON inspection; however, no documentation of a complete abatement in the area was.
Most TSI reportedly abated in east and west wings; however, some asbestos-containing TSI is present in walls, ceilings and pipechases that were inaccessible to abatement workers, primarily on the exterior walls.
Asbestos-containing Transite panels and black asbestos-containing mastic may remain behind steam radiators.
Black asbestos-containing waterproofing remains on the inside of perimeter walls.
Building 1 - Fourth Floor
The floor was completely abated and gutted since the 2008 inspection. Renovation was in-progress during the 2011 inspection.
Most TSI was abated; however, some asbestos-containing TSI is present in walls, ceilings and pipechases that were inaccessible to abatement workers, primarily on the exterior walls.
Asbestos-containing Transite panels and steam radiators were removed, asbestos containing black mastic remained in place.
Black asbestos-containing waterproofing remains on the inside of perimeter walls.
Building 1 - Fifth Floor All TSI and VCT reportedly abated in late 2004.
Most TSI was abated; however, some asbestos-containing TSI is present in walls, ceilings and pipechases that were inaccessible to abatement workers, primarily on the exterior walls.
Black asbestos-containing waterproofing remains on the inside of perimeter walls.
Asbestos-containing Transite panels and black asbestos-containing mastic may remain behind
Limited sampling and analysis of new finishes on the Fifth Floor did not identify any ACBMs.
Building 1 - Sixth Floor
HVAC duct insulation above suspended ceilings and TSI inside closets 607A and 607B at end of main hallway west wing was abated in September 2009.
All VCT flooring and black mastic on 6th floor has been identified as ACBM. VCT is covered with carpet or non-ACBM VCT in several offices.
ACBM TSI is present in walls, ceilings and pipechases throughout the 6th floor.
Asbestos-containing Transite panels and black asbestos-containing mastic present behind steam radiators.
Black asbestos-containing waterproofing present on the inside of perimeter walls.
No suspect ACBM TSI observed in Mechanical Room 623A on end of west wing.
Building 1 -Seventh Floor
All TSI reportedly abated. No abatements documented TSI on steam pipes in southwest corner was sampled in 2008 and found to contain asbestos.
Radiator(s) present most likely has Transite backboard and black mastic ACBMs.
Labeled ACBM Transite flue observed in northeast corner. The flue pipe appeared to run from a chimney on the 7th floor roof to the basement inside an inaccessible plumbing chase.
Building 1 - Eighth Floor Elevator Machine Room reportedly abated in Feb. 2005.
Brake shoes inside of elevator equipment are suspected ACBMs. VA should discuss handling procedures with contractor responsible for elevator equipment maintenance.
SITE DESCRIPTION AND HGS ACM SURVEY, SEPTEMBER 2016
The survey was limited to the interior of Building 1 and roofing materials. According to the RFQ-VA258-16- Q-0434 and a Questions and Answer submittal, per Eddie Henderson, “The VA is not concerned about ACM exterior sampling of concrete, brick, mortar, pavement and walkways, nor ceramic tiles, and only Building 1 roof is to be sampled”
HGS’s survey was limited to the accessible suspect building materials inside Building 1, roofing materials, and materials not sampled previously by dse in June 2011 or materials that have been installed since 2011.
HGS identified the following materials that were not previously sampled and may be impacted by future renovation activities during this assessment:
Roofs
Roof Field, White painted Built Up Roof (BUR), roll on membrane with White Foam on deck Black / Grey Flashing Mastic with rubber seal – grey (ACM 5% Chrysotile) Roof Field, at Paver Roofs, Black Felt Moisture Barrier with Foam with Concrete deck Black Mastic on Flashing at Parapet Wall White Caulk Black Flashing on Roof Equipment Roof Field BUR with Gravel Roof Field, Asphaltic Rolled on Torched-down White HVAC Mastic on Roof
Main Building
Drywall / Joint Compound on 8th Floor Texture or Plaster on Concrete on 6th Floor TSI, White, new 4th Floor, Room 4073 Black Mastic Top of Roof 11 Red Fire Caulk 2’ x 2’ Drop Ceiling Tiles in Basement by elevators White HVAC Mastic in Basement by B3-B Exterior Window Glazing at Basement exit on east end Green-Red-Brown-Tan Vinyl Floor Tile with Clear Mastic on 6th Floor Hallway Wallpaper and Glue Covebase and Mastic Drywall / Joint Compound Covebase Mastic, Tan Wallpaper and Glue, 5th Floor Gold Carpet Mastic by Elevators on 5th Floor Floor Tile 12” x 12” White with Yellow Mastic 5th Floor Floor Tile 12” x 12” Beige with Black Mastic 3rd Floor Floor Tile 12” x 12” White and Blue with Yellow Mastic 3rd Floor Covebase Mastic, Tan, 2nd Floor Wallpaper and Glue 2nd Floor Laminate Floor, Woodgrain and Cream Mastic 12” x 12” Laminate Floor Marble and Cream Mastic Covebase Mastic, Tan Black Mastic Hallway, near Room 100 Floor 1 (ACM Chrysotile 5%)
HGS ACM SURVEY
Bulk sampling was conducted in general accordance with procedures outlined in the Texas Department of State Health Services (TDSHS) Texas Asbestos Health Protection Rules (TAHPR), the U.S. Environmental Protection Agency (EPA) National Emissions Standards for Hazardous Air Pollutants (NESHAP) and the EPA guidance document entitled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5-85/024). The asbestos inspection was performed by TDSHS-licensed asbestos inspectors, Mr. Lonnie Lyro (Individual Asbestos Consultant License No. 105763) and Ms. Trina Mullen (Individual Asbestos Consultant License No. 105687) on September 12-14, 2016.
HGS collected ninety-eight (98) bulk samples of suspect ACMs from the interior and roofs and limited exterior of Building 1. Bulk samples of suspect building materials were analyzed by Steve Moody Laboratories Inc., in Carrollton, Texas (TDSHS Laboratory License No. 300084). Steve Moody Laboratories is accredited with the EPA Interim Asbestos Bulk Sample Analysis Quality Assurance Program and the National Voluntary Laboratory Accreditation Program (NVLAP No. 102056-0). The PLM/DS analytical method is modeled after U.S. EPA Publication EPA/600/R-93/116: Test Method for the Determination of Asbestos in Bulk Materials, July 1993. If a material is identified as containing greater than 1% asbestos, it is considered to be an ACM. The Bulk Sample Analysis Reports, Chain of Custody, and applicable licenses/certifications, are attached. The asbestos report dated September 23, 2016 can be found in the attachments.
LIMITATIONS
This report is not to be utilized as a bidding document or as a project specification document since it does not have all the components required to serve as an Asbestos Project Design document or an Abatement Workplan.
Our professional services have been performed, our findings obtained, and our conclusions prepared in accordance with customary principles and practices in the fields of environmental science and engineering.
This statement is in lieu of other statements either expressed or implied. This report does not warrant against future operations or conditions, nor does it warrant against operations or conditions present of a type or at a location not investigated. This asbestos survey was limited to the accessible areas of the buildings on the West Texas VA Medical Center facility located at 300 Veterans Blvd., Big Spring, Texas. No effort was made to open spaces such as pipechases, crawl spaces, walls and attics that did not have access doors or hatches. In addition, no building components such as HVAC equipment, electrical equipment, pipes or plumbing fixtures that would require specially trained workers to remove or reinstall were disturbed. Locked and/or occupied rooms were not inspected if similar “functional spaces” were accessible.
This report is certified to the VA in Big Springs, Texas. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document or the findings, conclusions, or recommendations is at the risk of said user.
CONCLUSIONS
The following suspect building materials sampled during the 2016 survey were determined to contain greater than one percent asbestos and are therefore, considered asbestos containing materials by the EPA:
Black / Grey Flashing Mastic with rubber seal – grey (ACM 5% Chrysotile) Black Mastic Hallway, near Room 100 Floor 1 (ACM Chrysotile 5%)
The remaining materials sampled September 12-14, 2016 by HGS were reported as non-detect for the presence of asbestos and are not regulated and can be removed and disposed of as construction debris.
If any additional materials are discovered during renovation activities, these materials must be assumed to contain asbestos until sampling and analysis proves otherwise.
HGS made the following observations in regard to ACBMs within Building 1 during the 2016 Survey:
Building 1 – Basement
All of the TSI in the basement was reportedly abated in 1990 and 1991; however, ACBM TSI may be located in the crawl space and in other areas that were inaccessible at that time.
Asbestos was detected on black TSI sealant on chilled water lines in the main corridor during the 2008 inspection. This material remains in place and is in good condition.
Building 1 - First Floor
Northwest quadrant and Lobby abated in 2011.
ACBM TSI is present in walls, ceilings and pipechases throughout the First Floor of the original building.
Asbestos-containing cement asbestos board panels and black asbestos-containing mastic may be present behind steam radiators.
Black asbestos-containing waterproofing is present on the inside of perimeter walls.
Rooms 15 and 20 were undergoing renovation at the time of the 2016 Survey and no ACM was present.
Since the 2011 Survey, asbestos-containing VCT and associated mastic was abated from the southwest corridor, the Ward Supply (Gift Shop), the southeast and northeast corridors. However, black asbestos-containing floor tile mastic is still present in the Urgent Care Admin Waiting Area, and the corridor outside Room 100, as indicated on the drawings.
Building 1 - Second Floor
Floor tile abated in: Dental clinic hallway and rooms 202 and 203; Rooms 245, 246, 248 and OP 233 area; Rooms 218 and 219; elevator lobby and west hallway.
ACBM TSI insulation is present in walls, ceilings and pipechases throughout.
Asbestos-containing cement asbestos board panels and black asbestos-containing mastic may be present behind steam radiators.
Black asbestos-containing waterproofing is present on the inside of perimeter walls.
Building 1 - Third Floor
TB Isolation Rooms TSI abated in Oct. 2005.
East Wing (MCU) totally abated between 1995 and 2004.
West Wing VCT and black mastic reportedly abated prior to 1995 ENCON inspection; however, no documentation of a complete abatement in the area was.
Most TSI reportedly abated in east and west wings; however, some asbestos-containing TSI is present in walls, ceilings and pipechases that were inaccessible to abatement workers, primarily on the exterior walls.
Asbestos-containing Transite panels and black asbestos-containing mastic may remain behind
Since the 2011 Survey, asbestos-containing VCT and associated mastic abated from the elevator lobby.
Black floor tile mastic was sampled from the west wing and was determined to be non-ACM.
Building 1 - Fourth Floor
The floor was completely abated and gutted between 2008 and 2011.
Most TSI was abated; however, some asbestos-containing TSI is present in walls, ceilings and pipechases that were inaccessible to abatement workers, primarily on the exterior walls.
Asbestos-containing Transite panels and steam radiators were removed, asbestos containing black mastic remained in place.
Building 1 - Fifth Floor
All TSI and VCT reportedly abated in late 2004.
Most TSI was abated; however, some asbestos-containing TSI is present in walls, ceilings and pipechases that were inaccessible to abatement workers, primarily on the exterior walls.
Black asbestos-containing waterproofing remains on the inside of perimeter walls.
Asbestos-containing Transite panels and black asbestos-containing mastic may remain behind steam radiators.
Limited sampling and analysis of new finishes (both in 2011 ad 2016) on the Fifth Floor did not identify any ACBMs.
Building 1 - Sixth Floor
HVAC duct insulation above suspended ceilings and TSI inside closets 607A and 607B at end of main hallway west wing was abated in September 2009.
Asbestos-containing VCT flooring and black mastic was abated in hallways and elevator lobby since the 2011 survey. Asbestos-containing VCT and black mastic remain in most offices, as indicated on drawings and is covered with carpet or non-ACBM VCT in several offices.
ACBM TSI is present in walls, ceilings and pipechases throughout the 6th floor.
Asbestos-containing Transite panels and black asbestos-containing mastic present behind steam radiators.
Black asbestos-containing waterproofing present on the inside of perimeter walls.
No suspect ACBM TSI observed in Mechanical Room 623A on end of west wing.
Building 1 -Seventh Floor
All TSI reportedly abated; however, asbestos-containing TSI on steam pipes in southwest corner remains.
Where radiator(s) are present, they most likely have Transite backboard and black mastic ACBMs.
Labeled ACBM Transite flue observed in northeast corner. The flue pipe appeared to run from a chimney on the 7th floor roof to the basement inside an inaccessible plumbing chase.
Elevator Machine Room reportedly abated in Feb. 2005.
Brake shoes inside of elevator equipment are suspected ACBMs. VA should discuss handling procedures with contractor responsible for elevator equipment maintenance.
RECOMMENDATIONS
All materials previously sampled and determined not to contain asbestos, and those materials sampled during the 2016 survey and determined not to contain asbestos, are not regulated and can be removed and disposed of as construction debris. If any additional materials are to be disturbed during renovation activities, these materials must be assumed to contain asbestos until sampling and analysis proves otherwise. A comprehensive list of the sampled building materials can be found within the Asbestos Management Plan.
Prior to renovation/demolition, any identified ACM that could/may be disturbed must be properly removed by a TDSHS licensed asbestos abatement contractor. The licensed abatement contractor should remove the materials in compliance with the designed site specific scope of work, EPA NESHAP asbestos standards, TDSHS TAHPR, and OSHA 29 CFR 1926.1101. During abatement related activities the owner is required to have a TDSHS licensed Project Manager/Air Monitoring Technician (working under a licensed Asbestos Consulting Agency) on site, to provide air monitoring and documentation verifying applicable regulations are being followed.
Subcontractors and employees working within the structures at the site should be made aware of the locations of the ACM and the possibility of concealed ACMs that could be found during renovation/demolition activities.
Additional ACM and ACBMs may be present at the site in inaccessible or concealed spaces. These spaces include, but are not limited to, pipe chases, spaces between wall/ceiling/door/floor cavities, interior of mechanical components such as boiler cavities, interior ducts, beneath foundation pads, etc. If future maintenance/renovation/demolition activities make these areas accessible, HGS recommends that a thorough assessment of these spaces be conducted at that time to identify and confirm the presence or absence of additional ACMs. Until then, all such unidentified materials should be treated as assumed ACM in accordance with 40 CFR 76.
CLOSING
HGS appreciates the opportunity to be of service to the Department of Veterans Affairs on this project and looks forward to working with you on future assignments. In the meantime, if you have questions or comments regarding the information in this report or if we can be of further assistance, please do not hesitate to contact the undersigned in the HGS Round Rock, Texas office at (512) 366-6806.
Respectfully submitted, HGS Engineering, Inc.
Trina Mullen, IAC Lonnie Lyro, IAC Industrial Hygiene Department Manager Senior Industrial Hygienist Asbestos Individual Consultant Asbestos Individual Consultant License No. 10-5687 License No. 10-5687 Direct Line: +1 512 336 6806 Email: trina.mullen@atcassociates.com
Tim Thompson HGS Engineering Inc.
1121 Noble Street Anniston, AL 36201 Email: tim@hgsengineeringinc.com
Attachments: Table 1 Sample Results from September 12-14, 2016
Bulk Sample Analysis Reports and Chain of Custodies from September 12-14, 2016 Licenses/Certifications from September 12-14, 2016
Table 2 Sample results from dse in 2011 and previous reports
TABLE 1: SAMPLE RESULTS September 12-14, 2016
Sample Number Material Description Location(s)* Approximate Quantity of ACM Asbestos Type
01, 02, 03
Roof Field, White painted Built Up Roof (BUR), roll on membrane with White Foam on deck
Roof Top #1, Top # 2 (as sampled by HGS)
Field, 6th floor access
*refer to drawing and sample locations
NA ND
04, 05, 06 Black / Grey Flashing Mastic with rubber seal – grey
Roof Top #1, Top # 2 (as sampled by HGS), 6th floor Access
500 SF
5% Chrysotile, Category 1 Non- Friable
07, 08, 09 Roof Field, at Paver Roofs, Black Felt
Moisture Barrier with Foam with Concrete deck
Roof Top #3, Top # 4, Roof Top #5 (as sampled by HGS) Field, 5th, 2nd and 3rd floor access
10, 11, 12 Black Mastic on Flashing @ Parapet Wall by HGS), 5th, 2nd and 3rd floor access
13, 14, 15 White Caulk by HGS), 5th, 2nd and 3rd floor access of ACM Asbestos Type
16, 17, 18 Black Flashing on Roof Equipment
Top # 4, Roof Top #5 (as sampled by HGS), 2nd floor access
19, 20, 21 Roof Field BUR with Gravel
Top # 6, Roof Top #7 (as sampled by HGS)
Field, 2nd and 3rd floor access
22, 23, 24 Roof Field, Asphaltic Rolled on Torched-down
Top #8, Roof Top #9 with dome (as sampled by
HGS), 2nd floor access
25, 26, 27 White HVAC Mastic on Roof Top #10 at Air Handler Unit NA ND
28, 29, 30 Drywall / Joint Compound on 8th Floor 8th Floor Elevator Machine Room NA ND
31, 32, 33 Texture or Plaster on Concrete on 6th Floor 6th Floor outside Room 609, 608 NA ND
34, 35, 36 TSI, White, new 4th Floor, Room 4073 4tH Floor near Room 4073 NA ND of ACM Asbestos Type
37, 38, 39 Black Mastic Top of Roof 11
Roof Top #11
40, 41, 42 Red Fire Caulk Basement NA ND
43, 44, 45 2’ x 2’ Drop Ceiling Tiles in Basement by elevators Basement by elevators NA ND
46 No Sample Submitted by HGS No Sample Submitted by HGS - -
47, 48, 49 White HVAC Mastic in Basement by B3-B Basement by B3-B NA ND
Exterior Window Glazing at Basement exit on east end
Basement east end, Exterior NA ND
51, 52, 53
Green-Red-Brown-Tan Vinyl Floor Tile with
Clear Mastic on 6th Floor Hallway
Hallway 6th Floor at Room 609, elevator, solarium
NA ND
54, 55, 56 Wallpaper and Glue Hallway 6th Floor at Room 609, elevator, solarium
NA ND
57, 58, 59 Covebase and Mastic Hallway 6th Floor at Room 609, elevator, solarium of ACM Asbestos Type
60, 61, 62 Drywall / Joint Compound 6th Floor Office 600, Hall 600A NA ND
63, 64, 65 Covebase Mastic, Tan 5th Floor Outside Room 560, elevator, outside
515A
NA ND
66, 67, 68 Wallpaper Glue 5th Floor Outside Room 560, elevator, outside
515A
NA ND
69, 70, 71 Carpet Mastic Gold Hallway by elevators 5th Floor NA ND
72, 73, 74 Floor Tile 12” x 12” White with Yellow Mastic
5th Floor 5th Floor Outside Room 576, Outside Room 560-
Kitchen
NA ND
75, 76, 77 Floor Tile 12” x 12” Beige with Black Mastic 3rd
Floor 3rd Floor Outside Room 335, Outside Room 319 NA ND
78, 79, 80 Floor Tile 12” x 12” White and Blue with Yellow
Mastic 3rd Floor 3rd floor Room 374, Room 372 NA ND
81, 82, 83
Covebase Mastic, Tan, 2nd Floor
2nd Floor West Hall, by Men’s RR, Room 245 NA ND
84, 85, 86 Wallpaper and Glue 2nd Floor 2nd Floor Hall by Men’s RR, Room 265, Room
87, 88, 89 Laminate Floor, Woodgrain and Cream Mastic 1st Floor, Admin, Chapel NA ND of ACM Asbestos Type
90, 91, 92 12” x 12” Laminate Floor Marble with Cream
Mastic 1st Floor, Admin, Chapel NA ND
93, 94, 95 Covebase Mastic, Tan, First Floor 1st Floor, Admin, Chapel NA ND
96, 97, 98 Black Mastic under new flooring
Urgent Care Waiting Room – Non detect
Hall near Room 100 – ACM End of hall – Non detect
*HGS could not distinguish between the mastics, as all three samples of black mastics under the same tile appeared to be homogenous, therefore all black mastic in this particular area is assumed
ACM. Prior to renovation extra confirmation sampling for areas to be renovated must occur.
HGS believes all black mastic in the VA Building
1 is to be considered ACM.
NA
5% Chrysotile, Category 1 Non
Friable
NA = Not Applicable ND = None Detected
PLM Summary Report
Client :
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
1 Painted Built-up Roofing (White), Roll-on Membrane, Foam (White), Top #1 - 6th Floor Access Roof Field
None Detected - White Mastic
None Detected - Roof Membranes
None Detected - Roofing Tars
2 Painted Built-up Roofing (White), Roll-on, Foam (White) on Deck, Top # 2 - Roof Field
None Detected - White Mastic
None Detected - Roof Membranes
None Detected - Roofing Tars
None Detected - Underlayment
3 Painted Built-up Roofing (White), Roll-on, Foam (White) on Deck, Top # 2 - Roof Field
None Detected - White Mastic
None Detected - Roof Membranes
4 Flashing Mastic (Black / Grey) with Rubber Seal (Grey), Top # 1 - Roof at Parapet
5% Chrysotile - Flashing Material
5 Flashing Mastic (Black / Grey) with Rubber Seal (Grey), Top # 2 - Roof at Parapet
None Detected - Flashing Material
None Detected - Sealant
6 Flashing Mastic (Black / Grey) with Rubber Seal (Grey), Top # 2 - Roof at Parapet
None Detected - Flashing Material
7 Paver, Felt Moisture Barrier (Black), Foam Pink), Concrete Deck, Top # 3 - Roof Field, 5th Floor Access
None Detected - Felt
None Detected - Foam
8 Paver, Felt Moisture Barrier (Black), Foam Pink), Concrete Deck, Top # 4 - Roof Field, 2nd Floor Access
None Detected - Felt
None Detected - Foam
9 Paver, Felt Moisture Barrier (Black), Foam Pink), Concrete Deck, Top # 5 - Roof Field, 3rd Floor Access
None Detected - Felt
None Detected - Foam
10 Mastic (Back) on Flashing at Parapet Wall, Top # 3 - Roof at Parapet
None Detected - Mastic
11 Mastic (Back) on Flashing (Rubber) at Parapet Wall, Top #
None Detected - Mastic
None Detected - Rubber Membrane
12 Mastic (Back) on Flashing (Rubber) at Parapet Wall, Top #
None Detected - Mastic
13 Caulk on Flashing (White) at Parapet Wall, Top # 3 - at
Parapet
None Detected - Caulking
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
14 Caulk on Flashing (White) at Parapet Wall, Top # 4 - 2nd
Floor Access at Parapet
None Detected - Caulking
15 Caulk on Flashing (White) at Parapet Wall, Top # 5 - 3rd
Floor Access at Parapet
None Detected - Caulking
None Detected - Flashing Material
16 Roof, Equipment Flashing (Black), Top # 4 - 2nd Floor
Access Equipment
None Detected - Flashing
17 Roof, Equipment Flashing (Black), Top #5 - 3rd Floor
Access at Equipment
None Detected - Flashing
None Detected - Rubber Membrane
18 Roof, Equipment Flashing (Black), Top #4 - 2nd Floor
Access at Equipment
None Detected - Flashing
19 Roof Field, Built-up Roofing, Gravel, Top # 6 - 2nd Floor
Access
None Detected - Roofing Tars
None Detected - Roofing Felts
None Detected - Underlayment
20 Roof Field, Built-up Roofing, Gravel, Top # 6 - 2nd Floor
Access
None Detected - Roofing Tars
None Detected - Roofing Felt 1
None Detected - Roofing Felt 2
None Detected - Underlayment
21 Roof Field, Built-up Roofing, Gravel, Top # 7 - 2nd Floor
Access
None Detected - Roofing Tars
None Detected - Roofing Felts
None Detected - Underlayment
22 Roof Field, Asphalt Roll on Torch Down, Top # 8 - 2nd
Floor Access
None Detected - Roof Membranes
None Detected - Roll Roofings
None Detected - Roofing Tar
None Detected - Underlayment
23 Roof Field, Asphalt Roll on Torch Down, Top # 8 - 2nd
Floor Access
None Detected - Roof Membranes
None Detected - Roll Roofings
None Detected - Roofing Tar
None Detected - Underlayment
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
24 Roof Field, Asphalt Roll on Torch Down, Top # 9 -(with
Dome), 2nd Floor Access
None Detected - Roof Membranes
None Detected - Roll Roofings
None Detected - Underlayment
None Detected - Foam Insulation
25 HVAC Mastic (White), Top # 10 - At AHU, Roof Top None Detected - Grey Mastic
None Detected - White Mastic
26 HVAC Mastic (White), Top # 10 - At AHU, Roof Top None Detected - Grey Mastic
None Detected - White Mastic
27 HVAC Mastic (White), Top # 10 - At AHU, Roof Top None Detected - Mastic
28 Drywall / Joint Compound, 8th Floor Elevator Mechanical
Room
None Detected - Drywall Material
None Detected - Paint
29 Drywall / Joint Compound, 8th Floor Elevator Mechanical
Room
None Detected - Drywall Material
None Detected - Texture / Joint Cmpd
30 Drywall / Joint Compound, 8th Floor Elevator Mechanical
Room
None Detected - Drywall Material
None Detected - Texture / Joint Cmpd
31 Texture on Concrete, 6th Floor Outside 609, 608 None Detected - Texture
32 Texture on Concrete, 6th Floor Outside 609, 608 None Detected - Plaster
None Detected - Texture
33 Texture on Concrete, 6th Floor Outside 609, 608 None Detected - Texture
34 TSI (White, Newer), 4th Floor 4073 Room None Detected - Thermal Insulation
None Detected - Paper / Foil Wrap
None Detected - White Mastic
35 TSI (White, Newer), 4th Floor 4073 Room None Detected - Thermal Insulation
None Detected - Paper / Foil Wrap
None Detected - White Mastic
36 TSI (White, Newer), 4th Floor 4073 Room None Detected - Thermal Insulation
None Detected - Paper / Foil Wrap
None Detected - White Mastic
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
37 Mastic (Black), Top Roof II None Detected - Black Mastic
38 Mastic (Black), Top Roof II None Detected - Roof Membrane
No Mastic
39 Mastic (Black), Top Roof II None Detected - Black Mastic
40 Fire Caulk (Red), Basement None Detected - Caulking
41 Fire Caulk (Red), Basement None Detected - Caulking
42 Fire Caulk (Red), Basement None Detected - Caulking
43 2' x 2' Drop Ceiling Tiles, Basement by Elevator None Detected - Acoustic Tile
44 2' x 2' Drop Ceiling Tiles, Basement by Elevator None Detected - Acoustic Tile
45 2' x 2' Drop Ceiling Tiles, Basement by Elevator None Detected - Acoustic Tile
47 HVAC Mastic (White), Basement by B3-B None Detected - Thermal Insulation
None Detected - Paper / Foil Wrap
None Detected - White Mastic
48 HVAC Mastic (White), Basement by B3-B None Detected - Thermal Insulation
None Detected - Paper / Foil Wrap
None Detected - White Mastic
49 HVAC Mastic (White), Basement by B3-B None Detected - Thermal Insulation
None Detected - Paper / Foil Wrap
None Detected - White Mastic
50 Window Glazing, Basement East End None Detected - Window Glazing
51 Vinyl Floor Tile (Green, Red, Brown, Tan) with Mastic
(Clear Grey) Thinset, Hallway 6th Floor at 609, Elevator
Solarium
None Detected - Flooring
None Detected - Fiber Backing
None Detected - Mastic
None Detected - Leveling Compound
52 Vinyl Floor Tile (Green, Red, Brown, Tan) with Mastic
(Clear Grey) Thinset, Hallway 6th Floor at 609, Elevator
Solarium
None Detected - Flooring
None Detected - Fiber Backing
None Detected - Mastic
None Detected - Leveling Compound
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
53 Vinyl Floor Tile (Green, Red, Brown, Tan) with Mastic
(Clear Grey) Thinset, Hallway 6th Floor at 609, Elevator
Solarium
None Detected - Flooring
None Detected - Mastic
None Detected - Leveling Compound
54 Wallpaper with Glue, Hallway 6th Floor at 609 Elevator, Hallway 6th Floor at 606, Elevator, Solarium
None Detected - Wall Covering
None Detected - Glue
55 Wallpaper with Glue, Hallway 6th Floor at 609 Elevator, Hallway 6th Floor at 606, Elevator, Solarium
None Detected - Wall Covering
None Detected - Glue
56 Wallpaper with Glue, Hallway 6th Floor at 609 Elevator, Hallway 6th Floor at 606, Elevator, Solarium
None Detected - Wall Covering
None Detected - Glue
57 Cove Base / Mastic, Hallway 6th Floor at 609, Elevator, Solarium
None Detected - Yellow Mastic
None Detected - Brown Mastic
58 Cove Base / Mastic, Hallway 6th Floor at 609, Elevator, Solarium
None Detected - Mastic
59 Cove Base / Mastic, Hallway 6th Floor at 609, Elevator, Solarium
None Detected - Mastic
60 Drywall with Joint Compound, Office 600 None Detected - Drywall Material
None Detected - Texture / Joint Cmpd
61 Drywall with Joint Compound, Hall at 600 A None Detected - Texture / Joint Cmpd
62 Drywall with Joint Compound, Office 600 None Detected - Drywall Material
None Detected - Paint / Texture
63 Cove Base Mastic (Tan), Outside 560 None Detected - Cove Base
None Detected - Mastic
64 Cove Base Mastic (Tan), By Elevator None Detected - Cove Base
None Detected - Mastic
65 Cove Base Mastic (Tan), Outside 515 A None Detected - Cove Base
None Detected - Mastic
66 Wallpaper Glue, Outside 560 None Detected - Wall Covering
None Detected - Glue
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
67 Wallpaper Glue, By Elevator None Detected - Wall Covering
No Glue
68 Wallpaper Glue, Outside 515 A Floor 5 None Detected - Wall Covering
None Detected - Glue
69 Carpet Mastic (Gold), Hall by Elevators 5th Floor None Detected - Mastic
70 Carpet Mastic (Gold), Hall by Elevators 5th Floor None Detected - Mastic
71 Carpet Mastic (Gold), Hall by Elevators 5th Floor None Detected - Mastic
72 12 x 12 Floor Tile (White) with Mastic (Yellow), Outside
None Detected - Floor Tile
None Detected - Yellow Mastic
73 12 x 12 Floor Tile (White) with Mastic (Yellow), Outside
None Detected - Floor Tile
None Detected - Yellow Mastic
74 12 x 12 Floor Tile (White) with Mastic (Yellow), Outside
560 Kitchen
None Detected - Floor Tile
None Detected - Yellow Mastic
75 12 x 12 Floor Tile (Beige) with Mastic (Black), Outside
None Detected - Floor Tile
None Detected - Black Mastic
76 12 x 12 Floor Tile (Beige) with Mastic (Black), Outside
None Detected - Floor Tile
None Detected - Black Mastic
77 12 x 12 Floor Tile (Beige) with Mastic (Black), Outside
None Detected - Floor Tile
None Detected - Black Mastic
78 12 x 12 Floor Tile (White and Blue) with Mastic (Yellow), None Detected - Floor Tile
None Detected - Yellow Mastic
79 12 x 12 Floor Tile (White and Blue) with Mastic (Yellow), None Detected - Floor Tile
None Detected - Yellow Mastic
80 12 x 12 Floor Tile (White and Blue) with Mastic (Yellow), None Detected - Floor Tile
None Detected - Yellow Mastic
None Detected - Black Mastic
81 Cove Base Mastic (Tan), West Hall None Detected - Cove Base
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
82 Cove Base Mastic (Tan), Hall by Men's Restroom None Detected - Cove Base
None Detected - Mastic
83 Cove Base Mastic (Tan), 245 None Detected - Cove Base
None Detected - Mastic
84 Wallpaper and Glue, Hall by Men's Restroom None Detected - Wall Covering
None Detected - Glue
85 Wallpaper and Glue, 265 None Detected - Wall Covering
None Detected - Glue
86 Wallpaper and Glue, 253 None Detected - Wall Covering
None Detected - Glue
87 Laminated Floor (Wood Grain), Hall by 016 None Detected - Flooring
None Detected - Mastic
88 Laminated Floor (Wood Grain), West Hall by Admin None Detected - Flooring
None Detected - Mastic
89 Laminated Floor (Wood Grain), Outside Chapel None Detected - Flooring
None Detected - Mastic
90 12 x 12 Laminated (Marble), West Hall by Admin None Detected - Flooring
None Detected - Mastic
91 12 x 12 Laminated (Marble), East Hall by Elevator None Detected - Flooring
None Detected - Mastic
92 12 x 12 Laminated (Marble), East Hall by Elevator None Detected - Flooring
None Detected - Mastic
93 Cove Base Mastic (Tan), Hall by 016 None Detected - Mastic
94 Cove Base Mastic (Tan), East Waiting Room None Detected - Cove Base
None Detected - Mastic
95 Cove Base Mastic (Tan), Outside Chapel None Detected - Cove Base
Project :
Project # :
Identification :
Test Method :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Not Provided
Asbestos, Bulk Sample Analysis
Sample Number Client Sample Description / Location Asbestos Content
Sample Date :
On 9/20/2016, ninety seven (97) bulk material samples were submitted by Lonnie Lyro of ATC Group Services, Inc. - Austin for asbestos analysis by
PLM/DS. The PLM Detail Report is attached; additional information may be found therein. The results are summarized below:
Lab Job No. :
Report Date :
16B-12044
09/12/2016
09/23/2016
NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Polarized Light Microscopy / Dispersion Staining (PLM/DS)
EPA Method 600 / R-93 / 116
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
96 Mastic (Black) under New, Urgent Care, Waiting Room None Detected - Cream Mastic
None Detected - Black Mastic
97 Mastic (Black) under New, Hall at 100 5% Chrysotile - Black Mastic
98 Mastic (Black) under New, Hall End Not Analyzed - Positive Stop
Kirsten Tye, Tommie SmithAnalyst(s):
Lab Director : Bruce Crabb Approved Signatory :
Thank you for choosing Moody Labs
Lab Manager : Heather Lopez Approved Signatory :
These samples were analyzed by layers. Quantification, unless otherwise noted, is performed by calibrated visual estimate. The test report shall not be reproduced, except in full, without written approval of the laboratory. The results relate only to the items tested. These test results do not imply endorsement by NVLAP or any agency of the U.S.
Government. Accredited by the National Voluntary Laboratory Accreditation Program for Bulk Asbestos Fiber Analysis under Lab Code 102056-0.
PLM Detail Report
Project # : Not Provided
Sample Number Layer Components % Of
Sample
Analysis
Date
% of
Layer Analyst
Supplement to PLM Summary Report
Client :
Project :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Lab Job No. :
Report Date :
16B-12044
09/23/2016
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
Moody Labs NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Pigment / Binders1 White Mastic (Off-White) 5% 09/21100% TS
Sand1 Sand (Tan) 10% 09/21100% TS
Synthetic Fibers1 Roof Membranes (Black) 50% 09/2110% TS
Calcite1 Roof Membranes (Black) 50% 09/2130% TS
Tar Binders1 Roof Membranes (Black) 50% 09/2160% TS
Cellulose Fibers1 Roofing Tars (Black) 35% 09/213% TS
Calcite / Tar Binders1 Roofing Tars (Black) 35% 09/2197% TS
Pigment / Binders2 White Mastic (Off-White) 5% 09/21100% TS
Sand2 Sand (Tan) 10% 09/21100% TS
Synthetic Fibers2 Roof Membranes (Black) 50% 09/2110% TS
Calcite2 Roof Membranes (Black) 50% 09/2130% TS
Tar Binders2 Roof Membranes (Black) 50% 09/2160% TS
Cellulose Fibers2 Roofing Tars (Black) 25% 09/213% TS
Calcite / Tar Binders2 Roofing Tars (Black) 25% 09/2197% TS
Cellulose Fibers2 Underlayment (Tan) 10% 09/2180% TS
Perlite2 Underlayment (Tan) 10% 09/2120% TS
Pigment / Binders3 White Mastic (Off-White) 5% 09/21100% TS
Sand3 Sand (Tan) 15% 09/21100% TS
Synthetic Fibers3 Roof Membranes (Black) 80% 09/2110% TS
Calcite3 Roof Membranes (Black) 80% 09/2130% TS
Tar Binders3 Roof Membranes (Black) 80% 09/2160% TS
Chrysotile4 Flashing Material (Black) 100% 09/215% TS
Calcite4 Flashing Material (Black) 100% 09/2130% TS
Tar Binders4 Flashing Material (Black) 100% 09/2165% TS
Cellulose Fibers5 Flashing Material (Black) 75% 09/215% TS
Calcite5 Flashing Material (Black) 75% 09/2125% TS
Tar Binders5 Flashing Material (Black) 75% 09/2170% TS
Binders / Fillers5 Sealant (Black) 25% 09/21100% TS
Calcite6 Flashing Material (Black) 100% 09/2130% TS
Tar Binders6 Flashing Material (Black) 100% 09/2170% TS
Sample Number Layer Components % Of
Sample
Analysis
Date
% of
Layer Analyst
Supplement to PLM Summary Report
Client :
Project :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Lab Job No. :
Report Date :
16B-12044
09/23/2016
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
Moody Labs NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Synthetic Fibers7 Felt (Black) 90% 09/2140% TS
Cellulose Fibers7 Felt (Black) 90% 09/2145% TS
Tar Binders7 Felt (Black) 90% 09/2115% TS
Synthetic Foam7 Foam (Pink) 10% 09/21100% TS
Synthetic Fibers8 Felt (Black) 90% 09/2185% TS
Tar Binders8 Felt (Black) 90% 09/2115% TS
Synthetic Foam8 Foam (Pink) 10% 09/21100% TS
Synthetic Fibers9 Felt (Black) 90% 09/2185% TS
Tar Binders9 Felt (Black) 90% 09/2115% TS
Synthetic Foam9 Foam (Pink) 10% 09/21100% TS
Calcite10 Mastic (Black) 100% 09/2120% TS
Tar Binders10 Mastic (Black) 100% 09/2180% TS
Calcite / Tar Binders11 Mastic (Black) 25% 09/21100% TS
Rubber Binders11 Rubber Membrane (Black) 75% 09/21100% TS
Calcite12 Mastic (Black) 100% 09/2130% TS
Tar Binders12 Mastic (Black) 100% 09/2170% TS
Binders / Fillers13 Caulking (White) 100% 09/21100% TS
Binders / Fillers14 Caulking (White) 100% 09/21100% TS
Binders / Fillers15 Caulking (White) 75% 09/21100% TS
Calcite15 Flashing Material (Black) 25% 09/2130% TS
Tar Binders15 Flashing Material (Black) 25% 09/2170% TS
Synthetic Fibers16 Flashing (Black) 100% 09/2110% TS
Calcite16 Flashing (Black) 100% 09/2130% TS
Tar Binders16 Flashing (Black) 100% 09/2160% TS
Calcite / Tar Binders17 Flashing (Black) 50% 09/21100% TS
Rubber Binders17 Rubber Membrane (Black) 50% 09/21100% TS
Synthetic Fibers18 Flashing (Black) 100% 09/2210% TS
Calcite18 Flashing (Black) 100% 09/2230% TS
Tar Binders18 Flashing (Black) 100% 09/2260% TS
Sample Number Layer Components % Of
Sample
Analysis
Date
% of
Layer Analyst
Supplement to PLM Summary Report
Client :
Project :
ATC Group Services, Inc. - Austin
VA-Big Springs, TX - Bldg 1, 300 Veterans, Big Springs
Lab Job No. :
Report Date :
16B-12044
09/23/2016
2051 Valley View Lane
Farmers Branch, TX 75234 Phone: (972) 241-8460
Moody Labs NVLAP Lab Code 102056-0
TDSHS License No. 30-0084
Aggregate19 Aggregate (Tan) 15% 09/22100% TS
Tar Binders19 Roofing Tars (Black) 30% 09/22100% TS
Cellulose Fibers19 Roofing Felts (Black) 30% 09/2285% TS
Tar Binders19 Roofing Felts (Black) 30% 09/2215% TS
Cellulose Fibers19 Underlayment (Tan) 25% 09/2280% TS
Perlite19 Underlayment (Tan) 25% 09/2220% TS
Tar Binders20 Roofing Tars (Black) 35% 09/22100% TS
Cellulose Fibers20 Roofing Felt 1 (Black) 30% 09/2285% TS
Tar Binders20 Roofing Felt 1 (Black) 30% 09/2215% TS
Glass Wool Fibers20 Roofing Felt 2 (Black) 5% 09/2245% TS
Tar Binders20 Roofing Felt 2 (Black) 5% 09/2255% TS
Cellulose Fibers20 Underlayment (Tan) 30% 09/2280% TS
Perlite20 Underlayment (Tan) 30% 09/2220% TS
Aggregate21 Aggregate (Tan) 15% 09/22100% TS
Tar Binders21 Roofing Tars (Black) 30% 09/22100% TS
Cellulose Fibers21 Roofing Felts (Black) 30% 09/2285% TS
Tar Binders21 Roofing Felts (Black) 30% 09/2215% TS
Cellulose Fibers21 Underlayment (Tan) 25% 09/2280% TS
Perlite21 Underlayment (Tan) 25% 09/2220% TS
Sand22 Sand Layer (Off-White) 2% 09/21100% KT
Synthetic Fibers22 Roof Membranes (Black) 68% 09/2110% KT
Sand22 Roof Membranes (Black) 68% 09/215% KT
Calcite / Tar Binders22 Roof Membranes (Black) 68% 09/2185% KT
Glass Wool Fibers22 Roll Roofings (Black) 15% 09/2115% KT
Aggregate22 Roll Roofings (Black) 15% 09/2120% KT
Calcite / Tar Binders22 Roll Roofings (Black) 15% 09/2165% KT
Tar Binders22 Roofing Tar (Black) 10% 09/21100% KT
Wood Fibers22 Underlayment…