N00024-22-R-4422-0003.pdf

PDF 500 KB Posted

Attached to
USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-21-R-4422
Issued by

About this file

This solicitation announces a requirements contract opportunity for the FY22 USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA). The Naval Sea Systems Command will award a single contract for ship maintenance, modernization, and repair work. The availability requires extensive facilities and human resources to complete multiple areas of coordinated ship maintenance. Offerors must submit proposals through the Procurement Integrated Enterprise Environment by the anticipated July 2022 award date. The 16-month period of performance is scheduled from July 2022 to November 2023 at an East/Gulf Coast place of performance. As this complex requirement does not have two or more capable small businesses, the procurement will not be set aside for small business. Interested parties must request access to relevant technical attachments through the specified contracting personnel.

View the file

Other files

File Type Posted
USS ROSS_QA 4.xlsx XLSX spreadsheet
N00024-22-R-4422-0004 Conformed.pdf PDF
N00024-22-R-4422-0004.pdf PDF
USS ROSS_QA 3.xlsx XLSX spreadsheet
N00024-22-R-4422-0003 Conformed.pdf PDF
N00024-22-R-4422-0002 Conformed.pdf PDF
N00024-22-R-4422-0002.pdf PDF
USS ROSS_QA 2.xlsx XLSX spreadsheet
USS ROSS_QA 1.xlsx XLSX spreadsheet
N00024-22-R-4422-0001.pdf PDF
N00024-22-R-4422-0001 Conformed.pdf PDF
(USS ROSS) CDRL Exhibit B - 19AUG21.pdf PDF
(USS ROSS) Attachment J-5 Quality Assurance Surveillance Plan - 27Jul21.docx DOCX document
(USS ROSS) Attachment J-10 Open and Inspect Milestone Reports 26AUG2021.xlsx XLSX spreadsheet
(USS ROSS) Attachment S-3 Pre-Proposal Information (PPI) Form - 7Sep21.xlsx XLSX spreadsheet
N00024-22-R-4422.docx DOCX document
(USS ROSS) Attachment J-8 Government Furnished Material (GFM) List - 28Jan22.xlsx XLSX spreadsheet
USS ROSS Attachment J-7 IPTD Events and SMR - 22Oct21.docx DOCX document
USS ROSS Attachment S-7 Proposal Assessment - 28Jan22.xlsx XLSX spreadsheet
(USS ROSS) (DDG 71) Attachment S-5 Eligibility Criteria Data Sheet - 26Jul21.docx DOCX document
(USS ROSS) CDRL Exhibit A - 19Aug21.pdf PDF
(USS ROSS) Attachment S-9 Past Performance Questionnaire - 7Sep21.docx DOCX document
(USS ROSS) CDRL Exhibit C - 19AUGl21.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002421FR62094

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update Section F- Delivery Schedule and change the remainder of the solicitation including the Section J Attachments from USS ROSS FY22 EDSRA to USS ROSS FY23 EDSRA. Additionally, this amendment provides Errata 2 and Addendum 1 as an update to Attachment J-1. Attachments J-3, J-4, J-9, and J-10 have been updated to incorporate Errata 2 and Addendum 1. Lastly, this Amendment updates Section L to extend the deadline for Bidder's Questions.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 102

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002422R4422

X 9B. DATED (SEE ITEM 11)

28-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Feb-2022

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002422R4422

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A, B, and D - F

To:

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A, B, and D - F

CLIN 0002

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A, B, and D - F

ROSS (DDG 71) DURING FY23 EXTENDED DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other

CLIN 0003

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance

ROSS (DDG 71) DURING FY23 EXTENDED DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other

CLIN 0004

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance detailed data as included in Attachments J-1 and J-2See Notes A, B, and D - F

ROSS (DDG 71) DURING FY23 EXTENDED DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2See Notes A, B, and D - F

CLIN 0006

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

Attachments J-1 and J-2.See Notes A - F

ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0007

Antenna Array Temporary Staging (WI 991-11-001) for Use by Ship's Force; and AN/SPY-1 Antenna Array Face Resurface (WI 993-21-001) Support Service; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

Antenna Array Temporary Staging (WI 991-11-001) for Use by Ship's Force; and AN/SPY-1 Antenna Array Face Resurface (WI 993-21-001) Support Service; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0008

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS

ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED

AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0009

Messing and Berthing Barge Long Distance Tow Service; provide (OPTION ITEM)PREPARE

FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)

DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY

(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F

Messing and Berthing Barge Long Distance Tow Service; provide (OPTION ITEM)PREPARE

FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)

DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY

(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0010

Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Gonzalez (DDG 66) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Gonzalez (DDG 66) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0011

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Steam Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Steam Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross

(DDG 71) as specified in the statement of work provided herein and in accordance with standard

CLIN 0012

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0013

Messing and Berthing Barge Steam Temporary Service in Contractor Plant; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

Messing and Berthing Barge Steam Temporary Service in Contractor Plant; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0014

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish

(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish

(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0015

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish

(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish

(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0016

ShipAlt DDG51-86222K, NGF Backfit Phase One Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

ShipAlt DDG51-86222K, NGF Backfit Phase One Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0017

ShipAlt DDG51-96840K, Harpoon Weapon System Removal; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

ShipAlt DDG51-96840K, Harpoon Weapon System Removal; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0018

ShipAlt DDG51-81961K and 85114K, Tactical Tomahawk Weapon Control System (TTWCS) V5.4.0.2 and TC2S 5.0.1V7 Hardware; accomplish (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F

ShipAlt DDG51-81961K and 85114K, Tactical Tomahawk Weapon Control System (TTWCS) V5.4.0.2 and TC2S 5.0.1V7 Hardware; accomplish (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test

CLIN 0019

ShipAlt DDG51-81961K and 85114K, TTWCS V5.4.0.2 and TC2S 5.0.1V7, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein

ShipAlt DDG51-81961K and 85114K, TTWCS V5.4.0.2 and TC2S 5.0.1V7, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test

CLIN 0020

ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0021

Crew Living Space Habitability Project (BENL-R1075) Installation; accomplish (OPTION

ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-

Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

Crew Living Space Habitability Project (BENL-R1075) Installation; accomplish (OPTION

ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0022

Crew Living Space Habitability Project (BENL-R9587) Installation; accomplish (OPTION

ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

Crew Living Space Habitability Project (BENL-R9587) Installation; accomplish (OPTION

ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

CLIN 0023

CPO Living Space Habitability Project (BCPO-S6212) Installation; accomplish (OPTION

ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

CPO Living Space Habitability Project (BCPO-S6212) Installation; accomplish (OPTION

ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0024

Crew Sanitary Space Habitability Project (HENL-R1076) Installation; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

Crew Sanitary Space Habitability Project (HENL-R1076) Installation; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0025

Crew Sanitary Space Habitability Project (HENL-R9588) Installation; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

Crew Sanitary Space Habitability Project (HENL-R9588) Installation; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0026

CPO Sanitary Space Habitability Project (HCPO-S6214) Installation; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

CPO Sanitary Space Habitability Project (HCPO-S6214) Installation; accomplish (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0027

Engineering Change (EC) DDG51-90119K, Navy Cash Equipment Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein

Engineering Change (EC) DDG51-90119K, Navy Cash Equipment Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test

CLIN 0028

ShipAlt DDG51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

ShipAlt DDG51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0029

ShipAlt DDG51-80897K NMT-AN/WSC-9(V)X/KA, Alteration Installation Team (AIT) Support; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

ShipAlt DDG51-80897K NMT-AN/WSC-9(V)X/KA, Alteration Installation Team (AIT) Support; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0030

ShipAlt DDG-51-81798K, NAVMACS Technical Refresh Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22

EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F

ShipAlt DDG-51-81798K, NAVMACS Technical Refresh Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH

REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23

EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F

CLIN 0031

ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0032

ShipAlt DDG51-85030K, Global Broadcast System (GBS) Receive Broadcast Manager (RBM), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR

AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)

DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY

(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-85030K, Global Broadcast System (GBS) Receive Broadcast Manager (RBM), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR

AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)

DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY

(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See

CLIN 0033

ShipAlt DDG51-89715K, Ships Signal Exploitation Equipment (SSEE) Increment F System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR

AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)

DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY

(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

ShipAlt DDG51-89715K, Ships Signal Exploitation Equipment (SSEE) Increment F System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR

AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)

DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY

(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package

CLIN 0034

ShipAlt DDG51-91014K, Consolidated Afloat Networks and Enterprise Services (CANES) HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item

ShipAlt DDG51-91014K, Consolidated Afloat Networks and Enterprise Services (CANES) HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD

USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED

RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in

CLIN 0035

ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0036

ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0037

ShipAlt DDG51-86644K USW-DSS AN/UYQ-100(V)3 to AN-SQQ-89A (V) 15 Interface- CRUDES AIT Support Services; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein

ShipAlt DDG51-86644K USW-DSS AN/UYQ-100(V)3 to AN-SQQ-89A (V) 15 Interface- CRUDES AIT Support Services; provide (OPTION ITEM)PREPARE FOR AND

ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING

FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test

CLIN 0038

ShipAlt 94979K, HM&E Condition System, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

ShipAlt 94979K, HM&E Condition System, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND

ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

CLIN 0039

Ship Towing Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard

Ship Towing Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR

AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-

DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as

The following have been modified:

NOTE B

NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND

NEW WORK

SCHEDULE OF…

This is the start of the file's text. The full file is on GovTribe.