N00024-22-R-4422-0003.pdf
PDF 500 KB Posted
- Solicitation number
- N00024-21-R-4422
About this file
This solicitation announces a requirements contract opportunity for the FY22 USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA). The Naval Sea Systems Command will award a single contract for ship maintenance, modernization, and repair work. The availability requires extensive facilities and human resources to complete multiple areas of coordinated ship maintenance. Offerors must submit proposals through the Procurement Integrated Enterprise Environment by the anticipated July 2022 award date. The 16-month period of performance is scheduled from July 2022 to November 2023 at an East/Gulf Coast place of performance. As this complex requirement does not have two or more capable small businesses, the procurement will not be set aside for small business. Interested parties must request access to relevant technical attachments through the specified contracting personnel.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002421FR62094
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update Section F- Delivery Schedule and change the remainder of the solicitation including the Section J Attachments from USS ROSS FY22 EDSRA to USS ROSS FY23 EDSRA. Additionally, this amendment provides Errata 2 and Addendum 1 as an update to Attachment J-1. Attachments J-3, J-4, J-9, and J-10 have been updated to incorporate Errata 2 and Addendum 1. Lastly, this Amendment updates Section L to extend the deadline for Bidder's Questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 102
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002422R4422
X 9B. DATED (SEE ITEM 11)
28-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Feb-2022
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002422R4422
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A, B, and D - F
To:
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A, B, and D - F
CLIN 0002
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A, B, and D - F
ROSS (DDG 71) DURING FY23 EXTENDED DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other
CLIN 0003
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance
ROSS (DDG 71) DURING FY23 EXTENDED DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other
CLIN 0004
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance detailed data as included in Attachments J-1 and J-2See Notes A, B, and D - F
ROSS (DDG 71) DURING FY23 EXTENDED DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2See Notes A, B, and D - F
CLIN 0006
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
Attachments J-1 and J-2.See Notes A - F
ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0007
Antenna Array Temporary Staging (WI 991-11-001) for Use by Ship's Force; and AN/SPY-1 Antenna Array Face Resurface (WI 993-21-001) Support Service; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
Antenna Array Temporary Staging (WI 991-11-001) for Use by Ship's Force; and AN/SPY-1 Antenna Array Face Resurface (WI 993-21-001) Support Service; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0008
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS
ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED
AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0009
Messing and Berthing Barge Long Distance Tow Service; provide (OPTION ITEM)PREPARE
FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)
DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY
(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F
Messing and Berthing Barge Long Distance Tow Service; provide (OPTION ITEM)PREPARE
FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)
DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY
(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0010
Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Gonzalez (DDG 66) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Gonzalez (DDG 66) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0011
Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Steam Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F
Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Steam Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross
(DDG 71) as specified in the statement of work provided herein and in accordance with standard
CLIN 0012
Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0013
Messing and Berthing Barge Steam Temporary Service in Contractor Plant; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
Messing and Berthing Barge Steam Temporary Service in Contractor Plant; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0014
ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish
(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish
(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0015
ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish
(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish
(OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0016
ShipAlt DDG51-86222K, NGF Backfit Phase One Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
ShipAlt DDG51-86222K, NGF Backfit Phase One Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0017
ShipAlt DDG51-96840K, Harpoon Weapon System Removal; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
ShipAlt DDG51-96840K, Harpoon Weapon System Removal; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0018
ShipAlt DDG51-81961K and 85114K, Tactical Tomahawk Weapon Control System (TTWCS) V5.4.0.2 and TC2S 5.0.1V7 Hardware; accomplish (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F
ShipAlt DDG51-81961K and 85114K, Tactical Tomahawk Weapon Control System (TTWCS) V5.4.0.2 and TC2S 5.0.1V7 Hardware; accomplish (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test
CLIN 0019
ShipAlt DDG51-81961K and 85114K, TTWCS V5.4.0.2 and TC2S 5.0.1V7, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein
ShipAlt DDG51-81961K and 85114K, TTWCS V5.4.0.2 and TC2S 5.0.1V7, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test
CLIN 0020
ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0021
Crew Living Space Habitability Project (BENL-R1075) Installation; accomplish (OPTION
ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-
Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
Crew Living Space Habitability Project (BENL-R1075) Installation; accomplish (OPTION
ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0022
Crew Living Space Habitability Project (BENL-R9587) Installation; accomplish (OPTION
ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
Crew Living Space Habitability Project (BENL-R9587) Installation; accomplish (OPTION
ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
CLIN 0023
CPO Living Space Habitability Project (BCPO-S6212) Installation; accomplish (OPTION
ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
CPO Living Space Habitability Project (BCPO-S6212) Installation; accomplish (OPTION
ITEM) PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0024
Crew Sanitary Space Habitability Project (HENL-R1076) Installation; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
Crew Sanitary Space Habitability Project (HENL-R1076) Installation; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0025
Crew Sanitary Space Habitability Project (HENL-R9588) Installation; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
Crew Sanitary Space Habitability Project (HENL-R9588) Installation; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0026
CPO Sanitary Space Habitability Project (HCPO-S6214) Installation; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
CPO Sanitary Space Habitability Project (HCPO-S6214) Installation; accomplish (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0027
Engineering Change (EC) DDG51-90119K, Navy Cash Equipment Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein
Engineering Change (EC) DDG51-90119K, Navy Cash Equipment Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test
CLIN 0028
ShipAlt DDG51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
ShipAlt DDG51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0029
ShipAlt DDG51-80897K NMT-AN/WSC-9(V)X/KA, Alteration Installation Team (AIT) Support; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
ShipAlt DDG51-80897K NMT-AN/WSC-9(V)X/KA, Alteration Installation Team (AIT) Support; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0030
ShipAlt DDG-51-81798K, NAVMACS Technical Refresh Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22
EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F
ShipAlt DDG-51-81798K, NAVMACS Technical Refresh Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH
REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23
EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See Notes A - F
CLIN 0031
ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0032
ShipAlt DDG51-85030K, Global Broadcast System (GBS) Receive Broadcast Manager (RBM), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR
AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)
DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY
(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-85030K, Global Broadcast System (GBS) Receive Broadcast Manager (RBM), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR
AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)
DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY
(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.See
CLIN 0033
ShipAlt DDG51-89715K, Ships Signal Exploitation Equipment (SSEE) Increment F System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR
AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)
DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY
(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
ShipAlt DDG51-89715K, Ships Signal Exploitation Equipment (SSEE) Increment F System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR
AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71)
DURING FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY
(EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package
CLIN 0034
ShipAlt DDG51-91014K, Consolidated Afloat Networks and Enterprise Services (CANES) HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item
ShipAlt DDG51-91014K, Consolidated Afloat Networks and Enterprise Services (CANES) HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION
ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-DOCKING SELECTED
RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry- Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in
CLIN 0035
ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0036
ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0037
ShipAlt DDG51-86644K USW-DSS AN/UYQ-100(V)3 to AN-SQQ-89A (V) 15 Interface- CRUDES AIT Support Services; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein
ShipAlt DDG51-86644K USW-DSS AN/UYQ-100(V)3 to AN-SQQ-89A (V) 15 Interface- CRUDES AIT Support Services; provide (OPTION ITEM)PREPARE FOR AND
ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING
FY23 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)
(Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test
CLIN 0038
ShipAlt 94979K, HM&E Condition System, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
ShipAlt 94979K, HM&E Condition System, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR AND
ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
CLIN 0039
Ship Towing Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard
Ship Towing Service; provide (OPTION ITEM)PREPARE FOR AND ACCOMPLISH REPAIR
AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY23 EXTENDED DRY-
DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as
The following have been modified:
NOTE B
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND
NEW WORK
SCHEDULE OF…