USS ROSS_QA 4.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-21-R-4422
Issued by

About this file

This document contains a pre-proposal information form and questions from potential offerors regarding a federal solicitation for ship maintenance and modernization services. The solicitation seeks proposals for the FY22 USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability, a 16-month availability beginning in July 2022 at East/Gulf Coast locations. Work includes maintenance, modernization, and repairs across multiple ship systems. The Navy does not anticipate setting aside this procurement for small businesses due to its complexity, magnitude, and duration. Offerors must register in SAM and PIEE to receive the solicitation and submit proposals electronically. Requests for restricted attachments require approval from specified Navy personnel. The pre-proposal information form addresses offeror questions on work scope clarification and missing references.

View the file

Other files

File Type Posted
N00024-22-R-4422-0004 Conformed.pdf PDF
N00024-22-R-4422-0004.pdf PDF
USS ROSS_QA 3.xlsx XLSX spreadsheet
N00024-22-R-4422-0003 Conformed.pdf PDF
N00024-22-R-4422-0003.pdf PDF
N00024-22-R-4422-0002 Conformed.pdf PDF
N00024-22-R-4422-0002.pdf PDF
USS ROSS_QA 2.xlsx XLSX spreadsheet
USS ROSS_QA 1.xlsx XLSX spreadsheet
N00024-22-R-4422-0001.pdf PDF
N00024-22-R-4422-0001 Conformed.pdf PDF
(USS ROSS) CDRL Exhibit B - 19AUG21.pdf PDF
(USS ROSS) Attachment J-5 Quality Assurance Surveillance Plan - 27Jul21.docx DOCX document
(USS ROSS) Attachment J-10 Open and Inspect Milestone Reports 26AUG2021.xlsx XLSX spreadsheet
(USS ROSS) Attachment S-3 Pre-Proposal Information (PPI) Form - 7Sep21.xlsx XLSX spreadsheet
N00024-22-R-4422.docx DOCX document
(USS ROSS) Attachment J-8 Government Furnished Material (GFM) List - 28Jan22.xlsx XLSX spreadsheet
USS ROSS Attachment J-7 IPTD Events and SMR - 22Oct21.docx DOCX document
USS ROSS Attachment S-7 Proposal Assessment - 28Jan22.xlsx XLSX spreadsheet
(USS ROSS) (DDG 71) Attachment S-5 Eligibility Criteria Data Sheet - 26Jul21.docx DOCX document
(USS ROSS) CDRL Exhibit A - 19Aug21.pdf PDF
(USS ROSS) Attachment S-9 Past Performance Questionnaire - 7Sep21.docx DOCX document
(USS ROSS) CDRL Exhibit C - 19AUGl21.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPI FORM

USS ROSS (DDG 71) FY23 EDSRA N00024-22-R-4422
Attachment S-3 Pre-Proposal Information (PPI) Form
MASTER TRACKER
Master #ContractorQuestion #Date of Request:SectionWork Items/CSWT #Para. #Page #:Attach. #Contractor QuestionGovernment Response
292/2/22259-10-0013.2, 3.7 thru 3.7.8In para 3.2 it is required to accomplish Surface Prep SSPC-6 for all locations listed in para 1.3. and located in 1.2 Para 3.3 requires a visual inspection of each area in 1.3. Most of these locations are covered with insulation. Is it the intent of the item to remove and replace ALL insulation thru-out the spaces listed in 1.2 or only what is listed in para 3.7 thru 3.8?Work item has been modified in errata 3 to answer questions and address inconsistancies.
302/2/22259-10-0023.2, 3.7 thru 3.7.8In para 3.2 it is required to accomplish Surface Prep SSPC-6 for all locations listed in para 1.3. and located in 1.2 Para 3.3 requires a visual inspection of each area in 1.3. Most of these locations are covered with insulation. Is it the intent of the item to remove and replace ALL insulation thru-out the spaces listed in 1.2 or only what is listed in para 3.7 thru 3.8?Work item has been modified in errata 3 to answer questions and address inconsistancies.
702/8/222.5Please provide reference S6230-CF-MMA-010/38450, Navy Standard Unit Coolers Models 51UW through 55UWS6230-CF-MMA-010/38450 is a restricted reference. Please refer to the tech library.
712/8/222.3The provided copy of RLAR 64201/DDG51CL/1059417 is only one page. Please confirm this is correct. If additional pages are missing, please provide.RLAR 64201/DDG51CL/1059417 is a total of 3 pages. It is located in NMD.
722/8/22863-51-0013.3Paragraph 3.3 directs Contractor to install a temporary flooding alarm system to include one detector in the low point of each space below the main deck. Is the intent of this paragraph for the Contractor to install temporary flooding detectors in over 200 spaces below the main deck or machinery spaces only?Paragraph 1.2 is throughout the ship. The intent is to install a temporary flooding alarm system in each space below the main deck, not just machinery spaces.
732/8/22863-51-0013.3Will the temporary flooding alarm system required in paragraph 3.3 be required while the ship is in dry-dock?The temporary systems need to be provided for the duration of the availability
742/9/22992-11-0063.1 - 3.8Is this work item for "out of home port" bidders only?The work item 992-11-006 should be priced by all bidders. This item should be bid for all possible execution areas as an option item that may/may not be invoked prior to the start of the availability.
752/9/22992-11-0143.1 - 3.3Is this work item for "out of home port" bidders only?The work item 992-11-014 should be priced by all bidders. This item should be bid for all possible execution areas as an option item that may/may not be invoked prior to the start of the availability.
762/9/22992-11-0153.1 - 3.11Is this work item for "out of home port" bidders only?The work item 992-11-015 should be priced by all bidders. This item should be bid for all possible execution areas as an option item that may/may not be invoked prior to the start of the availability.
772/9/22992-11-0163.1 - 3.11Is this work item for "out of home port" bidders only?The work item 992-11-016 should be priced by all bidders. This item should be bid for all possible execution areas as an option item that may/may not be invoked prior to the start of the availability.
782/9/22992-11-0173.1 - 3.3Is this work item for "out of home port" bidders only?The work item 992-11-017 should be priced by all bidders. This item should be bid for all possible execution areas as an option item that may/may not be invoked prior to the start of the availability.
792/9/22Attachment J-1245-11-001 & 245-12-0013.8Para 3.8 states to Crate and ship equipment listed in 1.3.2. Para 1.3.2 is for the Propeller Blades. The Propeller Blades are being repaired as per para 3.9 -3.11.4. Please confirm we are shipping the equipment listed in para 1.3.1 (Hub Assembly) vice 1.3.2.Both items in 1.3.1 and 1.3.2 will require shipping as written in the work item
802/9/22466-11-001Para 1.3Paragraph 1.3 identifies (2 ) waveguide services that it indicated are to be removed to allow for the replacement of the multicable penetration. The AN/SRQ-4 system only has one waveguide passing through this penetration, the other waveguide belongs to the AN/SPS-67 RADAR. Paragraph 1.3 needs to be corrected and references added for the AN/SPS-67 RADAR waveguide run.Modified the Work Item in Errata 2 to reflect both systems and added the SPS-67 reference.
812/9/22463-89-001Para 1.3.3Paragraph 1.3.3 identifies Quantity (576 EA) Grommet, Transducer Element, Part Number 770708897P1; but nothing in the work item calls for anything to be accomplished with the equipment identified in para 1.3.3. The grommets normally are not removed or replaced unless they are damaged. Please clarify the repairs required for the grommets listed in para 1.3.3? If no repairs are necessary we recommend removing paragraph 1.3.3 from the work item.Concur . Paragraph 1.3.3 was removed via Errata 3.
822/10/22245-11-0013.8 - 3.8.3On previous availabilities, the blade sets have been sent to a local approved facility (Wartsilla Defense) vice the location listed in paragraph 4.1. Will it be acceptable for the Contractor to send to a local, approved facility instead?WI 245-11-001 does not have para 3.8-3.8.3, paragraph 3 ends at para. 3.2. The information in Para. 4 is not shipping information, para 4.1 identifies the POC for NAVSUP support.
832/10/22245-12-0013.8 - 3.8.3On previous availabilities, the blade sets have been sent to a local approved facility (Wartsilla Defense) vice the location listed in paragraph 4.1. Will it be acceptable for the Contractor to send to a local, approved facility instead?WI 245-12-001 does not have para 3.8.1-3.8.3,.. The information in Para. 4 is not shipping information, para 4.1 identifies the POC for NAVSUP support.
842/10/22456-90-0012.2Please provide reference 450-8877527 Rev A, ShipAlt DDG-51-95970 AWS: SPY-1D Antenna LNA Upgrade Cnsld Elec Dwg & MLMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
852/10/22456-90-0012.3Please provide reference 450-8877526 Rev A, ShipAlt DDG-51-95970 AWS: SPY-1D Antenna LNA Upgrade Strl Fdn Mods & MLMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
862/10/22456-90-0012.4Please provide reference 450-8877529 Rev A, ShipAlt DDG-51-95970 AWS: SPY-1D Antenna LNA Upgrade Piping Mods & MLMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
872/10/22443-12-0013.1, 3.4Is the intent to replace the receiver as listed in paragraph 3.1 or recertify as listed in paragraph 3.4? Please clarify.Paragraph 3.1-3.3 removed from the work item via Errata 4. Per paragraph 3.4, the successful offeror will recertify the receiver IAW 551-4.7.2.5, ref 2.2 refers to appendix C of the same document instructs how to recertify, including surface prep and repainting
882/11/22450-90-0023.8The required heavy weight compound filler listed in paragraph 3.8 has a part number (Dynatron/Bondo 01175) that is discontinued. Will the Government allow lightweight filler to be used instead or provide the material as Government furnished?The heavy weight compound shall meet form fit and function of the listed compound, does not have to be exact compound. Will be contractor provided.
902/11/22Attachment J-2456-90-0012.2 - 2.5, 2.8The Government issued this package 1/28/22 and drawings were later received 2/1/22. We sent a question in 2/4/22 regarding the missing references on this item. Its been 2 weeks into this bidding process and we still have not received drawings listed in 2.2 - 2.5 & 2.8. When can the contractors expect to get these references.Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
912/11/22Attachment J-24720'sThe Contractor asked for the 4720 on 2/4/22 and have not received this very important reference needed for all the shipalts in this package. This package has been out for bid for 2 weeks now without this information. When can the contractors expect to get the required 4720's4720 was uploaded to NMD on February 15th, 2022.
922/11/22259-10-001 & 259-10-0023.6.8Para 3.6.8 requries replacement of deck spool and bolting ring. How many deck spools? What is the location? Is there a drawing to reference for fabrication details?This is going to be "as designated by the SUPERVISOR". Paragraph 3.3 accomplishes a visual inspection with a report, This report will capture what will need to be accomplished. Paragraph 3.6 states as designated by the SUPERVISOR and provides the contractor with all required reference documents applicable to accomplish the work for 3.6.1 through 3.6.9. The required drawing and fabrication drawing will be determined by the inspection.
932/11/22462-08-0013.1.3Paragraph 3.1.3 states "Accomplish pre-installation functional test of hydrophone received in 3.1, in accordance with 2.3. Allowable non-conformance: none." Reference 2.3 does not cover pre-installation testing. Ref 2.3, NOTE 3 states to “Perform pier-side with dome flooded”; this would be the testing following replacement vice pre-installation. NAVSEA 430-1-3029 Rev A54, Acoustic Sensor Shop Test paragraphs 11.7.3 and 11.7.3.1 is normally used for pre-installation testing of the DT-513 hydrophones. Contractor Recommends adding “NAVSEA 430-1-3029 Rev A54, Acoustic Sensor Shop Test” as Reference 2.7 and recommends changing paragraph 3.1.3 to read as follows: (V)(G) "HYDROPHONE PRE-INSTALLATION TESTING" 3.1.3 Accomplish DC Resistance testing of the Hydrophones received in 3.1, in accordance with Paragraphs 11.7.3 and 11.7.3.1 of 2.7. Allowable non-conformance will be in accordance with listed Reference.Corrections as highlighed in the bidders question were included with errata 2
942/11/22Attachment J-1441-71-001Para 3.1Para 1 states to remove existing and install new GFM Radome. The item doesn't mention the mounting hardware. Please confirm the contractor is to reuse the existing mounting hardware for the installation of the new GFM RadomeThe original GFA Radome mounting hardware will be reused for the install.
952/11/22Attachment J-2456-90-0012.9Ref 2.9 states on page 1 "for parts list see PL 8361752. Please provide this drawing for the material needed to fabricate the shipping containersMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
962/11/22Attachment J-1456-90-0013.2.13 & 3.2.13.1Para 3.2.13 & 3.2.13.1 pertain to bonding and grounding. Para 3.1 - 3.1.8 states AIT will accomplish all electrical. Please confirm AIT will accomplish 3.2.13 & 3.2.13.1All electrical work has been removed from work item 456-90-001 via errata 2.
982/14/22321-80-0012.2, 3.1Ref 2.2 – 301-7360941, has 543 tubes on the list of material. Paragraph 3.1 states, "replace 125 each stuffing tubes listed in paragraph 1.3.1." Which 125 tubes will be replaced of the 543 tubes on reference 2.2?Stuffing tube locations will be designated during execution, contractor should bid replacement of 125 type C tubes along with all associated fittings and flexible conduit. Also plan on every tube having at least a 10 degree bend.
992/14/22321-80-0012.2The specifications along with reference 2.2 do not identify any EMI conduit or EMI fittings to be replaced. Will the existing EMI conduit and fittings be retained for reuse?Stuffing tube locations will be designated during execution, contractor should bid replacement of 125 type C tubes along with all associated fittings and flexible conduit. Also plan on every tube having at least a 10 degree bend.
1002/16/22321-80-001Para 3.1- Reference 2.2Ref 2.2 – 301-7360941, has 543 tubes on the LOM. Paragraph 3.1 states to replace 125 each stuffing tubes listed in paragraph 1.3.1 Which 125 tubes will be replaced of the 543 tubes on Ref 2.2?Stuffing tube locations will be designated during execution, contractor should bid replacement of 125 type C tubes along with all associated fittings and flexible conduit. Also plan on every tube having at least a 10 degree bend.
1012/16/22321-80-001Reference 2.2The specifications along with Ref 2.2 do not identify any EMI conduit or EMI fittings to be replaced. Will the existing EMI conduits and fittings be retained for reuseStuffing tube locations will be designated during execution, contractor should bid replacement of 125 type C tubes along with all associated fittings and flexible conduit. Also plan on every tube having at least a 10 degree bend.
1022/16/22443-12-0013.1Para 3.1 requires the replacement of Air Receiver for Ships Whistle, P/N B43080, IAW para 551-4.7.2.1 of 2.2 The referenced tech manual chapter is titled for Installation. No part numbers are identified in this para and the contractor is unable to locate a vendor for this equipment using the part number supplied. It is recommended to make this equipment GFM.The Air Reciever in paragraph 3.1 is to be fabricated by the contractor as CFM.
1032/16/22180-11-0013.1Para 3.1 requires replacement of plate and angle for 4 "ELECTRONIC EQUIPMENT FOUNDATIONS" located at Weatherdeck 01 lvl, Frame 370 to 386, centerline to port, stack deck. It is requested to identify the equipment the foundations are used for and if the equipment needs to be removed as interference. The drawings referenced in 2.2 & 2.3 do not give enough details to identify and fabricate these foundations. Is the steel replacement for all 4 foundations or pieces as designated? Please clarify the work scope for this item.The plate and angle bar replacement is to be designated by the supervisor, contractor should bid on the totals provided in the work item 180-11-001.
1042/16/22251-32-0013.2Para 3.2 rerquires SP-6 surface prep. Para 3.2.1 requires an inspection of spaces listed in para 1.3.1.-1.3.3. Please verify that there is no Insulation to be removed in these areas IOT accomplish the inspection in 3.2.1.Standard interferences should always be accounted for by the bidding contractor IAW NSI 009-23 Cat 1.
1052/16/22251-32-0033.2Para 3.2 rerquires SP-6 surface prep. Para 3.2.1 requires an inspection of spaces listed in para 1.3.1 & 1.3.2. Please verify that there is no Insulation to be removed in these areas IOT accomplish the inspection in 3.2.1.Standard interferences should always be accounted for by the bidding contractor IAW NSI 009-24 Cat 1
1062/16/22443-12-0011.3.1The Mil-Spec MIL-T-15301 identified for the Low Pressure Air Ship's Whistle Receiver in paragraph 1.3.1 is for a 600 PSI Pressure Tank. This Mil-Spec was cancelled in July 13, 1999, with no updates. The Contractor has been unable to obtain pricing. Please provide updated documentation for the required material.Paragraph 3.1-3.3 removed from the work item via Errata 4. Per paragraph 3.4, the successful offeror will recertify the receiver IAW 551-4.7.2.5, ref 2.2 refers to appendix C of the same document instructs how to recertify, including surface prep and repainting
1072/16/22492-61-0012.2Please provide reference 80020-623484 Rev H Visual Landing Aids Installation and Clearance
Requirements.Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1082/16/22980-90-020Please provide reference 8702551 and 437-878712 listed on Attachment A, pages 6-20 of work item.Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1092/16/22150-80-0013.7Please provide table and line for the 009-32 requirements in paragraph 3.7.Preservation of this item in para. 3.7 is covered by "New and Disturbed", contractor should bid using the appropriate Table and Line of 009-32 for the area being repaired
1102/16/22Attachment J-1523-80-0012.2Para 3.1 states to accomplish 2.2, RLAR 64245/DDG79/1167029. The RLAR reads " Limit the scope of this Shipalt to plug welding the carbon steel penetration vent holes only". Please confirm the contractor is not replacing the carbon steel sleeves with CRES 316 material as per reference 2.3 and only plug welding per RLAR in 2.2.Concur, scope of work is limited to plug welding IAW para. 2.2
1302/17/22522-90-0012.3Ref 2.3(drawing 436-8892617 Rev A) List of Material on Sheet 25 lists Item No. 109; 5 each; switch, assembly (2)pushbutton; part# 6981ED242-4-P, Material Source as IAF. This material is LLTM of 30-34 weeks ARO from manufacturer, on previous ships for this ShipAlt (DDG51-80255K) this material was provided as GFM. It is recommended that this equipment be provided as GFM?Concur with bidder that it should be GFM, LAR is being submitted to change from IAF to GFM
1312/17/22456-90-0012.2 - 2.5Please provide the following references:

