This document is a Table of Contents for the Department of Veterans Affairs (VA) Master Specifications for the West Texas VA Health Care System Data Center project (VA Project No.: 519-23-908), dated December 8, 2025. The comprehensive specifications cover multiple construction divisions, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood, Thermal and Moisture Protection, Openings, Finishes, Specialties, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, and other related technical areas.

The document provides a detailed breakdown of specification sections across 28 divisions, with each section including a specific date of revision ranging from 05-15 to 12-23. Key technical areas of focus include seismic restraint, fire suppression systems, electrical installations, communications infrastructure, access control systems, and various building construction and systems requirements. The specifications appear to be for a comprehensive data center construction project with extensive technical and systems integration requirements.

View the file

Other files

File Type Posted
Redacted Abstract of Bids OF 1419 - Big Spring EHRM Tier 2 Data Ctr.pdf PDF
Tech Questions Tracker - Big Spring EHRM 2-2-26.pdf PDF
36C77626B0001 0008.pdf PDF
36C77626B0001 0007.docx DOCX document
Brand Name Justification - Big Spring EHRM_Redacted.pdf PDF
36C77626B0001 0006.docx DOCX document
Howard County Bldg Construction 1-2-2026.pdf PDF
36C77626B0001 0005.docx DOCX document
Asbestos Survey Report September 2016 Building 1.pdf PDF
02 82 11.01 - Addendum 01.pdf PDF
Lead Inspection Report Building 1 Final.pdf PDF
Tech Questions Tracker - Big Spring EHRM 12-31-2025.pdf PDF
36C77626B0001 0004.docx DOCX document
087100 - Addendum 01.pdf PDF
AE300 - Addendum 01.pdf PDF
GC201a - Addendum 01.pdf PDF
2022-12-23 VA BSP EHRM Contract Documents Drawings.pdf PDF
Asbestos and Lead Based Paint Photolog Building 1 Final.pdf PDF
Asbestos Management Plan Building 1 Final.pdf PDF
Howard County Bldg Construction 12-12-2025.pdf PDF
36C77626B0001 0003.docx DOCX document
36C77626B0001 0002.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
36C77626B0001 0001.docx DOCX document
PCRA_Tier_2_Data_Center.pdf PDF
ICRA_Tier_2_Data_Center.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
VA_BSP Data Center Bid Resubmission - Drawings.pdf PDF
Howard County Bldg Construction 7-18-2025.pdf PDF
36C77626B0001_1.docx DOCX document
Site Visit Instructions.docx DOCX document
Spec 01 31 00.01 Project Management and Coordination.docx DOCX document
VA_BSP Data Center Bid Resubmission - Spec Vol 2.pdf PDF
VA.BSP Data Center Bid Resubmission - Spec Vol 1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

West Texas VA Health Care System Addendum 01

Data Center December 8, 2025

VA Project No.: 519-23-908

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-21

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21

01 33 23 Shop Drawings, Product Data, and Samples 11-23

01 35 26 Safety Requirements for Major Projects 12-23

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 02-21

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 06-21

01 57 19 Temporary Environmental Controls 01-21

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 04-22

01 91 00 General Commissioning Requirements 04-22

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 01-21

02 82 11.01 Hazardous Material Survey Report

02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 01-21

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 01-21

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 40 00 Cold-Formed Metal Framing 01-21

05 50 00 Metal Fabrications 08-18

00 01 10-2

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 16 63 Cementitious Sheathing 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 08 00 Facility Exterior Closure Commissioning 01-21

07 21 13 Thermal Insulation 01-21

07 21 23 Loose-Fill Insulation 01-21

07 81 00 Applied Fireproofing 07-23

07 84 00 Firestopping 01-21

07 92 00 Joint Sealants 04-22

07 95 13 Expansion Joint Cover Assemblies 01-21

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21

08 14 00 Interior Wood Doors 01-21

08 17 10 Integrated Door Assemblies 01-21

08 31 13 Access Doors and Frames 04-22

08 71 00 Door Hardware 05-22

08 71 13.11 Low Energy Power Assist Door Operators 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21

09 06 00 Schedule for Finishes 01-21

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 01-21

09 65 16 Resilient Sheet Flooring 06-22

09 65 19 Resilient Tile Flooring 05-18

09 65 36.13 Static Dissipative Resilient Tile Flooring

09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 12-21

09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21

10 26 00 Wall and Door Protection 01-21

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

00 01 10-3

DIVISION 12 – FURNISHINGS

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-21

DIVISION 14– CONVEYING EQUIPEMENT

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

21-22-00 Clean Agent Fire Suppression Systems 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 01-23

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 05-21

22 13 00 Facility Sanitary and Vent Piping 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 03-23

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

03-23

23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23

23 08 00 Commissioning of HVAC Systems 03-23

23 09 23 Direct-Digital Control System

23 23 00 Refrigerant Piping 03-23

23 31 00 HVAC Ducts and Casings 03-23

23 34 00 HVAC Fans 03-23

23 81 00 Decentralized Unitary HVAC Equipment 03-23

23 81 23 Computer-Room Air-Conditioners 03-23

23 81 43 Air-Source Unitary Heat Pumps 03-23

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 11-22

26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22

26 05 26 Grounding and Bonding for Electrical Systems 11-22

00 01 10-4

26 05 33 Raceway and Boxes for Electrical Systems 11-22

26 05 73 Overcurrent Protective Device Coordination Study 11-22

26 22 00 Low-Voltage Transformers 11-22

26 24 16 Panelboards 11-22

26 27 26 Wiring Devices 11-22

26 29 21 Enclosed Switches and Circuit Breakers 11-22

26 33 53 Static Uninterruptible Power Supply 11-22

26 43 13 Surge Protective Devices 11-22

26 51 00 Interior Lighting 11-22

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 07-23

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Telecommunications Room Fittings 06-15

27 11 26 Communication Rack Mounted Power Protection And Power

Strips

05-24

27 13 23 Communications Optical Fiber Backbone Cabling 08-23

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 13 00 Physical Access Control System 10-11

28 16 00 Intrusion Detection System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 – UTILITIES

DIVISION 34 – TRANSPORTATION

DIVISION 48 – Electrical Power Generation