N00024-22-R-4422-0001.pdf
PDF 212 KB Posted
- Solicitation number
- N00024-21-R-4422
About this file
This document summarizes a solicitation for ship repair and maintenance services. The Naval Sea Systems Command is seeking proposals for the FY22 Extended Dry-Docking Selected Restricted Availability of the USS Ross (DDG 71). Offerors must have extensive shipyard facilities and personnel capable of coordinating complex maintenance, modernization, and repair work over a projected 16-month period from July 2022 through November 2023. The solicitation will utilize a low-price technically acceptable source selection evaluating cost and non-cost factors. Proposals are due no later than March 2022, with an anticipated single award by July 2022. Interested parties must register in the System for Award Management and Procurement Integrated Enterprise Environment to access solicitation documents and submit proposals electronically.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002421FR62094
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update Note E and to update Section L to extend the bidder's question deadline from 18 February 2022 to 23 February 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002422R4422
X 9B. DATED (SEE ITEM 11)
28-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Feb-2022
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002422R4422
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
NOTE E
NOTE E: SPECIAL AGREEMENT FOR GROWTH WITH A PRICE OF $25,000 OR LESS
1. To make administration of small dollar value growth more efficient and less costly, both parties (Government and Contractor) agree to a pre-priced value for individual growth items with an estimated price of $25,000 or less. The Contract will include a firm fixed price for growth valued at $25,000.00 or less. Zero-dollar changes and administrative contract changes (for example, drawing revision change where no additional work is required) shall not be executed using the Small Dollar Value Growth procedures, but will follow the change process.
2. The amount included in this Contract for the growth described above shall be equal to a maximum quantity of:
a. 450 occurrences for growth work computed at a firm fixed price of $6,986 per occurrence, as associated with CLINS 0040 – 0083 for the USS ROSS (DDG 71) FY22 (EDSRA).
3. A Waterfront Circuit Team comprised of a small group of Contractor and Government representatives shall administer the Special Agreement for Growth with a value of $25,000 or less. The Contractor shall establish a group of empowered representatives who will be located in proximity to the ship during the availability period and who will interact with a similar group of Government representatives (also to be located in close proximity to the ship and to be identified by the NSA). Specific arrangements for the Waterfront Circuit Team shall be mutually agreed between the Contractor and NSA.
4. The Contractor shall report proposed growth work through the normal CFR process in accordance with Contract terms. The Government may also independently identify growth work. No later than 24 hours after the final approval of the CFR, the Waterfront Circuit Team shall use best efforts to determine if the proposed growth is $25,000 or less, and document the agreed to technical scope of work. The Contracting Officer shall direct the commencement of all growth work. Directed growth will be followed by documentation to appropriately reflect specification changes.
5. If the Waterfront Circuit Team is not able to reach agreement that the price of the growth work is $25,000, or less, then it will be adjudicated through the LOE to Completion process identified in Section B, Note A.
However, if negotiations reveal the value of growth work is $25,000, or less, the task will be settled in accordance with the Small Dollar Value Growth procedure at the pre-priced value per occurrence identified in Section B, Note E, Paragraph 2, above.
6. The Contractor and Government (Contracting Officer) shall develop a growth tracker to identify and record the number of directed occurrences under this Note. All growth meeting the criteria of paragraph 1 above shall be accepted under this clause without delay and disruption in ship redelivery.
7. When the quantity of occurrences for Small Dollar Growth is depleted, the Small Dollar Growth process shall revert to the LOE to Completion process for remaining growth.
8. Within 30 days after the end of the contract period of performance, the Contractor and Contracting Officer, utilizing the growth work tracker, shall determine the number of pre-priced occurrences not directed under this contract. Accordingly, the Contracting Officer will decrease the contract price by an amount calculated by multiplying the remaining number of occurrences by the pre-established firm fixed price per occurrence.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
INSTRUCTIONS TO OFFERORS
Section L: Instructions, Conditions and Notices to Bidders
INTRODUCTION
A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Fixed-Price contract to complete the USS ROSS (DDG 71) EDSRA.
B. The Government expects the best value to result from selection of the technically acceptable proposal with the lowest evaluated price and will thus use the Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2.
C. ALL INQUIRIES shall be made in writing and directed to Mike Hammersley, Contracting Officer, and Danielle Bences, Contract Specialist, at james.m.hammersley.civ@us.navy.mil, and danielle.bences@navy.mil, respectively. To ensure the Government is able to adequately address and respond to Offeror pre-proposal information (PPI) via amendment, it is requested questions be submitted no later than 23 February 2022 at 3:00 pm, local time, Washington DC. The Government reserves the right to not answer any requests received after this date and time. Furthermore, Offerors should note that the proposal due date will not be extended solely on the basis of requests received after this date and time.
Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation.
D. Estimated Award Date: The Government anticipates making an award in or before 29 July 2022.
E. Potential Prime Offeror’s Negative Response: The Government requests a negative response from any potential Prime Offeror who, after reviewing this solicitation, does not intend on submitting a proposal. The Government requests delivery of negative response to the Contracting Officer and Contract Specialist listed above NLT seven (7) business dates after solicitation release.
II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS
A. Proposal Due Date:
1. All copies of proposals (Volumes I & II) shall be received by the Government no later than 29
March 2022 at 10:00 am, local time, Washington DC. Due to COVID-19 restrictions, only electronic submittal of proposals via the Solicitation Module in the Procurement Integrated Enterprise Environment (PIEE) will be permitted. Late proposals WILL NOT be considered. Partial proposals or attachments WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.
a) Offerors must provide a proposal valid for at least 140 calendar days, DD Month 2022 from the proposal due date (15 August 2022). (Complete block 12 of the Standard Form (SF) 33).
B. Directions for Electronic Submission of Proposals:
1. Due to ongoing restrictions resulting from the global COVID-19 pandemic, hand delivery of proposals is not possible at this time to the Washington Navy Yard. Offerors are instructed to submit proposals electronically via the Solicitation Module in PIEE located at https://piee.eb.mil. Offerors must request a PIEE account within seven days of solicitation release.
2. Offerors wishing to submit a proposal in response to this notification shall ensure a representative of their organization registers at the PIEE website and that the Proposal Manager role in the Solicitation Module is approved for the Offeror’s representative. The Proposal Manager in the Solicitation Module can search for the solicitation based on criteria such as the solicitation number, response date, status, and contracting office DoDAAC among additional criteria. Once the solicitation is found and selected, the Proposal Manager can submit a proposal by selecting the “Offer” tab, choosing the applicable CAGE code for the Offeror, uploading the attachments that comprise their offer, and digitally signing off on submission of the offer. After proposal submission, please provide email confirmation to all of the POC’s identified in paragraph I(C) above.
3. Offerors shall address their package with the RFP number and Offeror’s company name. The
Solicitation Module in PIEE will document the submittal date and time of the Offeror’s proposal submission and shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.
4. The Solicitation Module in PIEE does NOT accept zip file submissions. Proposal submissions shall be formatted so that each file name clearly identifies the Proposal Volume that the file is associated with (i.e. “Volume I Price Proposal – Cover Letter”). Each Volume shall be formatted with separate files submitted for each Factor.
5. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included.
6. Proposal volumes shall be structured as follows:
Proposal Volume Title
USS ROSS (DDG 71)
ROS-1 USS ROSS Price Volume ROS-2 USS ROSS Technical Volume
III. GENERAL INFORMATION
A. Ship Checks:
1. The USS MAHAN (DDG 72) will be available for ship check prior to the proposal submission due date. Potential offerors may inspect the USS MAHAN (DDG 72) in Norfolk, VA from 04 February 2022 through 25 February 2022.
2. To schedule a ship check, Offerors shall email a "Request for Ship Check" to Mike Hammersley and Danielle Bences at james.m.hammersley.civ@us.navy.mil, and danielle.m.bences.civ@us.navy.mil, respectively. Due to the ship location, additional information will be provided upon request.
3. Participants will be subject to security, safety, and other applicable regulations established by Mid- Atlantic Regional Maintenance Center (MARMC) and ship’s Commanding Officers. Contractors conducting MARMC related work efforts must visit MARMC security website for latest forms and instructions at:
a) http://www.marmc.navy.mil/visitors.html
b) https://www.cnic.navy.mil/regions/cnrsw/installations/navbase_norfolk/om/force_protection/pass_and_ decal.html
B. Specifications and associated reference documentation:
1. Upon request, the Government will provide the Specification Package Work Items and Work Item
References.
2. Offerors may request solicitation attachments by submitting a request to:
a) Contracting Officer at james.m.hammersley.civ@us.navy.mil, and
b) Contract Specialist at danielle.m.bences.civ@us.navy.mil
3. Additional work item references not already in the possession of the Offerors, commercially available, or listed under 52.211-2, are available through the following websites:
a) https://jedmics.net/
b) https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx
c) https://nsedr.nnsy.navy.mil//
C. Alteration of Solicitation
1. Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.
D. Proposal Information
1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, Offerors are advised conclusory statements regarding an Offeror’s experience such as: “the Offeror understands”, “the Offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors shall provide specific and concise information to validate all assertions.
E. Amendments
1. The Government may revise the solicitation at any time by means of an Amendment. It is an Offeror’s responsibility to ensure it is accessing the Beta.sam.gov website to view potential amendments and procurement notifications for this solicitation.
F. Teaming Arrangements
1. Proposals must be submitted by one (1) Prime Contractor. An Offeror may be listed as a Subcontractor in multiple proposals but may only submit one (1) proposal as a Prime Contractor with a unique Commercial and Government Entity (CAGE) code and Taxpayer Identification Number (TIN).
To be evaluated as a Joint Venture (JV), Offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.
G. One-bid Situation
1. If the government receives only one bid for solicitation N00024-21-R-4422, the government reserves the right to require certified cost or pricing data in accordance with DFARS 252.215-7008. As identified by the Contracting Officer, additional cost or pricing data will be required in order to determine whether proposed pricing is fair and reasonable or to comply with the statutory requirements of certified cost or pricing data in accordance with 10 USC 2306(a) and FAR 15.403-4. The Offeror agrees to provide any additional data requested within 30 days of notification.
IV. PROPOSAL FORMAT
A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory. PROPOSALS
WHICH DO NOT FOLLOW THIS DIRECTION MAY BE REJECTED AS NON-RESPONSIVE
AND THUS INELIGIBLE FOR AWARD. NON-RESPONSIVE PROPOSALS WILL NOT BE
EVALUATED.
B. Electronic Proposals: All proposals shall be submitted via the Solicitation Module in PIEE as outlined above. Pages shall be formatted to 8.5 x 11 inch paper with one inch margins. The text used shall be Times New Roman with a minimum of 12 point font. Any revisions to Offerors’ proposals (if required) shall be submitted in two (2) forms: (1) a final clean revised document; and (2) a redlined document outlining the Offeror’s changes. The Contracting Officer reserves the right to provide any additional instructions regarding revisions to Offerors’ proposals via letter. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section L paragraph V where required.
C. Page Limits:
1. Volume I (ROS-I)
a) Factor 1 – Price: No page limitation with the exception of the cover letter which shall not exceed three (3) pages.
2. Volume II (ROS-2)
a) Factor 2 – Technical Eligibility Factor: No page limit
b) Factor 3 – Past Performance: No page limit
V. PROPOSAL CONTENT
A. VOLUME I
1. Factor 1 - Price: The price proposal shall not contain non-price factor information. The price proposal shall be comprised of the following documentation:
a) Cover Letter,
b) Signed SF 33 with all amendments acknowledged,
c) Small Business Subcontracting plan per FAR Part 19 (large businesses only),
d) Any Joint Venture / teaming agreements (if applicable),
e) NSI 009-72 Narrative and Supporting Documentation (if applicable),
f) Completed Attachment J-4 and Solicitation Section B carrying forward information from Attachment
J-4, as applicable, containing:
(1) Work Item Pricing for all Base and Option Items,
(2) Daily Extension Rates,
(3) Inter-port Differential (IPD),
(4) Fully Burdened Ship Repair Labor & Material Burden Rate, New Work & Growth Reservation, and
(5) NSI 009-72 Deduction (if applicable)
g) Completed Execution Milestones and Key Event Dates (Attachment J-3).
h) Completed Proposal Assessment (Attachment S-7).
2. Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the Offeror shall include the following in the cover letter:
a) Identification of all enclosures included with the proposal,
b) CAGE and Data Universal Numbering System (DUNS) numbers for the Prime Contractor,
c) Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).
d) Name, address, and telephone number of each proposed first-tier Subcontractor with a proposed subcontract estimated at $10 million or more.
e) For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook (Attachment J-4) provide an explanation as to why. In addition, if applicable:
(1) For any WI with a total value of zero labor hours proposed (Prime and Subcontractor combined)
(although material is proposed), provide an explanation as to why.
(2) For any WI with a total dollar value of zero material proposed (Prime and Subcontractor combined) (although labor is proposed), provide an explanation as to why.
3. Standard Form 33 (SF-33): As part of the price proposal package, the Offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.
4. Small Business Subcontracting Plan (SBSP):
a. An Offeror shall submit a SBSP outlining its strategy for maintaining compliance with FAR
52.219-9 for the duration of the USS ROSS (DDG 71) availability, which includes:
i. A subcontracting goal of 25 percent of an Offeror’s total contracting dollars utilizing small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUB-Zone small businesses. Note, the 25 percent goal is inclusive of the congressionally mandated five percent (5%) goal for small disadvantaged business concerns.
ii. Offerors must provide rationale for any proposed plan which does not meet the following thresholds (as applied to total contract dollars):
(1) 25 percent of prime contracts for small businesses;
(2) Five percent of prime and subcontracts for women-owned small businesses;
(3) Five percent of prime contracts and subcontracts for small disadvantaged businesses;
(4) Three percent of prime contracts and subcontracts for HUBZone small businesses;
and
(5) Three percent of prime and subcontracts for service-disabled veteran-owned small businesses.
iii. In addition, Offerors must provide explanation for any SBSP which fails to address all requirements outlined in FAR 52.219-9.
iv. A SBSP is NOT REQUIRED from a small business concern.
5. Completed Solicitation Section B and Pricing Workbook (Attachment J-4):
a) Offerors must propose on all contract line items (CLINs) including all base and option CLINs, complete Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED),” complete Section B “NOTE D: SCHEDULE OF DAILY RATES
FOR PIERSIDE AND DRY DOCKING (FULLY BURDENED) FOR PURPOSES OF A
COMPENSABLE EXTENSION TO THE DRY-DOCKING OR DELIVERY DATE,” and complete all tabs of Pricing Workbook (Attachment J-4) to be considered responsive.
b) The Offeror shall submit prices using the Pricing Workbook (Attachment J-4) for all Tabs, including:
Work Item Pricing for all Option Items, Daily Extension Rates, Fully Burdened Ship Repair Labor Rate & Material Burden Rates and Total Evaluated Pricing in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between the two, the CLIN price shall govern. The Pricing Workbook (Attachment J-4) Fully Burdened Ship Repair Labor Rate and Material Burden Rate must match the rates provided in the Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED).” If there is a discrepancy between the two, the Section B Fully Burdened Ship Repair Labor Rate and Material Burden Rate shall govern.
c) Offerors are to insert pricing in all yellow shaded fields in the pricing workbook (Attachment J-4).
6. Inter-port Differential (IPD)
a) The IPD applicable to the USS ROSS (DDG 71) FY22 EDSRA must be included in all offers and reflects the costs incurred by the Navy to accomplish an availability at a port other than the homeport.
The following chart provides the values to be included in all Offerors’ price proposals to determine the Offeror’s total evaluated price.
Location* Differential Norfolk, VA $39,158 Mayport, FL $1,542,225 Pascagoula, MS $1,717,934 Philadelphia, PA $2,013,540
b) Offerors whose location is not listed in the above Government provided port differential table shall submit a bidder’s question requesting a Government provided port differential be calculated for the Offeror’s proposed location for the USS ROSS (DDG 71) FY22 EDSRA.
7. NSI 009-72 Reduction
a) Offeror must provide a narrative as well as other than certified cost or pricing data in accordance with
FAR 15.403-3, supporting the impact of SI 009-72 Security Measures for Surface Combatants and Amphibious ships use of a water barrier, numbered Fleet Commander-approved barge or other physical barrier approved by the numbered Fleet Commander.
B. VOLUME II – Non-Price Proposal: Do not include cost or price information in this volume. The Non-Price Proposal shall be comprised of two (2) factors, as follows:
1. Non-Price Factor 2 – Technical Eligibility Factor: Offerors must provide the following to demonstrate eligibility for Award (There is no page limit associated with this Factor):
a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and drydock intended to be used for the proposed availability and indicates that the pier and drydock meet the minimum characteristics identified in Attachment S-5.
b) Provide a signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier or drydock), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone and/or a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier and drydock facilities, whether owned by the offeror or subcontractor, must be accessible by the USS ROSS (DDG 71) without any modification to the vessel.
c) In accordance with the most current version of MIL-STD-1625, provide a current drydock certification applicable to the drydock proposed for the Availability. Certifications shall demonstrate the drydock will remain certified from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). If the proposed drydock is currently uncertified, or if the certificate will expire prior to the ‘Undock Vessel’ milestone date, the offeror shall provide a detailed plan and schedule to certify or re-certify the drydock in order to remain certified through the period between the ‘Dock Vessel’ and ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). Certification or recertification plans shall include timeline to complete the requirements of MIL-STD-1625 including the below items. Offeror’s plan shall provide a plan of action and milestones (including specific dates or timeframes) to commence and complete the following actions:
i. Contractor Navy Audit request.
ii. Contractor preparation of facility spaces to be inspected. Contractor shall describe when they expect these facilities to be available to complete necessary inspections and any risks to their availability.
iii. Navy examination of the facility, facility certification report, maintenance program documentation, and operational records.
iv. Navy observation of a docking or undocking operation, whenever possible. In the case of a floating dry dock, this operation shall include a submergence test to the maximum dock draft.
v. Navy evaluation of the control inspection, operating, and maintenance procedures.
vi. Navy preparation of exit brief and formalized in a written report.
vii. Contractor actions to resolve any identified deficiencies. Contractor shall explain the time allotted to deficiency resolution and any associated risks.
viii. Navy examination of actions to resolve deficiencies.
2. Non-Price Factor 3 – Past Performance:
In the Past Performance Volume, the Offeror shall demonstrate through submission of its Attachment S-9 (Past Performance Questionnaire) its performance on efforts of similar size, scope, and complexity that the Offeror will be able to perform the requirements outlined in this solicitation. The Offeror may provide up to five (5) recent and relevant contracts depicting its past performance and qualifications. The Offeror should submit contract information for recent (within five years of the proposal submission date) and relevant (Government ship repair) contracts.
Where the Offeror does not have recent and relevant past performance information, the Offeror shall affirmatively state that it does not have recent and relevant past performance information for the Government to consider.
NOTE: The Government reserves the right to use the contract information provided in the Offeror’s proposal to obtain data from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) database, and from the points of contact identified by the Offeror in its proposal.
E-mail complete Past Performance Questionnaires to:
a) Contracting Officer: Mike Hammersley at james.m.hammersley.civ@us.navy.mil, and
b) Contract Specialist: Danielle Bences at danielle.bences@navy.mil
Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .