This solicitation seeks proposals for the USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA). The Naval Sea Systems Command is soliciting proposals under solicitation number N00024-21-R-4422 to execute maintenance, modernization, and repair of the USS ROSS from July 2022 through November 2023 at a East/Gulf Coast location. Interested offerors must register in the System for Award Management and Procurement Integrated Enterprise Environment systems to receive solicitation attachments and submit proposals, with a single award expected to be made by July 2022. The availability requires extensive facility capabilities and workforce resources across multiple maintenance and modernization areas. As the Government determined there are no capable small businesses, the procurement will not be set aside for small business.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPI FORM
| USS ROSS (DDG 71) FY22 EDSRA N00024-22-R-4422 | Section F | |||||||||
| Attachment S-3 Pre-Proposal Information (PPI) Form | ||||||||||
| Section G | ||||||||||
| Contracting Officer: Mike Hammersley | (202)781-3149 | Section H | ||||||||
| Contract Specialist: Danielle Bences | (202)781-3732 | Section I | ||||||||
| Master # | Date of Request: | Section | Work Items/CSWT # | Para. # | Page #: | Attach. # | Contractor Question | Government Response | Section J | |
| 17 | 2/2/22 | 631-12-001 | 3.2.6 | Will it be required to remove the equipment from the foundations? | No, equipment will not be required to be removed from the foundations. | |||||
| 18 | 2/2/22 | 631-13-001 | 3.2 | Para 3.2 requires that Surface Prep SSPC-6 be accomplished for location in 1.2. Para 3.4 requires that 200 sq. ft of insulation be replaced. Please confirm the only requirement for insulation replacement is 200 sq. ft. total based on report from para 3.3.1 | The insulation requirement for replacement is 200 sq. ft. | |||||
| 19 | 2/2/22 | 631-13-002 | ALL | Para 3.2 requires that Surface Prep SSPC-6 be accomplished for location in 1.2. Para 3.4 requires that 200 sq. ft of insulation be replaced. Please confirm the only requirement for insulation replacement is 200 sq. ft. total based on report from para 3.3.1 | The insulation requirement for replacement is 200 sq. ft. | |||||
| 20 | 2/2/22 | 631-13-003 | ALL | Para 3.2 requires that Surface Prep SSPC-6 be accomplished for location in 1.2. Para 3.4 requires that 200 sq. ft of insulation be replaced. Please confirm the only requirement for insulation replacement is 200 sq. ft. total based on report from para 3.3.1 | The insulation requirement for replacement is 200 sq. ft. | |||||
| 21 | 2/2/22 | 631-13-004 | ALL | Para 3.2 requires that Surface Prep SSPC-6 be accomplished for location in 1.2. Para 3.4 requires that 200 sq. ft of insulation be replaced. Please confirm the only requirement for insulation replacement is 200 sq. ft. total based on report from para 3.3.1 | The insulation requirement for replacement is 200 sq. ft. | |||||
| 22 | 2/2/22 | 863-50-001 | ALL | This item is accomplished by the Ships Force and is usually deleted from the specifications in past avails. There is an item 992-11-001 where the contractors will provide T-1 Line for Computer Network. Recommend deleting 863-50-001 | WI 863-50-001 is a valid work item. 992-11-001 is for providing Demineralized Water, and does not state anything about providing a T-1 Line. | |||||
| 26 | 2/2/22 | 992-11-004 | ALL | The subject item requirements are for Ocean Towing. This appears to be for non-home port availabilities. Please confirm that no pricing is required for the home port offerors in Norfolk, VA. | Bidders in Nofolk, VA are not required to price this item | |||||
| 27 | 2/2/22 | 992-11-015 | ALL | This item appears to be for non-home port availabilities. Please confirm that no pricing is required for the home port offerors in Norfolk, VA. | Bidders in Nofolk, VA are not required to price this item | |||||
| 28 | 2/2/22 | 992-11-016 | ALL | This item appears to be for non-home port availabilities. Please confirm that no pricing is required for the home port offerors in Norfolk, VA. | Bidders in Nofolk, VA are not required to price this item | |||||
| 32 | 2/2/22 | Attachment J-2 | 472-00-001 | 2.2 | Ref. 2.2 Lists OrdAlt 80831, Change 4, however, the Contractor received Change 2. Please provide Change 4 or revise the specification to reflect the correct Change | OrdAlt 80831, Change 4 is available in NMD. | ||||
| 33 | 2/2/22 | Attachment J-1 | NA | NAVSEA STANDARD ITEMS | The solicitation does not indicate what change to the FY22 Standard Items the Contractors are to utilize. The Standard Item Listing that came with the specification package indicated CH 1 apply. Please confirm, the contractor is to use Standard Item FY22 CH 1 | Yes this is FY-22 CH 1 | ||||
| 37 | 2/4/22 | 624-12-001 | 3.1 | Will the door that is provided as GFM already have the modifications required by 2.4 thru 2.6 or is the contractor required to make these nodifications to the door? | The Contractor will be required to make the noted/referenced modifications. | |||||
| 45 | 2/7/22 | 438-90-003 | 2.12 | Please provide reference 4720-DDG71-FY22. | Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Mike Hammersley, Contracting Officer and Danielle Bences, Contract Specialists at james.m.hammersley.civ@us.navy.mil and danielle.m.bences.civ@us.navy.mil | |||||
| 49 | 2/7/22 | 980-90-020 | 3.9.3 | Paragraph 3.9 reads "provide 240 each of rigging services." Is this 240 mandays or 240 labor hours? Please clarify and revise work item. | Para 3.9 is for rigging labor hours | |||||
| 51 | 2/7/22 | 980-90-020 | 3.3 | Paragraph 3.3 requires the Contractor to remove each legacy equipment listed on Attachment A. Will this equipment be electrically and mechanically disconnected by the AIT Team? | Para 3.3 yes the legacy equipment will be electrically and mechanically disconnected by the AIT | |||||
| 52 | 2/7/22 | 980-90-020 | 3.3 | Paragraph 3.3 requires the Contractor to install mechanically equipment listed on Attachment A. Will this equipment be electrically and mechanically connected by the AIT Team? If equipment is to be mechanically connected by the Contractor, please provide a parts list for the needed hardware? | Para 3.3 yes the new equipment will be mechanically and electrically connected by the AIT. AIT is responsible for all grounding and bonding. | |||||
| 53 | 2/7/22 | 980-90-020 | 3.16 | Paragraph 3.16 requires the Contractor to provide rigging services to accomplish final alignment, templating, drilling, shimming, bolting, bonding and grounding of equipment onto the foundations. Is the intent of this paragraph to provide rigging support to the AIT Team? | Yes. Provide rigging support, refer to Attachment A as referenced in the work item 980-90-020. | |||||
| 56 | 2/7/22 | 993-21-001 | 3.1 - 3.7 | The intent of this work item is to resurface the AN/SPY-1 Antenna Arrays and work item 980-90-012 replaces all AN/SPY-1 Antenna Arrays. Will item 993-21-001 be removed from the work package? Please advise on which item is correct. | No, WI 980-90-012 and WI 993-21-001 are option items that need to bid on for possible invoking | |||||
| 57 | 2/7/22 | 980-90-016 | 3.1 | Can existing office space be used instead of office trailer required in paragraph 3.10? | Yes can be office or trailer as long as it is separated from the government offices space | |||||
| 58 | 2/7/22 | 980-90-009 | 3.9 | Can existing office space be used instead of office trailer required in paragraph 3.9? | Yes can be office or trailer as long as it is separated from the government offices space | |||||
| 59 | 2/7/22 | 980-90-018 | 3.5 | Can existing office space be used instead of office trailer required in paragraph 3.5? | Yes can be office or trailer as long as it is separated from the government offices space | |||||
| 60 | 2/7/22 | 980-90-008 | 3.9 | Can existing office space be used instead of office trailer required in paragraph 3.9? | Yes can be office or trailer as long as it is separated from the government offices space | |||||
| 61 | 2/7/22 | 980-90-011 | 3.6 | Can existing office space be used instead of office trailer required in paragraph 3.6? | Yes can be office or trailer as long as it is separated from the government offices space | |||||
| 67 | 2/8/22 | 992-11-008 | 3.3 | In para 3.3 it is required to prepare the vessel for Ocean Towing. It appears this item is for Out Of Homeport execution. The 992-11-008 item covers inner harbor towing in para 3.1. It is requested that this item be deferred from pricing by homeport offerors. Confirm that it is not required to price this item for bidders in Norfolk, VA. | Bidders in Nofolk, VA are not required to price this item | |||||
| 68 | 2/8/22 | 992-11-006 | 3.3 | In para 3.3 it is required to prepare the vessel for Ocean Towing. It appears this item is for Out Of Homeport execution. The 992-11-008 Temporary Service item covers inner harbor towing in para 3.1. It is requested that this item be deferred from pricing by homeport offerors. Confirm that it is not required to price this item for bidders in Norfolk, VA. | Bidders in Nofolk, VA are not required to price this item |