N00024-22-R-4422.docx

DOCX document 237 KB Posted

Attached to
USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA)
Solicitation number
N00024-21-R-4422
Issued by

About this file

This solicitation seeks proposals for the USS ROSS (DDG 71) Extended Dry-Docking Selected Restricted Availability (EDSRA) to be performed in Fiscal Year 2022. The Naval Sea Systems Command will award a single contract to complete maintenance, modernization, and repair work at East/Gulf Coast facilities between July 2022 and November 2023. Interested offerors should monitor the SAM.gov page for the full solicitation and amendments released on or around July 2022. Proposals are due through the Procurement Integrated Enterprise Environment system. The solicitation includes restricted attachments that contain key milestones, pricing workbooks, compartment closeout plans, and enclosure information. Offerors must request access to these attachments from the identified contracting personnel. The opportunity is not set aside for small businesses as market research found no two small businesses capable of meeting these complex requirements.

View the file

Other files

File Type Posted
USS ROSS_QA 4.xlsx XLSX spreadsheet
N00024-22-R-4422-0004 Conformed.pdf PDF
N00024-22-R-4422-0004.pdf PDF
USS ROSS_QA 3.xlsx XLSX spreadsheet
N00024-22-R-4422-0003 Conformed.pdf PDF
N00024-22-R-4422-0003.pdf PDF
N00024-22-R-4422-0002 Conformed.pdf PDF
N00024-22-R-4422-0002.pdf PDF
USS ROSS_QA 2.xlsx XLSX spreadsheet
USS ROSS_QA 1.xlsx XLSX spreadsheet
N00024-22-R-4422-0001.pdf PDF
N00024-22-R-4422-0001 Conformed.pdf PDF
(USS ROSS) CDRL Exhibit B - 19AUG21.pdf PDF
(USS ROSS) Attachment J-5 Quality Assurance Surveillance Plan - 27Jul21.docx DOCX document
(USS ROSS) Attachment J-10 Open and Inspect Milestone Reports 26AUG2021.xlsx XLSX spreadsheet
(USS ROSS) Attachment S-3 Pre-Proposal Information (PPI) Form - 7Sep21.xlsx XLSX spreadsheet
(USS ROSS) Attachment J-8 Government Furnished Material (GFM) List - 28Jan22.xlsx XLSX spreadsheet
USS ROSS Attachment J-7 IPTD Events and SMR - 22Oct21.docx DOCX document
USS ROSS Attachment S-7 Proposal Assessment - 28Jan22.xlsx XLSX spreadsheet
(USS ROSS) (DDG 71) Attachment S-5 Eligibility Criteria Data Sheet - 26Jul21.docx DOCX document
(USS ROSS) CDRL Exhibit A - 19Aug21.pdf PDF
(USS ROSS) Attachment S-9 Past Performance Questionnaire - 7Sep21.docx DOCX document
(USS ROSS) CDRL Exhibit C - 19AUGl21.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002422R4422

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0001

1
Lot

TYCOM Base

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, and D - F

FOB: Destination

PURCHASE REQUEST NUMBER: N0002421FR62094

PSC CD: J998

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0002

1
Lot

PMS 407 Base (OMN) CLIN

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, and D - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0003

1
Lot

PMS 407 BASE (OPN) CLIN

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B, and D - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0004

1
Lot

PMS 407/TYCOM Prorate Base (OPN) CLIN

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2

See Notes A, B, and D - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0005

CDRL CLIN

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0006

1
Lot

TYCOM (Option Items)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0007

1
Lot
OPTION
BMD / MDA

FFP

Antenna Array Temporary Staging (WI 991-11-001) for Use by Ship's Force; and AN/SPY-1 Antenna Array Face Resurface (WI 993-21-001) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0008

1
Lot
OPTION
PEO IWS / NSWC PHD

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0009

1
Lot
OPTION
Messing & Berthing Barge - Tow Service

FFP

Messing and Berthing Barge Long Distance Tow Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0010

1
Lot
OPTION
Messing & Berthing Barge-Electrical Serv

FFP

Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Gonzalez (DDG 66) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0011

1
Lot
OPTION
Messing & Berthing Barge-Temp Service

FFP

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Steam Barge; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0012

1
Lot
OPTION
Messing & Berthing Barge-Temp Service

FFP

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0013

1
Lot
OPTION
Messing & Berthing Barge-Temp Service

FFP

Messing and Berthing Barge Steam Temporary Service in Contractor Plant; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0014

1
Lot
OPTION
ShipAlt DDG51-88260K, Ent. Remote Mon HW

FFP

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0015

1
Lot
OPTION
ShipAlt DDG51-88260K, Ent. Remote Mon HW

FFP

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0016

1
Lot
OPTION
ShipAlt DDG51-86222K, NGF Bkft Ph 1 Alt

FFP

ShipAlt DDG51-86222K, NGF Backfit Phase One Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0017

1
Lot
OPTION
ShipAlt DDG51-96840K, Harpoon Weapon Sys

FFP

ShipAlt DDG51-96840K, Harpoon Weapon System Removal; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0018

1
Lot
OPTION
ShipAlt DDG51-81961K and 85114K, TTWCS

FFP

ShipAlt DDG51-81961K and 85114K, Tactical Tomahawk Weapon Control System (TTWCS) V5.4.0.2 and TC2S 5.0.1V7 Hardware; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0019

1
Lot
OPTION
ShipAlt DDG51-81961K and 85114K, TTWCS

FFP

ShipAlt DDG51-81961K and 85114K, TTWCS V5.4.0.2 and TC2S 5.0.1V7, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0020

1
Lot
OPTION
ShipAlt DDG51-80255K, Replace Mag FDS

FFP

ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0021

1
Lot
OPTION
Crew Living Space Hab / BENL-R1075

FFP

Crew Living Space Habitability Project (BENL-R1075) Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0022

1
Lot
OPTION
Crew Living Space Hab / BENL-R9587

FFP

Crew Living Space Habitability Project (BENL-R9587) Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0023

1
Lot
OPTION
Crew Living Space Hab / BCPO-S6212

FFP

CPO Living Space Habitability Project (BCPO-S6212) Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0024

1
Lot
OPTION
Crew Sanitary Space Hab / HENL-R1076

FFP

Crew Sanitary Space Habitability Project (HENL-R1076) Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0025

1
Lot
OPTION
Crew Sanitary Space Hab / HENL-R9588

FFP

Crew Sanitary Space Habitability Project (HENL-R9588) Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0026

1
Lot
OPTION
CPO Sanitary Space Hab / HCPO-S6214

FFP

CPO Sanitary Space Habitability Project (HCPO-S6214) Installation; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0027

1
Lot
OPTION
Eng Change (EC) DDG51-90119K, Navy Cash

FFP

Engineering Change (EC) DDG51-90119K, Navy Cash Equipment Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0028

1
Lot
OPTION
ShipAlt DDG51-75360K, CBSP Tier 3, AIT

FFP

ShipAlt DDG51-75360K, CBSP Tier 3, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0029

1
Lot
OPTION
ShipAlt DDG51-80897K NMT-AN/WSC-9(V)X/KA

FFP

ShipAlt DDG51-80897K NMT-AN/WSC-9(V)X/KA, Alteration Installation Team (AIT) Support; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0030

1
Lot
OPTION
ShipAlt DDG-51-81798K, NAVMACS AIT

FFP

ShipAlt DDG-51-81798K, NAVMACS Technical Refresh Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0031

1
Lot
OPTION
ShipAlt DDG51-84646K SSEE Mod SA 555 AIT

FFP

ShipAlt DDG51-84646K, SSEE Mod SA 555, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0032

1
Lot
OPTION
ShipAlt DDG51-85030K, GBS AIT

FFP

ShipAlt DDG51-85030K, Global Broadcast System (GBS) Receive Broadcast Manager (RBM), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0033

1
Lot
OPTION
ShipAlt DDG51-89715K, SSEE AIT

FFP

ShipAlt DDG51-89715K, Ships Signal Exploitation Equipment (SSEE) Increment F System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0034

1
Lot
OPTION
ShipAlt DDG51-91014K, CANES AIT

FFP

ShipAlt DDG51-91014K, Consolidated Afloat Networks and Enterprise Services (CANES) HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0035

1
Lot
OPTION
ShipAlt DDG51-91027K, GPNTS(V)4, AIT

FFP

ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0036

1
Lot
OPTION
ShipAlt DDG51-95946K, C2P Tech Ref AIT

FFP

ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0037

1
Lot
OPTION
ShipAlt DDG51-86644K USW-DSS AIT

FFP

ShipAlt DDG51-86644K USW-DSS AN/UYQ-100(V)3 to AN-SQQ-89A (V) 15 Interface-CRUDES AIT Support Services; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0038

1
Lot
OPTION
ShipAlt 94979K HM&E Condition System AIT

FFP

ShipAlt 94979K, HM&E Condition System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0039

1
Lot
OPTION
Ship Towing Service; provide

FFP

Ship Towing Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD USS ROSS (DDG 71) DURING FY22 EXTENDED DRY-DOCKING SELECTED RESTRICTED AVAILABILITY (EDSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Extended Dry-Docking Selected Restricted Availability (EDSRA) onboard USS Ross (DDG 71) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0040

1
Lot

Growth associated with CLIN 0001

Growth associated with CLIN 0001. See Attachment J-4.

See Notes A, B, D, E, and F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0041

1
Lot
OPTION
Growth associated with CLIN 0001

FFP

Growth associated with CLIN 0001. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0042

1
Lot
OPTION
Growth associated with CLIN 0001

FFP

Growth associated with CLIN 0001. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0043

1
Lot

Growth associated with CLIN 0001

Growth associated with CLIN 0001. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0044

1
Lot

Growth associated with CLIN 0002

Growth associated with CLIN 0002. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0045

1
Lot

Growth associated with CLIN 0003

Growth associated with CLIN 0003. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0046

1
Lot
OPTION
Growth associated with CLIN 0003

FFP

Growth associated with CLIN 0003. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0047

1
Lot

Growth associated with CLIN 0004

Growth associated with CLIN 0004. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0048

1
Lot
OPTION
Growth associated with CLIN 0004

FFP

Growth associated with CLIN 0004. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0049

1
Lot
OPTION
Growth associated with CLIN 0006

FFP

Growth associated with CLIN 0006. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0050

1
Lot
OPTION
Growth associated with CLIN 0007

FFP

Growth associated with CLIN 0007. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0051

1
Lot
OPTION
Growth associated with CLIN 0007

FFP

Growth associated with CLIN 0007. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0052

1
Lot
OPTION
Growth associated with CLIN 0008

FFP

Growth associated with CLIN 0008. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0053

1
Lot
OPTION
Growth associated with CLIN 0009

FFP

Growth associated with CLIN 0009. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0054

1
Lot
OPTION
Growth associated with CLIN 0010

FFP

Growth associated with CLIN 0010. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0055

1
Lot
OPTION
Growth associated with CLIN 0011

FFP

Growth associated with CLIN 0011. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0056

1
Lot
OPTION
Growth associated with CLIN 0012

FFP

Growth associated with CLIN 0012. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0057

1
Lot
OPTION
Growth associated with CLIN 0013

FFP

Growth associated with CLIN 0013. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0058

1
Lot
OPTION
Growth associated with CLIN 0014

FFP

Growth associated with CLIN 0014. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0059

1
Lot
OPTION
Growth associated with CLIN 0015

FFP

Growth associated with CLIN 0015. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0060

1
Lot
OPTION
Growth associated with CLIN 0016

FFP

Growth associated with CLIN 0016. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0061

1
Lot
OPTION
Growth associated with CLIN 0017

FFP

Growth associated with CLIN 0017. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0062

1
Lot
OPTION
Growth associated with CLIN 0018

FFP

Growth associated with CLIN 0018. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0063

1
Lot
OPTION
Growth associated with CLIN 0019

FFP

Growth associated with CLIN 0019. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0064

1
Lot
OPTION
Growth associated with CLIN 0020

FFP

Growth associated with CLIN 0020. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0065

1
Lot
OPTION
Growth associated with CLIN 0021

FFP

Growth associated with CLIN 0021. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0066

1
Lot
OPTION
Growth associated with CLIN 0022

FFP

Growth associated with CLIN 0022. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0067

1
Lot
OPTION
Growth associated with CLIN 0023

FFP

Growth associated with CLIN 0023. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0068

1
Lot
OPTION
Growth associated with CLIN 0024

FFP

Growth associated with CLIN 0024. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0069

1
Lot
OPTION
Growth associated with CLIN 0025

FFP

Growth associated with CLIN 0025. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0070

1
Lot
OPTION
Growth associated with CLIN 0026

FFP

Growth associated with CLIN 0026. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0071

1
Lot
OPTION
Growth associated with CLIN 0027

FFP

Growth associated with CLIN 0027. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0072

1
Lot
OPTION
Growth associated with CLIN 0028

FFP

Growth associated with CLIN 0028. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0073

1
Lot
OPTION
Growth associated with CLIN 0029

FFP

Growth associated with CLIN 0029. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0074

1
Lot
OPTION
Growth associated with CLIN 0030

FFP

Growth associated with CLIN 0030. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0075

1
Lot
OPTION
Growth associated with CLIN 0031

FFP

Growth associated with CLIN 0031. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0076

1
Lot
OPTION
Growth associated with CLIN 0032

FFP

Growth associated with CLIN 0032. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0077

1
Lot
OPTION
Growth associated with CLIN 0033

FFP

Growth associated with CLIN 0033. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0078

1
Lot
OPTION
Growth associated with CLIN 0034

FFP

Growth associated with CLIN 0034. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0079

1
Lot
OPTION
Growth associated with CLIN 0035

FFP

Growth associated with CLIN 0035. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0080

1
Lot
OPTION
Growth associated with CLIN 0036

FFP

Growth associated with CLIN 0036. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0081

1
Lot
OPTION
Growth associated with CLIN 0037

FFP

Growth associated with CLIN 0037. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0082

1
Lot
OPTION
Growth associated with CLIN 0038

FFP

Growth associated with CLIN 0038. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0083

1
Lot
OPTION
Growth associated with CLIN 0039

FFP

Growth associated with CLIN 0039. See Attachment J-4.

See Notes A - F

FOB: Destination

NET AMT

NOTE A

NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR

1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS ROSS (DDG 71) EDSRA:

a. 101,981 direct labor hours (labor hours) and $3,925,923 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS ROSS (DDG 71) EDSRA work package under CLINS 0040 – 0083.

2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative Contracting Officer’s (ACO) discretion.

3. LOE to completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as (local travel to and from an employee's usual work location), uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.

4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note F.

5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer (ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO. Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’ Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’

6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contractor efforts shall be deducted from the labor hours allocated. Subcontractor efforts and materials shall be deducted from the materials allocated. The balance of labor hours and materials remaining in the LOE to Completion CLINs will be recouped by the Government via final contract modification at the end of the availability.

7. Only authorized direct production labor hours shall be deducted from the LOE to Completion direct labor hour ceiling set forth in Section B, Note A, paragraph 1 above. Per Note B paragraph 2 below, all non-production labor shall be included in the Contractor’s fully burdened labor rate. Non-production hours shall not be included in pricing submitted in support of growth issued under the LOE to Completion CLINs. Additionally, Contractor LOE to Completion pricing shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Contracting Officer.

8. Only authorized material dollars shall be deducted from LOE to Completion material reservation set forth in Section B, Note A, paragraph 1 above. This material reservation consists of the total cost of materials and subcontractor efforts proposed. All subcontractor quotes shall be included in the Change Order Price Analysis (COPA) as per Section C, paragraph 1.13. Material dollars may include freight or duties if specifically itemized on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the settled cost of materials deducted from the material reservation.

9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the ACO in the issuance of one contract modification based on the information received in the final report identified in Section C below, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price. This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials. Each directed work shall receive approval by the SUPERVISOR and the ACO. (“SUPERVISOR” as defined in NAVSEA Standard Item (NSI) 009-01, paragraph 4.3, refers to the local Government activity responsible for the execution and contract administration of Navy maintenance and modernization work.)

NOTE B

NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal submitted in response to Requests for Contract Changes (RCCs), Growth Management Requests (GMRs) and Reservation Task Requests (RTRs) shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

1. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors) Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental Program Management

1. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

1. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.

1. Physical materials are goods that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material burden rate applies to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

1. For growth and new work contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor quotes must be competitively acquired and submitted with the contractor’s COPA in response to RCCs, GMRs and RTRs issued by the Contracting Officer.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .