(USS NITZE) Attachment J-10 20 Open and Inspect Milestone Reports Due - 21Mar22.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- N00024-22-R-4412
About this file
This document provides details regarding a federal solicitation for depot modernization period services for the USS NITZE (DDG 94). The Naval Sea Systems Command seeks a highly capable contractor to execute maintenance, modernization, and repair efforts for the USS NITZE's FY23 Depot Modernization Period availability. The solicitation includes 42 line items for work ranging from hull inspection and repair to machinery space preservation. Interested offerors must register in the System for Award Management and monitor the SAM.gov website for release of the solicitation and any amendments. The Government will make a single award for this coast-wide availability in or around January 2023, with an estimated performance period of July 2023 through April 2025 aboard the USS NITZE at its depot location.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prioritized List
| USS NITZE (DDG 94) FY23 DMP - J-10 Milestone Reports Due | ||||
| No. | Work Item | Title | Para. | Milestone |
| 1 | 110-11-001 | Underwater Hull; inspect and repair | 3.2.1 | 20% DOCK HIGH |
| 2 | 110-11-002 | Auxiliary Machinery Room Number One Transverse Bulkhead; inspect and repair | 3.2.1 | 20% DOCK HIGH |
| 3 | 123-10-002 | Auxiliary Machinery Room Number One Bilge; repair | 3.4.1 | 20% DOCK HIGH |
| 4 | 123-11-001 | Fuel Oil Service Tank; repair | 3.2.1 | 20% DOCK HIGH |
| 5 | 123-11-004 | Compensated Fuel Tank; repair | 3.4.1 | 20% DOCK HIGH |
| 6 | 123-17-001 | Contaminated Oil Tank; repair | 3.2.1 | 20% DOCK HIGH |
| 7 | 123-19-002 | Waste Water Tank; repair | 3.2.1 | 20% DOCK HIGH |
| 8 | 123-19-005 | Waste Water Tank; preserve (touch up) | 3.1.1 | 20% DOCK HIGH |
| 9 | 123-21-002 | Accessible Void; repair | 3.2.1 | 20% DOCK HIGH |
| 10 | 123-22-001 | Chain Locker and Chain Locker Sump; repair | 3.2.1 | 20% DOCK HIGH |
| 11 | 167-11-001 | Scuttle, Lower Sonar Dome; repair | 3.1.1, 3.2.2.2 | 20% DOCK HIGH |
| 12 | 245-11-001 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair | 3.2.2.3 | 20% DOCK HIGH |
| 13 | 245-12-003 | Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair | 3.2.2.3 | 20% DOCK HIGH |
| 14 | 456-01-001 | HD-1140/SPY-1D Cooling Skid and HD-1157/SPY Cooling Water Skid; repair and preserve | 3.4.2.1 | 20% DOCK HIGH |
| 15 | 520-11-001 | Sea Valve and Waster Sleeve; repair and install | 3.2.1.1 | 20% DOCK HIGH |
| 16 | 110-11-003 | Number 3 Generator Room; repair | 3.1.1.1 | 20% AVAIL LOW |
| 17 | 150-11-001 | AN/SLQ-32 Platform Deck; repair | 3.1.1 | 20% AVAIL LOW |
| 18 | 152-11-001 | 01 Level Bulkhead; repair | 3.1.1 | 20% AVAIL LOW |
| 19 | 153-11-001 | Platform Deck and Foundation; accomplish | 3.2.1 | 20% AVAIL LOW |
| 20 | 153-11-003 | 02 Level Deck; repair | 3.1.1 | 20% AVAIL LOW |
| 21 | 153-11-004 | Replenishment at Sea (RAS) Stations Number 3 and 4 Deck Edge Coaming; repair | 3.1.1 | 20% AVAIL LOW |
| 22 | 155-11-001 | Bridge Wing Stiffener; replace | 3.1.1 | 20% AVAIL LOW |
| 23 | 156-11-001 | 05 Level Deck; repair | 3.2.1 | 20% AVAIL LOW |
| 24 | 157-11-001 | 06 Level Deck; install | 3.1.1 | 20% AVAIL LOW |
| 25 | 168-11-001 | Bolted Equipment Removal Plate (BERP); repair | 3.2.1.1 | 20% AVAIL LOW |
| 26 | 184-11-001 | MK 82 MOD 0 Director Foundation; mill | 3.2.1 | 20% AVAIL LOW |
| 27 | 251-30-001 | Number One Gas Turbine Module (GTM) Clean Air Intake; repair | 3.2.2.1, 3.4.1 | 20% AVAIL LOW |
| 28 | 251-30-002 | Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair | 3.4.1 | 20% AVAIL LOW |
| 29 | 251-30-003 | Number One Gas Turbine Intake; repair | 3.4.1 | 20% AVAIL LOW |
| 30 | 251-30-004 | Number 2 Gas Turbine Intake; repair | 3.3.1 | 20% AVAIL LOW |
| 31 | 259-10-001 | Number One Gas Turbine Mixing Room and Uptake; repair | 3.3.1 | 20% AVAIL LOW |
| 32 | 259-10-002 | Number 2 Gas Turbine Mixing Room and Uptake; repair | 3.3.1 | 20% AVAIL LOW |
| 33 | 259-10-003 | Gas Turbine (GTRB) Exhaust Duct Collector; repair | 3.3.1 | 20% AVAIL LOW |
| 34 | 529-11-001 | Damage Control Dewatering Overboard Discharge Piping; repair | 3.1.1.1 | 20% AVAIL LOW |
| 35 | 631-11-001 | Bilge; preserve | 3.2.1.1 | 20% AVAIL LOW |
| 36 | 631-11-002 | Bilge; preserve | 3.2.1.1 | 20% AVAIL LOW |
| 37 | 631-12-001 | Auxiliary Machinery Room Number One; preserve | 3.1.1 | 20% AVAIL LOW |
| 38 | 631-12-002 | Machinery Space; preserve | 3.1.1 | 20% AVAIL LOW |
| 39 | 631-13-001 | Collective Protection System (CPS) Zone One Fan Room; repair and preserve | 3.3.1 | 20% AVAIL LOW |
| 40 | 631-13-002 | Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve | 3.3.1 | 20% AVAIL LOW |
| 41 | 631-13-003 | Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve | 3.3.1 | 20% AVAIL LOW |
| 42 | 631-13-005 | Fan Room Deck; preserve | 3.2.1 | 20% AVAIL LOW |
File details come from the government source that posted it. Updated .