This is a General Decision wage determination document for building construction projects in Howard County, Texas, effective 07/18/2025. The document specifies prevailing wage rates for multiple construction trade classifications under the Davis-Bacon Act, with hourly rates ranging from $8.03 for common laborers to $33.23 for asbestos workers/heat & frost insulators. Key details include provisions for workers under Executive Orders 14026 and 13658, which mandate minimum wage rates of $17.50 and $13.30 per hour respectively, depending on the contract's date of entry.

The wage determination includes detailed rate information for various trades such as boilermakers ($33.17/hour), ironworkers ($29.64/hour), plumbers ($28.64/hour), and numerous other classifications like electricians, carpenters, cement masons, and equipment operators. The document also outlines a wage determination appeals process and provides guidance on how interested parties can request reviews or submit inquiries to the U.S. Department of Labor's Wage and Hour Division. Additionally, it includes notes about paid sick leave requirements for federal contractors and provisions for unlisted job classifications that may be added after contract award.

View the file

Other files

File Type Posted
Redacted Abstract of Bids OF 1419 - Big Spring EHRM Tier 2 Data Ctr.pdf PDF
Tech Questions Tracker - Big Spring EHRM 2-2-26.pdf PDF
36C77626B0001 0008.pdf PDF
36C77626B0001 0007.docx DOCX document
Brand Name Justification - Big Spring EHRM_Redacted.pdf PDF
36C77626B0001 0006.docx DOCX document
Howard County Bldg Construction 1-2-2026.pdf PDF
36C77626B0001 0005.docx DOCX document
087100 - Addendum 01.pdf PDF
AE300 - Addendum 01.pdf PDF
GC201a - Addendum 01.pdf PDF
2022-12-23 VA BSP EHRM Contract Documents Drawings.pdf PDF
Asbestos and Lead Based Paint Photolog Building 1 Final.pdf PDF
Asbestos Management Plan Building 1 Final.pdf PDF
Howard County Bldg Construction 12-12-2025.pdf PDF
000110 - Addendum 01.pdf PDF
Asbestos Survey Report September 2016 Building 1.pdf PDF
02 82 11.01 - Addendum 01.pdf PDF
Lead Inspection Report Building 1 Final.pdf PDF
Tech Questions Tracker - Big Spring EHRM 12-31-2025.pdf PDF
36C77626B0001 0004.docx DOCX document
36C77626B0001 0003.docx DOCX document
36C77626B0001 0002.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
36C77626B0001 0001.docx DOCX document
ICRA_Tier_2_Data_Center.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
VA_BSP Data Center Bid Resubmission - Drawings.pdf PDF
36C77626B0001_1.docx DOCX document
Site Visit Instructions.docx DOCX document
Spec 01 31 00.01 Project Management and Coordination.docx DOCX document
VA_BSP Data Center Bid Resubmission - Spec Vol 2.pdf PDF
VA.BSP Data Center Bid Resubmission - Spec Vol 1.pdf PDF
PCRA_Tier_2_Data_Center.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .