(USS NITZE) Attachment J-10 20 Open and Inspect Milestone Reports Due - 21Mar22.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
USS NITZE (DDG 94) FY23 DEPOT MODERNIZATION PERIOD (DMP) A0010
Solicitation number
N00024-22-R-4412
Issued by

About this file

This document provides details regarding a federal solicitation for depot modernization period services for the USS NITZE (DDG 94). The Naval Sea Systems Command seeks a highly capable contractor to execute maintenance, modernization, and repair efforts for the USS NITZE's FY23 Depot Modernization Period availability. The solicitation includes 42 line items for work ranging from hull inspection and repair to machinery space preservation. Interested offerors must register in the System for Award Management and monitor the SAM.gov website for release of the solicitation and any amendments. The Government will make a single award for this coast-wide availability in or around January 2023, with an estimated performance period of July 2023 through April 2025 aboard the USS NITZE at its depot location.

View the file

Other files

File Type Posted
N0002422R4412 A0007.pdf PDF
QA_5.xlsx XLSX spreadsheet
N0002422R4412 A0007 conformed.pdf PDF
N0002422R4412 A0006.pdf PDF
N0002422R4412 A0006 conformed.pdf PDF
QA_4.xlsx XLSX spreadsheet
N0002422R4412 A0005.pdf PDF
N0002422R4412 A0005 conformed.pdf PDF
QA_3.xlsx XLSX spreadsheet
N0002422R4412 A0004.pdf PDF
N0002422R4412 A0004 conformed.pdf PDF
N00024-22-R-4412 A0003 conformed.pdf PDF
N00024-22-R-4412 A0003.pdf PDF
(USS NITZE) QA 2.xlsx XLSX spreadsheet
N00024-22-R-4412 A0002.pdf PDF
N00024-22-R-4412 A0002 conformed.pdf PDF
(USS NITZE) QA 1.xlsx XLSX spreadsheet
N00024-22-R-4412 A0001.pdf PDF
N00024-22-R-4412 A0001 conformed.docx DOCX document
(USS NITZE) CDRL Exhibit B - 26Jan22.pdf PDF
(USS NITZE) CDRL Exhibit C - 26Jan22.pdf PDF
(USS NITZE) Attachment S-2 Past Performance Questionnaire - 24Jan22.docx DOCX document
N00024-22-R-4412.pdf PDF
(USS NITZE) Attachment S-9 Past Performance Questionnaire - 8Dec21.docx DOCX document
(USS NITZE) Attachment S-3 Pre-Proposal Information (PPI) Form - 21Jan22.xlsx XLSX spreadsheet
(USS NITZE) Attachment S-7 Proposal Assessment - 7Mar22.xlsx XLSX spreadsheet
(USS NITZE) Attachment J-8 Government Furnished Material (GFM) List - 28Jun22.xlsx XLSX spreadsheet
(USS NITZE) Attachment J-7 IPTD Events and SMR - 8Dec21.docx DOCX document
(USS NITZE) Attachment J-5 Quality Assurance Surveillance Plan - 24Jan22.docx DOCX document
(USS NITZE) CDRL Exhibit A - 26Jan22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prioritized List

USS NITZE (DDG 94) FY23 DMP - J-10 Milestone Reports Due
No.Work ItemTitlePara.Milestone
1110-11-001Underwater Hull; inspect and repair3.2.120% DOCK HIGH
2110-11-002Auxiliary Machinery Room Number One Transverse Bulkhead; inspect and repair3.2.120% DOCK HIGH
3123-10-002Auxiliary Machinery Room Number One Bilge; repair3.4.120% DOCK HIGH
4123-11-001Fuel Oil Service Tank; repair3.2.120% DOCK HIGH
5123-11-004Compensated Fuel Tank; repair3.4.120% DOCK HIGH
6123-17-001Contaminated Oil Tank; repair3.2.120% DOCK HIGH
7123-19-002Waste Water Tank; repair3.2.120% DOCK HIGH
8123-19-005Waste Water Tank; preserve (touch up)3.1.120% DOCK HIGH
9123-21-002Accessible Void; repair3.2.120% DOCK HIGH
10123-22-001Chain Locker and Chain Locker Sump; repair3.2.120% DOCK HIGH
11167-11-001Scuttle, Lower Sonar Dome; repair3.1.1, 3.2.2.220% DOCK HIGH
12245-11-001Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair3.2.2.320% DOCK HIGH
13245-12-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair3.2.2.320% DOCK HIGH
14456-01-001HD-1140/SPY-1D Cooling Skid and HD-1157/SPY Cooling Water Skid; repair and preserve3.4.2.120% DOCK HIGH
15520-11-001Sea Valve and Waster Sleeve; repair and install3.2.1.120% DOCK HIGH
16110-11-003Number 3 Generator Room; repair3.1.1.120% AVAIL LOW
17150-11-001AN/SLQ-32 Platform Deck; repair3.1.120% AVAIL LOW
18152-11-00101 Level Bulkhead; repair3.1.120% AVAIL LOW
19153-11-001Platform Deck and Foundation; accomplish3.2.120% AVAIL LOW
20153-11-00302 Level Deck; repair3.1.120% AVAIL LOW
21153-11-004Replenishment at Sea (RAS) Stations Number 3 and 4 Deck Edge Coaming; repair3.1.120% AVAIL LOW
22155-11-001Bridge Wing Stiffener; replace3.1.120% AVAIL LOW
23156-11-00105 Level Deck; repair3.2.120% AVAIL LOW
24157-11-00106 Level Deck; install3.1.120% AVAIL LOW
25168-11-001Bolted Equipment Removal Plate (BERP); repair3.2.1.120% AVAIL LOW
26184-11-001MK 82 MOD 0 Director Foundation; mill3.2.120% AVAIL LOW
27251-30-001Number One Gas Turbine Module (GTM) Clean Air Intake; repair3.2.2.1, 3.4.120% AVAIL LOW
28251-30-002Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair3.4.120% AVAIL LOW
29251-30-003Number One Gas Turbine Intake; repair3.4.120% AVAIL LOW
30251-30-004Number 2 Gas Turbine Intake; repair3.3.120% AVAIL LOW
31259-10-001Number One Gas Turbine Mixing Room and Uptake; repair3.3.120% AVAIL LOW
32259-10-002Number 2 Gas Turbine Mixing Room and Uptake; repair3.3.120% AVAIL LOW
33259-10-003Gas Turbine (GTRB) Exhaust Duct Collector; repair3.3.120% AVAIL LOW
34529-11-001Damage Control Dewatering Overboard Discharge Piping; repair3.1.1.120% AVAIL LOW
35631-11-001Bilge; preserve3.2.1.120% AVAIL LOW
36631-11-002Bilge; preserve3.2.1.120% AVAIL LOW
37631-12-001Auxiliary Machinery Room Number One; preserve3.1.120% AVAIL LOW
38631-12-002Machinery Space; preserve3.1.120% AVAIL LOW
39631-13-001Collective Protection System (CPS) Zone One Fan Room; repair and preserve3.3.120% AVAIL LOW
40631-13-002Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve3.3.120% AVAIL LOW
41631-13-003Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve3.3.120% AVAIL LOW
42631-13-005Fan Room Deck; preserve3.2.120% AVAIL LOW

File details come from the government source that posted it. Updated .