This solicitation seeks proposals for the USS NITZE (DDG 94) FY23 DEPOT MODERNIZATION PERIOD (DMP). The availability includes maintenance, modernization, and repair work requiring a capable contractor with substantial facilities and human resources. The Naval Sea Systems Command will award a single coast-wide contract to a single contractor to complete this 21-month availability beginning in July 2023 and concluding in April 2025. Interested parties must request access to restricted attachments and drawings from the specified Contract Specialists and Technical Point of Contact. The Government anticipates a single award in January 2023.

View the file

Other files

File Type Posted
N0002422R4412 A0007.pdf PDF
QA_5.xlsx XLSX spreadsheet
N0002422R4412 A0007 conformed.pdf PDF
N0002422R4412 A0006.pdf PDF
N0002422R4412 A0006 conformed.pdf PDF
QA_4.xlsx XLSX spreadsheet
N0002422R4412 A0005.pdf PDF
N0002422R4412 A0005 conformed.pdf PDF
QA_3.xlsx XLSX spreadsheet
N0002422R4412 A0004.pdf PDF
N0002422R4412 A0004 conformed.pdf PDF
N00024-22-R-4412 A0003.pdf PDF
(USS NITZE) QA 2.xlsx XLSX spreadsheet
N00024-22-R-4412 A0002.pdf PDF
N00024-22-R-4412 A0002 conformed.pdf PDF
(USS NITZE) QA 1.xlsx XLSX spreadsheet
N00024-22-R-4412 A0001.pdf PDF
N00024-22-R-4412 A0001 conformed.docx DOCX document
(USS NITZE) CDRL Exhibit B - 26Jan22.pdf PDF
(USS NITZE) Attachment J-10 20 Open and Inspect Milestone Reports Due - 21Mar22.xlsx XLSX spreadsheet
(USS NITZE) CDRL Exhibit C - 26Jan22.pdf PDF
(USS NITZE) Attachment S-2 Past Performance Questionnaire - 24Jan22.docx DOCX document
N00024-22-R-4412.pdf PDF
(USS NITZE) Attachment S-9 Past Performance Questionnaire - 8Dec21.docx DOCX document
(USS NITZE) Attachment S-3 Pre-Proposal Information (PPI) Form - 21Jan22.xlsx XLSX spreadsheet
(USS NITZE) Attachment S-7 Proposal Assessment - 7Mar22.xlsx XLSX spreadsheet
(USS NITZE) Attachment J-8 Government Furnished Material (GFM) List - 28Jun22.xlsx XLSX spreadsheet
(USS NITZE) Attachment J-7 IPTD Events and SMR - 8Dec21.docx DOCX document
(USS NITZE) Attachment J-5 Quality Assurance Surveillance Plan - 24Jan22.docx DOCX document
(USS NITZE) CDRL Exhibit A - 26Jan22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 170 - 181

182 - 199 X H 200 - 208 robert.v.miron.civ@us.navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO 1 208

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

ROBERT V MIRON 443-239-3671

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 84

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

85 - 119 120 - 121

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

122 - 125 126 - 132

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 133 - 142 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 143 - 144 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

145 - 168

PART II - CONTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0002422FR62114

5. DATE ISSUED

02 Aug 2022

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002422R4412

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Lot

TYCOM BASE

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - F

FOB: Destination

PURCHASE REQUEST NUMBER: N0002422FR62114

PSC CD: J998

NET AMT

OPTION TYCOM OPTION

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

PMS 407 BASE

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - F

FOB: Destination

PMS 407 BASE

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - F

FOB: Destination

TYCOM/ PMS 407 BASE

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - F

FOB: Destination

OPTION ShipAlt DDG51-88260K

FFP

ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-94692K

FFP

ShipAlt DDG51-94692K, AN/SPS-73(V) 18 Surface Scan Radar System for Combatant Ships; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-96346K

FFP

ShipAlt DDG51-96346K, AN/SQQ89A(V)15 Tech Refresh W/TI-20 HW;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION OrdAlt 80831K

FFP

OrdAlt 80831K, BMD-MK99 Kill Assessment System (KAS) DDG Illuminator Rolling Airframe Missile (RAM) Material; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-80156K

FFP

ShipAlt DDG51-80156K, AN/SLQ-32(V)6 Surface Electronic Warfare Improvement Program (SEWIP) Block 2 Upgrade; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION CPO Living Space Habitability Project

FFP

CPO Living Space Habitability Project (BCPO-S2033) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION Crew Living Space Habitability Project

FFP

Crew Living Space Habitability Project (BENL-S9406) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION Crew Sanitary Space Habitability Project

FFP

Crew Sanitary Space Habitability Project (HENL-S9408) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION CPO Sanitary Space Habitability Project

FFP

CPO Sanitary Space Habitability Project (HCPO-S2283) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION OrdAlt 85473

FFP

OrdAlt 85473, Spy-1 Solid State Switch, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION OA 91745 and OA 79353

FFP

OA 91745 and OA 79353, MK 41 Vertical Launching System (VLS) Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-88635K

FFP

ShipAlt DDG51-88635K, Close In Weapons System (CIWS) Block 1B Overhaul, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-93155K

FFP

ShipAlt DDG51-93155K, OE-4691(V)1/URN Antenna, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt 80315K

FFP

ShipAlt 80315K, SOPV/MOPV Replacement, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG 94 OA 74588

FFP

ShipAlt DDG 94 OA 74588, Topside KAS Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG 94 95861K

FFP

ShipAlt DDG 94 95861K, AN/USQ-T52A Training Interface Unit, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt 96346, 86222 and 86644

FFP

ShipAlt 96346, 86222 and 86644, AN/SQQ-89 A(V)15 Tech Refresh with T1 20HW AN/UQN-10 NGF (Fathometer) USW-DSS AN/UYQ-100(V)3 to SQQ- 89A(V)15, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-86033K

FFP

ShipAlt DDG51-86033K, Multifunctional Information Distribution System On Ship (MOS) Modification Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-82854K

FFP

ShipAlt DDG51-82854K, DMR IW and MUOS, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-84646K

FFP

ShipAlt DDG51-84646K, Ships Signal Exploitation Equipment (SSEE) Modifications, Alteration Installation Team (AIT) Support Service; provide

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-91014K

FFP

ShipAlt DDG51-91014K, Consolidated Afloat Networks and Enterprise Services (CANES) HW2 Tech Refresh, Alteration Installation Team (AIT) Support Service;

provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-91027K

FFP

ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG-51-93660K

FFP

ShipAlt DDG-51-93660K, JTT-M Replacement Terminal, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG-51-81798K

FFP

ShipAlt DDG-51-81798K, NAVMACS Technical Refresh Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-96034K

FFP

ShipAlt DDG51-96034K, BFTN AN/USQ-195A (V)1 HW, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-95946K

FFP

ShipAlt DDG51-95946K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-87785K

FFP

ShipAlt DDG51-87785K, Link 16 Antenna Replacement, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-93584K

FFP

ShipAlt DDG51-93584K, AIS Cyber Hardening Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-98313K

FFP

ShipAlt DDG51-98313K, VDR Installation Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-71386K

FFP

ShipAlt DDG51-71386K, Advanced Digital Antenna Production (ADAP), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-94692K

FFP

ShipAlt DDG51-94692K, AN/SPS-73(V)18 Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION MachAlt 82560, 83082, 84127 and 82582

FFP

MachAlt 82560, 83082, 84127 and 82582, Helo Hangar Door Package and Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION ShipAlt DDG51-00288K

FFP

ShipAlt DDG51-00288K, Convert Boatswain Storeroom Number 2 to Hazardous Materials Minimization Center, Alteration Install Team (AIT) Support Service;

provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION Messing and Berthing Barge Steam

FFP

Messing and Berthing Barge Steam Temporary Service in Contractor Plant;

provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION Messing and Berthing Barge

FFP

Messing and Berthing Barge Electric Temporary Service in Contractor Plant;

provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION Messing and Berthing Barge Tow Service

FFP

Messing and Berthing Barge Tow Service (Long Distance); provide (OPTION

ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION Messing and Berthing Barge, Temporary

FFP

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Steam Barge; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

OPTION Messing and Berthing Barge

FFP

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS NITZE (DDG 94) DURING FY23 DEPOT MODERNIZATION

PERIOD (DMP) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Depot Modernization Period (DMP) onboard USS NITZE (DDG 94) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

FOB: Destination

Growth Reservation for CLIN 0004

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4

See Notes A, B, and D - F

FOB: Destination

OPTION Growth Reservation for CLIN 0004

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4

See Notes A - F

FOB: Destination

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4

See Notes A - F

FOB: Destination

Growth Reservation for CLIN 0004

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4

See Notes A, B, and D - F

FOB: Destination

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0005

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4

See Notes A - F

FOB: Destination

Growth Reservation for CLIN 0006

FFP

Growth Reservation Associated with CLIN 0006. See attachment J-4

See Notes A, B, and D - F

FOB: Destination

Growth Reservation for CLIN 0007

FFP

Growth Reservation Associated with CLIN 0007. See attachment J-4

See Notes A, B, and D - F

FOB: Destination

Growth Reservation for CLIN 0007

FFP

Growth Reservation Associated with CLIN 0007. See attachment J-4

See Notes A, B, and D - F

FOB: Destination

OPTION Growth Reservation for CLIN 0007

FFP

Growth Reservation Associated with CLIN 0007. See attachment J-4

See Notes A - F

FOB: Destination

Growth Reservation for CLIN 0008

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4

See Notes A, B, and D - F

FOB: Destination

Growth Reservation for CLIN 0008

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4

See Notes A, B, and D - F

FOB: Destination

OPTION Growth Reservation for CLIN 0008

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0009

FFP

Growth Reservation Associated with CLIN 0009. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0010

FFP

Growth Reservation Associated with CLIN 0010. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0011

FFP

Growth Reservation Associated with CLIN 0011. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0012

FFP

Growth Reservation Associated with CLIN 0012. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0013

FFP

Growth Reservation Associated with CLIN 0013. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0014

FFP

Growth Reservation Associated with CLIN 0014. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0015

FFP

Growth Reservation Associated with CLIN 0015. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0016

FFP

Growth Reservation Associated with CLIN 0016. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0017

FFP

Growth Reservation Associated with CLIN 0017. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0018

FFP

Growth Reservation Associated with CLIN 0018. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0019

FFP

Growth Reservation Associated with CLIN 0019. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0020

FFP

Growth Reservation Associated with CLIN 0020. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0021

FFP

Growth Reservation Associated with CLIN 0021. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0022

FFP

Growth Reservation Associated with CLIN 0022. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0023

FFP

Growth Reservation Associated with CLIN 0023. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0024

FFP

Growth Reservation Associated with CLIN 0024. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0025

FFP

Growth Reservation Associated with CLIN 0025. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0026

FFP

Growth Reservation Associated with CLIN 0026. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0027

FFP

Growth Reservation Associated with CLIN 0027. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0028

FFP

Growth Reservation Associated with CLIN 0028. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0029

FFP

Growth Reservation Associated with CLIN 0029. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0030

FFP

Growth Reservation Associated with CLIN 0030. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0031

FFP

Growth Reservation Associated with CLIN 0031. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0032

FFP

Growth Reservation Associated with CLIN 0032. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0033

FFP

Growth Reservation Associated with CLIN 0033. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0034

FFP

Growth Reservation Associated with CLIN 0034. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0035

FFP

Growth Reservation Associated with CLIN 0035. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0036

FFP

Growth Reservation Associated with CLIN 0036. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0037

FFP

Growth Reservation Associated with CLIN 0037. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0038

FFP

Growth Reservation Associated with CLIN 0038. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0039

FFP

Growth Reservation Associated with CLIN 0039. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0040

FFP

Growth Reservation Associated with CLIN 0040. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0041

FFP

Growth Reservation Associated with CLIN 0041. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0042

FFP

Growth Reservation Associated with CLIN 0042. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0043

FFP

Growth Reservation Associated with CLIN 0043. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0044

FFP

Growth Reservation Associated with CLIN 0044. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0045

FFP

Growth Reservation Associated with CLIN 0045. See attachment J-4

See Notes A - F

FOB: Destination

OPTION Growth Reservation for CLIN 0046

FFP

Growth Reservation Associated with CLIN 0046. See attachment J-4

See Notes A - F

FOB: Destination

NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR

1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS NITZE Depot Modernization Period:

a. 178,965 direct labor hours (labor hours) and $7,107,562 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS NITZE DMP work package under

CLINS 0047 – 0097.

2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative Contracting Officer’s (ACO) discretion.

3. LOE to Completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel to and from an employee's usual work location, uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.

4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note F.

5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer (ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO. Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’ Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’

6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contractor efforts shall be deducted from the labor hours allocated. Subcontractor efforts and materials shall be deducted from the materials allocated. The balance of labor hours and materials remaining in the LOE to Completion CLINs will be recouped by the Government via final contract modification at the end of the availability.

7. Only authorized direct production labor hours shall be deducted from the LOE to Completion direct labor hour ceiling set forth in Section B, Note A, paragraph 1 above. Per Note B paragraph 2 below, all non-production labor shall be included in the Contractor’s fully burdened labor rate. Non-production hours shall not be included in pricing submitted in support of growth issued under the LOE to Completion CLINs. Additionally, Contractor LOE to Completion pricing shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Contracting Officer.

8. Only authorized material dollars shall be deducted from LOE to Completion material reservation set forth in

Section B, Note A, paragraph 1 above. This material reservation consists of the total cost of materials and subcontractor efforts proposed. All subcontractor quotes shall be included in the Change Order Price Analysis (COPA) as per Section C, paragraph 1.13. Material dollars may include freight or duties if specifically itemized on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the settled cost of materials deducted from the material reservation.

9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the

ACO in the issuance of one contract modification based on the information received in the final report identified in Section C below, which will be a final settlement for all LOE to Completion labor hours and material dollars.

Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price. This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials. Each directed work shall receive approval by the SUPERVISOR and the ACO.

“SUPERVISOR” as defined in NAVSEA Standard Item (NSI) 009-01, paragraph 4.3, refers to the local Government activity responsible for the execution and contract administration of Navy maintenance and modernization work.

NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND

NEW WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully burdened ship repair growth labor rate and fully burdened ship repair new work labor rate will be used for negotiating growth and new work, respectively, to be performed under this contract. The contractor agrees that the number of hours included in its price proposal submitted in response to Requests for Contract Changes (RCCs), Growth Management Requests (GMRs) and Reservation Task Requests (RTRs) for either Growth or New Work shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed for either growth or new work, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors) Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support

Handling & Warehousing Safety/Environmental Program Management

3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.

5. Physical materials are goods that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material burden rate applies to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

6. For growth and new work contract changes involving subcontractors, subcontractor quotes will be treated as

Other Direct Costs (ODCs) and will be subject to the contract material…