(USS ROSS) Attachment J-10 Open and Inspect Milestone Reports 26AUG2021.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-21-R-4422
Issued by

About this file

This solicitation seeks proposals for the USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA) to be performed from July 2022 through November 2023. The Naval Sea Systems Command will award a single-award, cost-plus-fixed-fee contract for maintenance, modernization, and repair work. Interested parties must register in the System for Award Management and the Procurement Integrated Enterprise Environment to receive solicitation attachments and submit proposals, with proposals due in July 2022. The work includes over 200 maintenance items and will be performed at East or Gulf Coast facilities. The contractor must have extensive shipyard capabilities and qualified personnel to complete all required work during the 16-month period of performance.

View the file

Other files

File Type Posted
USS ROSS_QA 4.xlsx XLSX spreadsheet
N00024-22-R-4422-0004 Conformed.pdf PDF
N00024-22-R-4422-0004.pdf PDF
USS ROSS_QA 3.xlsx XLSX spreadsheet
N00024-22-R-4422-0003 Conformed.pdf PDF
N00024-22-R-4422-0003.pdf PDF
N00024-22-R-4422-0002 Conformed.pdf PDF
N00024-22-R-4422-0002.pdf PDF
USS ROSS_QA 2.xlsx XLSX spreadsheet
USS ROSS_QA 1.xlsx XLSX spreadsheet
N00024-22-R-4422-0001.pdf PDF
N00024-22-R-4422-0001 Conformed.pdf PDF
(USS ROSS) CDRL Exhibit B - 19AUG21.pdf PDF
(USS ROSS) Attachment J-5 Quality Assurance Surveillance Plan - 27Jul21.docx DOCX document
(USS ROSS) Attachment S-3 Pre-Proposal Information (PPI) Form - 7Sep21.xlsx XLSX spreadsheet
N00024-22-R-4422.docx DOCX document
(USS ROSS) Attachment J-8 Government Furnished Material (GFM) List - 28Jan22.xlsx XLSX spreadsheet
USS ROSS Attachment J-7 IPTD Events and SMR - 22Oct21.docx DOCX document
USS ROSS Attachment S-7 Proposal Assessment - 28Jan22.xlsx XLSX spreadsheet
(USS ROSS) (DDG 71) Attachment S-5 Eligibility Criteria Data Sheet - 26Jul21.docx DOCX document
(USS ROSS) CDRL Exhibit A - 19Aug21.pdf PDF
(USS ROSS) Attachment S-9 Past Performance Questionnaire - 7Sep21.docx DOCX document
(USS ROSS) CDRL Exhibit C - 19AUGl21.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prioritized List

USS ROSS (DDG 71) FY22 EDSRA - J-10 Milestone Reports Due
No.Work ItemTitlePara.Milestone
110-11-001Underwater Hull; inspect and repair3.2.120% O&I Docking
3.4.120% O&I Docking
113-11-001Drain Well; repair3.4.2.820% O&I Docking
123-10-002Auxiliary Machinery Room Number One Bilge; repair3.4.120% O&I Docking
3.5.120% O&I Docking
123-11-002Compensated Fuel Tank; repair3.2.120% O&I Docking
123-11-004Fuel Oil Service and Gravity Head Tank; repair3.1.120% O&I Docking
3.2.120% O&I Docking
123-15-002Controllable Pitch Propeller Hydraulic Oil Sump Tank; repair3.1.120% O&I Docking
123-19-001Waste Water Tank; repair3.2.120% O&I Docking
123-21-001Accessible Void; repair3.2.120% O&I Docking
123-22-002Chain Locker and Chain Locker Sump; repair3.2.120% O&I Docking
161-11-001Strut; repair3.1.120% O&I Docking
163-11-001Sea Chest; inspect and repair3.3.2.120% O&I Docking
3.4.1.120% O&I Docking
165-11-001Sonar Dome Pressurization System Valve; repair and replace3.2.720% O&I Docking
165-11-002Sonar Dome Rubber Window (SDRW); inspect and repair3.5.3.920% O&I Docking
3.720% O&I Docking
167-11-001Scuttle Lower Sonar Dome; repair3.1.120% O&I Docking
3.2.2.220% O&I Docking
243-11-002Starboard Stern Tube Shaft Seal; overhaul3.2.2.120% O&I Docking
243-11-003Starboard Waterborne Propulsion Shafting; install3.1.120% O&I Docking
243-12-002Port Stern Tube Shaft Seal; overhaul3.2.2.120% O&I Docking
243-12-003Port Waterborne Propulsion Shafting; install3.1.120% O&I Docking
244-10-002Stern Tube and Strut Bearing Strap; install (OPTION ITEM)3.1.320% O&I Docking
3.2.320% O&I Docking
244-11-001Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish3.1.420% O&I Docking
3.2.3.220% O&I Docking
3.3.220% O&I Docking
3.3.3.120% O&I Docking
3.6.6.120% O&I Docking
244-12-001Port Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish3.1.420% O&I Docking
3.2.3.220% O&I Docking
3.3.220% O&I Docking
3.3.3.120% O&I Docking
3.6.6.120% O&I Docking
245-11-001Number One Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish3.2.220% O&I Docking
3.4.120% O&I Docking
3.5.120% O&I Docking
3.7.320% O&I Docking
3.9.720% O&I Docking
245-11-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair3.2.1.120% O&I Docking
3.2.2.320% O&I Docking
3.2.4.120% O&I Docking
3.3.1.120% O&I Docking
3.3.2.420% O&I Docking
3.3.4.120% O&I Docking
245-11-004Controllable Pitch Propeller (CPP) Standby Hydraulic Pump Number One Mechanical Seal and Shaft Coupling; install3.2.120% O&I Docking
245-12-002Number 2 Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish3.2.220% O&I Docking
3.4.120% O&I Docking
3.5.120% O&I Docking
3.7.320% O&I Docking
3.9.720% O&I Docking
245-12-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair3.2.1.120% O&I Docking
3.2.2.320% O&I Docking
3.2.4.120% O&I Docking
3.3.1.120% O&I Docking
3.3.2.420% O&I Docking
3.3.4.120% O&I Docking
245-12-004Controllable Pitch Propeller (CPP) Standby Hydraulic Pump Number 2 Mechanical Seal and Shaft Coupling; install3.2.120% O&I Docking
442-10-001TR-232B/WQC-2A and TR-233B/WQC-2A Transducer Cabling; install3.1.2.120% O&I Docking
3.3.120% O&I Docking
462-08-001DT-513/BQA-8 Hydrophone and Cable Assembly; install3.1.2.120% O&I Docking
463-89-001AN/SQQ-89 Sonar Transducer and Stave Cable Connectorized; install3.5.120% O&I Docking
3.5.2.120% O&I Docking
3.5.4.120% O&I Docking
3.5.5.320% O&I Docking
520-11-001Sea Valve and Waster Sleeve; repair and install3.2.1.120% O&I Docking
562-11-001Starboard Rudder, inspect and repair3.1.3.120% O&I Docking
3.3.220% O&I Docking
3.4.120% O&I Docking
562-11-002Port Rudder; inspect and repair3.1.3.120% O&I Docking
3.3.220% O&I Docking
3.4.120% O&I Docking
562-11-003Rudder Bearing Seal and Rudderstock Seal; repair3.2.3.120% O&I Docking
631-31-001Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish3.1.120% O&I Docking
3.3.120% O&I Docking
631-41-001Freeboard; preserve3.1.120% O&I Docking
633-21-001Impressed Current Cathodic Protection (ICCP) System; inspect and repair3.1.120% O&I Docking
3.2.220% O&I Docking
3.4.320% O&I Docking
3.5.320% O&I Docking
997-11-001Drydocking and Undocking; accomplish3.3.120% O&I Docking
3.7.1.520% O&I Docking
122-20-001Number 3 Generator Room; repair3.3.120% O&I/High Pri
3.4.420% O&I/High Pri
122-20-002Auxiliary Machinery Room Number One Transverse Bulkhead; inspect and repair3.3.420% O&I/High Pri
123-12-002JP-5 Tank; repair3.1.120% O&I/High Pri
123-15-001Lube Oil Tank; repair3.2.120% O&I/High Pri
123-17-002Contaminated Oil Tank; repair3.2.120% O&I/High Pri
123-19-004Vacuum, Collection, Holding and Transfer (VCHT) Tank; repair3.2.120% O&I/High Pri
150-80-001AER DDG51-83007D, Increase Deck Plate Thickness; accomplish (partial)3.1.120% O&I/High Pri
167-11-004Hatch Hold Back Device; repair3.1.120% O&I/High Pri
167-11-006Bolted Equipment Removal Plate (BERP); repair3.3.120% O&I/High Pri
251-30-001Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair3.4.120% O&I/High Pri
3.5.120% O&I/High Pri
251-31-001Air Intake and Exhaust Louver; preserve3.5.1.120% O&I/High Pri
251-32-001Number One Gas Turbine Intake; repair3.2.1.120% O&I/High Pri
251-32-002Number One Gas Turbine Module (GTM) Clean Air Intake; repair3.4.120% O&I/High Pri
3.5.120% O&I/High Pri
251-32-003Number 2 Gas Turbine Intake; repair3.2.1.120% O&I/High Pri
259-10-001Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap;
repair3.3.120% O&I/High Pri
3.4.120% O&I/High Pri
259-10-002Number 2 Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap;
repair3.3.120% O&I/High Pri
3.4.120% O&I/High Pri
259-10-003Gas Turbine (GTRB) Exhaust Duct Collector; repair3.3.120% O&I/High Pri
3.4.1`20% O&I/High Pri
262-40-002Main Reduction Gear (MRG) Lube Oil Cooler Tube Bundle; install3.4.2.120% O&I/High Pri
264-31-001Number One Lube Oil Purifier Heater; clean3.2.1.120% O&I/High Pri
3.3.1.120% O&I/High Pri
264-32-001Number 2 Lube Oil Purifier Heater; clean33.3.1.120% O&I/High Pri
264-32-001Number 2 Lube Oil Purifier Heater; clean3.2.1.120% O&I/High Pri
3.3.1.120% O&I/High Pri
311-31-001Number One Ship Service Gas Turbine Generator (SSGTG); repair3.1.120% O&I/High Pri
311-32-001Number 2 Ship Service Gas Turbine Generator (SSGTG); repair3.1.120% O&I/High Pri
311-33-001Number 3 Ship's Service Gas Turbine Generator (SSGTG); repair3.1.120% O&I/High Pri
321-80-001DDG51 Class AER 64201D, Stuffing Tube Replacement; accomplish(PARTIAL)3.1.1.120% O&I/High Pri
514-20-001Air Conditioning (AC) Plant Condenser; mechanically clean3.1.4.120% O&I/High Pri
3.3.120% O&I/High Pri
514-20-002Air Conditioning Plant Condenser Water Control Valve (CWCV); replace3.1.120% O&I/High Pri
514-23-001Air Conditioning Plant; repair3.3.1.120% O&I/High Pri
516-11-001Refrigeration Plant Piping; replace3.3.220% O&I/High Pri
521-11-001Firemain Piping System; repair3.1.120% O&I/High Pri
521-11-003Firemain System; clean and inspect3.1.6.120% O&I/High Pri
561-11-001Steering Ram Seal Packing; install3.1.1.120% O&I/High Pri
571-11-003Sliding Padeye, Tilting; install new3.1.420% O&I/High Pri
593-20-001Oily Waste Transfer piping; replace3.2.120% O&I/High Pri
624-11-001Balanced Joiner Door; repair3.1.220% O&I/High Pri
631-11-001Machinery Space Bilge and Access Trunk; preserve3.3.120% O&I/High Pri
631-11-002Engine Room Number 2 Bilge and Access Trunk; preserve3.3.120% O&I/High Pri
631-13-001Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve3.3.120% O&I/High Pri
631-13-002Collective Protection System (CPS) Zone One Fan Room; repair and preserve3.3.120% O&I/High Pri
631-13-003Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve3.3.120% O&I/High Pri
631-13-004Collective Protection System (CPS) Zone 4 Fan Room; repair and preserve3.3.120% O&I/High Pri
631-13-005Fan Room; preserve and repair3.1.2.120% O&I/High Pri
631-13-008Bilge; preserve3.2.1.120% O&I/High Pri
631-21-001Mast Preservation; accomplish3.1.220% O&I/High Pri
991-11-001Antenna Array Temporary Staging for Use by Ship's Force; provide3.2.120% O&I/High Pri
993-31-002Temporary Main Reduction Gear (MRG) Dehumidifier System; provide3.2.120% O&I/High Pri
993-31-004Waveguide and Transmission Dry Air Lay-Up; accomplish3.3.1.120% O&I/High Pri
121-11-002Longitudinal Bulkhead; repair3.1.120% O&I/Low Pri
130-11-001Aircraft Securing Fitting; install3.1.3.120% O&I/Low Pri
150-11-00301 Level Bulkhead; repair3.1.120% O&I/Low Pri
421-11-001Pelorus Foundation; replace3.1.120% O&I/Low Pri
512-11-001Dry Ice Ventilation Cleaning; accomplish3.1.120% O&I/Low Pri
3.4.120% O&I/Low Pri
581-11-001Anchor and Anchor Chain; inspect and preserve3.3.1120% O&I/Low Pri
581-11-002Anchor Windlass Stroke Control; repair3.1.120% O&I/Low Pri
582-11-001Retractable Bitt and Chock; repair and preserve3.1.3.120% O&I/Low Pri
583-11-001Boat Handling and Stowage System; repair3.4.3.120% O&I/Low Pri
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Ejector Pump and Motor; install3.3.3.120% O&I/Low Pri
634-21-001Forecastle Nonskid; replace3.2.120% O&I/Low Pri
3.3.120% O&I/Low Pri
634-21-002Flight Deck Nonskid; install3.3.120% O&I/Low Pri
3.4.120% O&I/Low Pri

File details come from the government source that posted it. Updated .