This solicitation seeks proposals for the execution of the USS NITZE (DDG 94) FY23 DEPOT MODERNIZATION PERIOD (DMP) availability. The Naval Sea Systems Command will issue solicitation N00024-22-R-4412 for maintenance, modernization, and repair services to be performed on the USS NITZE from July 2023 through April 2025. Interested parties must register in the System for Award Management and monitor SAM.gov for solicitation documents and amendments. The availability requires extensive facilities and experienced personnel capable of coordinating multiple areas of ship maintenance and modernization. A single award is expected to be made in or around January 2023 to one contractor capable of performing all requirements on the East Coast under a single contract.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPI FORM
| USS NITZE (DDG 94) DMP N00024-22-R-4412 | RFP | ||||||
| Attachment S-3 Pre-Proposal Information (PPI) Form | Attachment J-1 | ||||||
| Contractor Name: | Attachment J-2 | ||||||
| Contractor POC & Phone: | Attachment J-3 | ||||||
| Attachment J-4 | |||||||
| Question # | Date of Request: | Question Area | Work Iem (if applicable) | Section/Para | Contractor Question | Government Response | Attachment J-5 |
| 1 | 8/9/22 | Attachment J-1 | 251-30-003 | 3.5.1 - 3.5.5 | Para 3.5 states to accomplish the following repairs to each intake listed in 1.3. The amounts listed in 3.5.1 through 3.5.5 are significant for all three intakes listed in 1.3. For Example....para 3.5.3 lists 300 SF of Bulkhead plate x 3 spaces = 900 SF. Para 3.5.4 lists 500 SF of deck plate x 3 spaces = 1500 SF and 3.5.5 list 200 LF of stiffeners x 3 spaces = 600 LF. Please confirm the amounts listed in 3.5.1 thru 3.5.5 is a total cumulative amount and not EACH location, as this is an unusually high amount of repair for a DDG and would be very extensive and could drive the repair schedule out beyond the milestones | The requirement to accomplish the following repairs in each intake listed in 1.3 and located in 1.2, using 2.3 through 2.10 for guidance, as designated by the SUPERVISOR: is a statement of inclusion for each location designated. The following subset paragraphs identifying total removal or repairs represents a cumulative total for the combined spaces identified in 1.3. |