2.2 - 450-8877527 Rev A

2.3 - 180-8877526 Rev A

2.4 & 2.5 - 505-8877529 Rev A

References for paragraphs 2.4 and 2.5 have the same number (505-8877529) but different titles. Please provide the correct reference for paragraph 2.5.Reference 2.5 should read 505-8877530 corrected on errata 2 Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1322/21/22123-10-001Attachment J-3 & Paragraph 1.2 of 123-10-001The list of tanks in para 1.2 does not match the list on the J-3 tab 123-10-001. Please correct the list of tanks in para 1.2 for the 123-10-001 item.Scope of work for this item has been corrected/edited via Errata 2. Attachment J-3 has been updated to reflect Errata 2 list of tanks.
1332/21/22863-50-001This item is accomplished by the Ships Force and is usually deleted from the specifications in past avails. There is an item 992-11-010 where the contractors will provide T-1 Line for Computer Network. Recommend deleting 863-50-001Work Item 863-50-001 will remain in the work package and the contracter's will need to bid on as written.
1582/22/22259-10-0013.6Para 3.6 requires repairs to exhaust ducts in 1.3.4 thru 1.3.9 but the rpairs do not match the locations. Only 1.3.4 thru 1.3.6 are exhauast ducts. Para 1.3.7 thru 1.3.9 are foundations & bolting rings. Also 3.6.1 thru 3.6.8 are applicable to deck and bulkhead plating not exhaust duct. Para 3.6.9 needs to have a quantity for weld repairs. Para 3.6.5 requires perforated sheathing repairs but no location. Please clarify the locations for each repair listed in para 3.6.1 thru 3.6.9.Work item 259-10-001 has been modified in errata 3 to answer questions and address inconsistancies.
1592/22/22259-10-0023.6Para 3.6 requires repairs to exhaust ducts in 1.3.1 thru 1.3.11 but the repairs do not match the locations. Only 1.3.5 thru 1.3.8 are exhaust ducts. Para 1.3.1 thru 1.3.4 are BLISS caps. Para 1.3.9 thru 1.3.11 are foundation bolting rings. Para 3.6.1 thru 3.6.2.4 is weld repairs. Para 3.6.3 thru 3.6.4 are deck plating & stiffeners. Para 3.6.5 is for perforated sheathing and para 3.6.6 is eductor nozzle repairs. Para 3.6.8 replaces deck spools and bolting rings but gives no location or quatity. Para 3.6.10 is for exhaust duct weld repair but does not designate a quantity. Please clarify the correct locations and quantities for each repair listed in para 3.6.1 thru 3.6.10.Work item 259-10-002 has been modified in errata 3 to answer questions and address inconsistancies.
1602/22/22259-80-001Please confirm that 259-80-001 will be worked in conjunction with 259-10-001 and 259-10-002 as some of the repairs apply to all 3 items. In order to reduce the efforts required IWO intereferences, removals and reinstallations, etc, it is requested that notes be added to these items to be worked in conjuction with each other.Work items should be bid to stand alone, however the invocation of 009-60 will also apply to the scheduling and work conjunction of all items work items. Work in conjunction statements are not allowed to be used in Paragraph 4 IAW the JFMM
1612/22/22562-11-0033.8, 3.8.1, 3.8.3 & 3.8.5In para 3.8 & 3.8.1 it is required to replace 2 zinc anodes, new studs and nuts. Para 3.8.3 & 3.8.5 have the same requirements. Also para 3.8.1 states to use the parts provided in para 5.1.6, this paragraph does not exist. Please confirm that all materials required in 3.8 and 3.8.1 will be provided by the gov't.The requirements in 3.8 & 3.8.1 are mentioning the parts to be replaced. 3.8.3 & 3.8.5 are expanding on the requirements i.e. the stud install IAW 2.10 & 2.11 as well as mentioning 009-12 for welding and 009-32 for paint. The only part needing to be changed is where paragraph 3.8.1 points to 5.1.6 vs 5.1.3. that has been changed to read correctly in errata 3.
1632/23/22521-11-0023.3.1.1What level of cleanliness for the new and disturbed piping is required for paragraph 3.3.1.1? Level II or III? This information is missing from the work item. If Level III, will there still be a requirement for a PCP?Since this is salt water from the Firemain system the 009-09 and the 009-107 have been removed via errata 3. Paragraphs 3.3 - 3.3.1.1 have also been deleted from work item 521-11-02.
1662/24/22438-90-0023.11 - 3.11.2There is not disturbed hydraulic piping in the references or any other reference as to hydrostatic testing etc. of any hydraulic piping. Can the Government provide clarification as to what reference or where the hydraulic piping is located that will require flushing IAW 009-107/009-09?Confirmed there is no hydraulic piping for this hull, used a standard template and did not remove hydraulic piping. No flush of hydraulic piping required.
1713/1/22438-90-001 Errata 22.6-2.8Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.6, RLAR 71726/DDG75/1201822, Revise SIL Braze Fittings to Socket Weld Fittings 2.7, RLAR 71726/DDG71/1202388, Adjust IBNS Trainer FDN to Allow Removals of Maintenance Cover 2.8, RLAR 71726/DDG64/1205174, Foundation for UPS CO SW Does Not Provide Clearance for UPS Connectors

Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1723/1/22438-90-002 Errata 22.12 - 2.15Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.12, RLAR 71604/DDG91/1202335, Add Local Note to Address Clearance of DIU with Above Chilled Water Piping 2.13, RLAR 71604/DDG71/1198462, Reservation 1: This Drawing is to be Shipchecked Prior to Avail 2.14, RLAR 71604/DDG71/1204661, Modify DIU 3 Foundation for Cable Bend Radius and Connector Clearance 2.15, RLAR 71604/DDG71/1199212, Reservation 1: This Drawing is to be Shipchecked Prior to Avail

Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1733/1/22438-90-004 Errata 22.4Please provide the following references that were added to the work item via Amendment 3, Errata 2:
2.4, RLAR 73088/DDG71/1204430, Adjust IOU 91 FDN to Clear BUSMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1743/1/22450-90-001 Errata 22.8 - 2.10Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.8, RLAR 79301/DDG71/1199269, Reservation 1: This Drawing is to be Shipcheck Prior to Avail 2.9, RLAR 79301/DDG71/1199562, Reservation 1: This Drawing is to be Shipcheck Prior to Avail 2.10, RLAR 79301/DDG71/1199791, Reservation 1: Incorporate Shipcheck Changes

Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1753/1/22456-90-001 Errata 22.5Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.5, 505-8877530 Rev A, ShipAlt DDG-51-95970 AWS: SPY-1D Antenna LNA Upgrade HVAC Mods & ML

Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1763/1/22463-90-001 Errata 22.5 - 2.6Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.5, RLAR 92104/DDG75/1201914, Adding 2EL Flow Switch to CSER for OL-191 (02-04-10) 2.6, RLAR 92104/DDG75/1204266, SUPSHIP Bath Drawing Review Comments

Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1783/1/22482-90-001 Errata 22.7 - 2.8Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.7, RLAR 81961/DDG71/1204846, Incorporate Sponsor’s Comments

2.8. RLAR 81961/DDG71-1204845, Incorporate Sponsor's CommentsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1793/1/22512-90-001 Errata 22.11 - 2.13Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.11, RLAR 74012/DDG71/1199866, Reservation 1: This Drawing is to be Shipchecked Prior to Avail 2.12, RLAR 74012/DDG55/1204108, Thermal Insulation Requirement for Supply Vent in Fwd VLS

2.13, RLAR 74012/DDG71/1203763, Remove CC042 CW Supply Pipe Upsizing and Delete Unneeded Condensate Drain SheetsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1803/1/22522-90-001 Errata 22.5Please provide the following references that were added to the work item via Amendment 3, Errata 2:
2.5, RLAR 80255/DDG71/1204040, Insufficient Cable Length Circuit Number FO-C-F101-M4Missing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1813/1/22651-90-001 Errata 22.11 - 2.16Please provide the following references that were added to the work item via Amendment 3, Errata 2:

2.11, RLAR 71605/DDG71/1201407, Obsolete Holding/Proofing Cabinet; No Equal Alternative is Currently Approved for use per GSO 2.12, RLAR 71605/DDG71/1202156, Add Required Fitting to Deck Drain 2.13, RLAR 71605/DDG81/1200553, A006 Pan Steamer Dresser/Tray Issues 2.14, RLAR 71605/DDG89/1203047, Combi Oven Drain in Crew / CPO Galley has Stainless Steel Fitting for Drain;

2.15, RLAR 71605/DDG71/1205346, Revise Duplicate General Notes 7 & 9 by Using Correct Welding Note for 9

2.16, RLAR 71605/DDG89/1202661, Relocate Vent Damper Over Ice Machine & Mod Ceiling Access as Req'dMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1923/3/22Attachment J-1438-90-0012.6 - 2.8With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1933/3/22Attachment J-1438-90-0022.12 - 2.15With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1943/3/22Attachment J-1438-90-0042.4With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1953/3/22Attachment J-1450-90-0012.8 - 10With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1963/3/22Attachment J-1463-90-0012.5, 2.6With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1973/3/22Attachment J-1462-08-0012.2With the issuance of Errata 2, a reference was added to the specification, however was not provided. Please provide the required referenceMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1983/3/22Attachment J-1482-90-0012.7, 2.8With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
1993/3/22Attachment J-1512-90-0012.11- 2.13With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
2003/3/22Attachment J-1522-90-0012.5With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil
2013/3/22Attachment J-1651-90-0012.11 - 2.16With the issuance of Errata 2, RLARs were added to the specification, however were not provided. Please provide the required RLARsMissing reference(s) will be available upon request from SEA 02. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialist at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil