GC201a - Addendum 01.pdf

PDF 209 KB Posted

Attached to
Z2DA--519-23-908 EHRM Tier 2 Data Center Construction - Big Spring
Solicitation number
36C77626B0001
Issued by

About this file

This document is a construction phasing plan for the VA Big Spring Data Center located in West Texas. The architectural drawing details a three-phase renovation strategy for Building 1's first floor, with specific requirements for each construction phase. Key phasing notes include: construction of temporary barriers, selective demolition, and construction work in designated areas while minimizing disruption to ongoing VA operations. Each phase requires temporary construction barriers, protection devices, and must maintain operational continuity for adjacent areas. The contractor must coordinate the phasing plan with the VA Contracting Officer's Representative (COR), submit detailed sequencing plans, and conduct most work after hours to reduce operational interruptions. The project involves the U.S. Department of Veterans Affairs and is managed by the Office of Construction and Facilities Management, with consultants including Huitt-Zollars, ECS Southwest, CB Design Group, and OCMI, Inc. The project number is 519-23-908, with an issue date of 07/18/2025 and a bid resubmission dated 11/16/23.

View the file

Other files

File Type Posted
Redacted Abstract of Bids OF 1419 - Big Spring EHRM Tier 2 Data Ctr.pdf PDF
Tech Questions Tracker - Big Spring EHRM 2-2-26.pdf PDF
36C77626B0001 0008.pdf PDF
36C77626B0001 0007.docx DOCX document
Brand Name Justification - Big Spring EHRM_Redacted.pdf PDF
36C77626B0001 0006.docx DOCX document
Howard County Bldg Construction 1-2-2026.pdf PDF
36C77626B0001 0005.docx DOCX document
087100 - Addendum 01.pdf PDF
AE300 - Addendum 01.pdf PDF
2022-12-23 VA BSP EHRM Contract Documents Drawings.pdf PDF
Asbestos and Lead Based Paint Photolog Building 1 Final.pdf PDF
Asbestos Management Plan Building 1 Final.pdf PDF
Asbestos Survey Report September 2016 Building 1.pdf PDF
Howard County Bldg Construction 12-12-2025.pdf PDF
000110 - Addendum 01.pdf PDF
02 82 11.01 - Addendum 01.pdf PDF
Lead Inspection Report Building 1 Final.pdf PDF
Tech Questions Tracker - Big Spring EHRM 12-31-2025.pdf PDF
36C77626B0001 0004.docx DOCX document
36C77626B0001 0003.docx DOCX document
36C77626B0001 0002.docx DOCX document
Site Visit Sign In Sheet.pdf PDF
36C77626B0001 0001.docx DOCX document
ICRA_Tier_2_Data_Center.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
VA_BSP Data Center Bid Resubmission - Drawings.pdf PDF
Howard County Bldg Construction 7-18-2025.pdf PDF
36C77626B0001_1.docx DOCX document
PCRA_Tier_2_Data_Center.pdf PDF
Site Visit Instructions.docx DOCX document
Spec 01 31 00.01 Project Management and Coordination.docx DOCX document
VA_BSP Data Center Bid Resubmission - Spec Vol 2.pdf PDF
VA.BSP Data Center Bid Resubmission - Spec Vol 1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXTERIOR

OFFICE

96D

OFFICE

96E

TELEPHONE

SWITCH BOARD /

IRM

SUPPLY RM IRM

96A

EQUINOX RM IRM

FILE ROOM

RELEASE OF

INFORMATION

CHIEF HIMS

100A

STORAGE

PHARMACY CHIEF

SEC Y

91C

ROOM

WOMEN REST RM

96C

MEN REST RM

96B

PHASE 1

PHASE 1

PHASE 2

PHASE 3

N

BUILDING

NORTH

KEY PLAN

BUILDING 1

SCALE: NTS

1. EXISTING CONDITION DRAWINGS IS FOR REFERENCE ONLY. CONTRACTOR SHALL

VERIFY LOCATION OF ALL TEMS SHOWN ON THIS SHEET PRIOR TO BEGINNING OF

WORK.

GENERAL EXISTING PLAN NOTES

PHASING NOTES

1 PHASE 1 INCLUDES THE FOLLOWING WORK:

1. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT

PROTECTION DEVICES AS NEEDED TO PROTECT OCCUPANTS OF ADJACENT

AREA FROM CONSTRUCTION ACTIVIES.

2. SELECTIVE DEMOLITION OF PHASE 1.

3. CONTRUCTION OF ALL WORK DESIGNATED AS PHASE 1 ON THIS PLAN. REFER

TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR WORK TO OCCUR

WITHIN THESE AREA. ALL AREA OUTSIDE OF PHASE 1 SHALL REMAIN

OPERATIONAL UNTIL PHASE 1 IS COMPLETE. DO NOT START ANY WORK ON

PHASE 2 UNTIL AUTHORIZED BY COR.

4. UPON APPROVAL OF PHASE 1 WORK BY THE COR, REMOVE TEMPORARY

CONSTRUCTION BARRIER. RESTORE AREAS IMPACTED BY CONSTRUCTION

BARRIER TO LIKE NEW CONDITION.

2. PHASE 2 INCLUDES THE FOLLOWING WORK:

1. DECONSTRUCTION OF PHASE 1 TEMPORARY CONSTRUCTION BARRIERS.

2. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT

PROTECTION DEVICES AS NEEDED TO PROTECT OCCUPANTS OF ADJACENT

AREA FROM CONSTRUCTION ACTIVIES.

3. SELECTIVE DEMOLITION OF PHASE 2.

4. CONTRUCTION OF ALL WORK DESIGNATED AS PHASE 2 ON THIS PLAN. REFER

TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR WORK TO OCCUR

WITHIN THESE AREA. ALL AREA OUTSIDE OF PHASE 1 SHALL REMAIN

OPERATIONAL UNTIL PHASE 1 IS COMPLETE. DO NOT START ANY WORK ON

PHASE 2 UNTIL AUTHORIZED BY COR.

5. UPON APPROVAL OF PHASE 2 WORK BY THE COR, REMOVE TEMPORARY

CONSTRUCTION BARRIER. RESTORE AREAS IMPACTED BY CONSTRUCTION

BARRIER TO LIKE NEW CONDITION.

3. PHASE 3 INCLUSES THE FOLLOWING WORK:

1. DECONSTRUCTION OF PHASE 2 TEMPORARY CONSTRUCTION BARRIERS.

2. CONSTRUCTION OF TEMPORARY CONSTRUCTION BARRIERS AND ABATEMENT

PROTECTION DEVICES AS NEEDED TO PROTECT OCCUPANTS OF ADJACENT

AREA FROM CONSTRUCTION ACTIVIES.

3. SELECTIVE DEMOLITION OF PHASE 3.

4. CONTRUCTION OF ALL WORK DESIGNATED AS PHASE 3 ON THIS PLAN. REFER

TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS FOR WORK TO OCCUR

WITHIN THESE AREA. ALL AREA OUTSIDE OF PHASE 2 SHALL REMAIN

OPERATIONAL UNTIL PHASE 3 IS COMPLETE.

5. UPON APPROVAL OF PHASE 3 WORK BY THE COR, REMOVE TEMPORARY

CONSTRUCTION BARRIER. RESTORE AREAS IMPACTED BY CONSTRUCTION

BARRIER TO LIKE NEW CONDITION.

4. AT THE COMPLETION OF EACH PHASE, THE FACILITY SHALL BE ABLE TO FULLY USE SUCH

PHASED SPACE. UPON ACCEPTANCE BY THE COR. THE CONTRACTOR SHALL TURN OVER

THE COMPLETE PHASE WORK TO THE FACILITY AND THE END USER AS THE FINAL

PRODUCT, WITH ALL ASPECTS OF CONSTRUCTION AN FINISHES COMPLETED AND

ACCEPTED BY THE COR.

1. GENERAL CONTRACTOR SHALL COORDINATE AND FINALIZE CONSTRUCTION PHASING

PLAN WITH VA COR PRIOR TO COMMENCEMENT OF CONSTRUCTION.

2. REFER TO DEMOLITION PLANS (ARCHITECTURAL, STRUCTURAL, AND MEP) FOR PHASED

DEMOLITION INFORMATION.

3. CONTRACTOR SHALL SUBMIT A PHASING PLAN INDICATING PRIMARY PHASES AND SUB-

PHASES AS MAY BE REQUIRED TO PROPERLY SEQUENCE THE ENTIRE PROJECT.

PHASING SHALL MINIMIZE IMPACT TO ONGOING VA OPERATIONS IN THE OCCUPIED AREAS

OF THE BUILDING WHERE CONSTRUCTION ACTIVITIES ARE TO OCCUR.

4. PROVIDE TEMPORARY SIGNAGE AND CONSTRUCTION BARRIERS AS NECESSARY TO

ALERT AND PROJECT BUILDING OCCUPANTS IN AREAS OUTSIDE THE CONSTRUCTION

ZONE. TEMPORARY CONSTRUCTION BARRIERS SHALL COMPLY WITH REQUIREMENTS OF

ICRA. SEE GC400 SERIES.

5. ALL CONSTRUCTION WORK WILL BE CONDUCT ED AFTER HOURS TO AVOID MINIMUM

INTERRUPTIONS TO ONGOING OPERATIONS, UNLESS NOTED OTHERWISE.

GENERAL PHASING NOTES

PHASE 1 CONSTRUCTION

PHASING PLAN LEGEND

PHASE 2 CONSTRUCTION

PHASE 3 CONSTRUCTION

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

CONSULTANT:

HUITT - ZOLLARS

500 WEST 7TH ST. STE 700

FORT WORTH, TX 76102

817-335-3000

CONSULTANT:

ECS SOUTHWEST

3033 KELLWAY DR. #100

CARROLTON, TX 75006

281-814-2502

ARCHITECT:

CB DESIGN GROUP

421 KING ST.

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

PROFESSIONAL SEAL:

2345678910111213141516

B

C

D

E

F

G

H

J

K

12345678910111213141516

CONSULTANT:

OCMI, INC.

6110 EXECUTIVE BLVD.

STE 440

ROCKVILLE, MD 20852

202-450-3843

07/18/2025

519-23-908

JSKJ

VA BIG SPRING DATA CENTER

BID RESUBMISSION

BUILDING 1 - 1ST FLOOR - ENLARGED

PHASING PLAN

GC201a

-2

-9

G C a

/1

/2

.p d f

West Texas VAHCS 300 Veterans Blvd.

Big Spring, TX 79720

1/4" = 1'-0"A14

BUILDING 1 - 1ST FLOOR - ENLARGED PHASING PLAN

N

BUILDING

NORTH

# REVISION DATE

1 ADDENDUM 01 12/08/2025

Sheets
GC201a - BUILDING 1 - 1ST FLOOR - ENLARGED PHASING PLAN

File details come from the government source that posted it. Updated .