N00024-22-R-4412 A0002.pdf

PDF 648 KB Posted

Attached to
USS NITZE (DDG 94) FY23 DEPOT MODERNIZATION PERIOD (DMP) A0010
Solicitation number
N00024-22-R-4412
Issued by

About this file

This document summarizes a solicitation for the USS NITZE (DDG 94) FY23 DEPOT MODERNIZATION PERIOD (DMP). The Naval Sea Systems Command seeks a single contractor to complete maintenance, modernization, and repair of the USS NITZE from July 2023 through April 2025. Interested parties must register in the System for Award Management and monitor SAM.gov for the full solicitation and amendments. The solicitation will be issued via SAM.gov and DoD SAFE. Offerors must request access to restricted attachments from the contract specialists. The Government anticipates a single award in January 2023. This 21-month availability is not set aside for small businesses due to its complexity, magnitude and duration.

View the file

Other files

File Type Posted
N0002422R4412 A0007.pdf PDF
QA_5.xlsx XLSX spreadsheet
N0002422R4412 A0007 conformed.pdf PDF
N0002422R4412 A0006.pdf PDF
N0002422R4412 A0006 conformed.pdf PDF
QA_4.xlsx XLSX spreadsheet
N0002422R4412 A0005.pdf PDF
N0002422R4412 A0005 conformed.pdf PDF
QA_3.xlsx XLSX spreadsheet
N0002422R4412 A0004.pdf PDF
N0002422R4412 A0004 conformed.pdf PDF
N00024-22-R-4412 A0003 conformed.pdf PDF
N00024-22-R-4412 A0003.pdf PDF
(USS NITZE) QA 2.xlsx XLSX spreadsheet
N00024-22-R-4412 A0002 conformed.pdf PDF
(USS NITZE) QA 1.xlsx XLSX spreadsheet
N00024-22-R-4412 A0001.pdf PDF
N00024-22-R-4412 A0001 conformed.docx DOCX document
(USS NITZE) CDRL Exhibit B - 26Jan22.pdf PDF
(USS NITZE) Attachment J-10 20 Open and Inspect Milestone Reports Due - 21Mar22.xlsx XLSX spreadsheet
(USS NITZE) CDRL Exhibit C - 26Jan22.pdf PDF
(USS NITZE) Attachment S-2 Past Performance Questionnaire - 24Jan22.docx DOCX document
N00024-22-R-4412.pdf PDF
(USS NITZE) Attachment S-9 Past Performance Questionnaire - 8Dec21.docx DOCX document
(USS NITZE) Attachment S-3 Pre-Proposal Information (PPI) Form - 21Jan22.xlsx XLSX spreadsheet
(USS NITZE) Attachment S-7 Proposal Assessment - 7Mar22.xlsx XLSX spreadsheet
(USS NITZE) Attachment J-8 Government Furnished Material (GFM) List - 28Jun22.xlsx XLSX spreadsheet
(USS NITZE) Attachment J-7 IPTD Events and SMR - 8Dec21.docx DOCX document
(USS NITZE) Attachment J-5 Quality Assurance Surveillance Plan - 24Jan22.docx DOCX document
(USS NITZE) CDRL Exhibit A - 26Jan22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002422FR62114

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

-Provide answ ers to Bidders' Questions -Update Bidders' Questions submission dates for batch #3 and #4 -Provide updated J attachments -Provide Errata 1

1. CONTRACT ID CODE PAGE OF PAGES

J 1 15

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0002422R4412

X 9B. DATED (SEE ITEM 11)

02-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2022

CODE

NAVAL SEA SYSTEMS COMMAND

1333 ISAAC HULL AVENUE SE

WASHINGTON NAVY YARD DC 20376

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002422R4412

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENTS/EXHIBITS/ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

No. Document Attachment S-1 RESERVED Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS)

References Rev 1 Attachment S-3 Pre-Proposal Information (PPI) Form Attachment S-4 Manpower Plan to Actual Data Sheet Attachment S-5 Eligibility Criteria Data Sheet Attachment S-6 RESERVED Attachment S-7 Proposal Assessment Attachment S-8 Pier and Dry-dock Graphical Representation Template Attachment S-9 Past Performance Questionnaire (PPQ)

The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:

Attachment J-1 Specification Package TPPC-DDG94-MARMCN23-CN01 Attachment J-2 Work Item Plans, Drawings and Other References Attachment J-3 Execution Milestones and Key Event Dates Attachment J-4 Pricing Workbook Attachment J-5 Quality Assurance Surveillance Plan Attachment J-6 Subcontracting Plan (to be incorporated upon award) Attachment J-7 Schedule Model Review Attachment J-8 Government Furnished Material (GFM) List Rev 1 Attachment J-9 Compartment Closeout List (NSI 009-81) Attachment J-10 Open & Inspect List

Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003, A005-A009, A011, A014, A016- A017) (Does not include A004, A0010, A012-A0013, or A015) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

INTRODUCTION

A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Firm-Fixed-Price contract to complete the USS NITZE (DDG 94) DEPOT MODERNIZATION PERIOD (DMP).

B. The Government intends to award a single Fixed-Price contract to the Offeror whose proposal represents the Best Value to the Government, utilizing trade off source selection procedures in accordance with FAR 15.101-1 and Section M of this solicitation.

C. ALL INQUIRIES shall be made in writing and directed to CDR Jonathan Pagnucco, Contracting Officer, and Daniel Breedlove, Contract Specialist, at jonathan.p.pagnucco.mil@us.navy.mil, and daniel.j.breedlove.civ@us.navy.mil, respectively. To ensure the Government is able to adequately address and respond to Offeror pre-proposal information (PPI) via amendment, it is requested contractors submit no more than three sets of controlled questions.

The first controlled set of questions shall be submitted on or before 9 August 2022 before 11:59 pm, local time, Washington, DC. The second set of controlled questions shall be submitted on or before 16 August 2022, before 11:59 pm, local time, Washington DC. The third set of controlled questions shall be submitted on or before 30 August 2022, before 11:59 pm, local time, Washington DC. The fourth set of controlled questions shall be submitted on or before 06 September 2022, before 11:59 pm, local time, Washington DC. Each set of questions shall be submitted together in one attachment via email properly titled, “Contractor Name - Submission No. X (1, 2, or 3) as of date XX/XX/XXXX.” Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation. Proposal due date shall not be extended solely on the basis of more than one request, extensive questioning, or requests received after this date and time.

Controlled Set of Bidders Questions Due Date Set 1 9 August 2022 Set 2 16 August 2022 Set 3 30 August 2022 Set 4 06 September 2022

Offerors SHALL NOT submit comments, questions, or inquiries to any Government representative other than the Contracting Officer and Contract Specialist identified herein.

Information contained in the Government’s responses to bidder’s question shall not supersede any information contained in the solicitation (including amendments). In the event of a discrepancy between a response to a bidder’s question and the content of the solicitation, the solicitation shall take precedence.

The Government reserves the right to not answer any more than four sets of PPI requests per contractor, in accordance with the deadlines identified herein.

D. Estimated Award Date: The Government anticipates making an award in January 2023.

E. Potential Prime Offeror’s Negative Response: The Government requests a negative response from any potential Prime Offeror who, after reviewing this solicitation, does not intend on submitting a proposal.

Negative response are to be delivered to the Contracting Officer and Contract Specialist listed above NLT seven (7) business dates after solicitation release.

II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

A. Proposal Due Date:

1. All copies of proposals (Volumes I & II) shall be received by the Government via DoD SAFE no later than 03 OCTOBER 2022 at 2:00 PM, local time, Washington DC. Only electronic submittal of proposals via DoD SAFE will be permitted. Offerors shall notify the Contracting Officer and Contract Specialist requesting a pick-up request no later than three (3) business days (28 September 2022) prior to the proposal deadline. Late proposals WILL NOT be considered. Partial proposals or attachments WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.

a) Offerors must provide a proposal valid for at least 140 calendar days (20 February 2023) from the proposal due date (03 October 2022). (Complete block 12 of the Standard Form (SF-33).

B. Directions for Electronic Submission of Proposals:

1. Offerors are instructed to submit proposals electronically via the DoD SAFE application located at https://safe.apps.mil.

2. Offerors wishing to submit a proposal in response to this notification shall notify the Contracting Officer and Contract Specialist noted as points of contact (POCs) on this solicitation no later than three

(3) business days prior to the proposal deadline of this solicitation and no earlier than 14 calendar days prior to the proposal deadline. The Offeror shall provide its name and e-mail as contact information so the Government can generate a pick-up request from the DoD SAFE application to be sent to the Offeror, which is valid for 14 calendar days. Upon notification from the Offeror, either the Contract Officer or Contract Specialist will send a DoD SAFE pick-up request. The Offeror shall submit its proposal, and provide email confirmation of tis submission to all POCs identified in paragraph I(C) above.

3. Offerors shall address their package with the RFP number and Offeror’s company name. Offerors shall click the “Confirm Delivery” button within the DoD SAFE app in order to receive a confirmation of pick up by the Government. The DoD SAFE system records the time that files are submitted for transmission. The Offeror is responsible for ensuring that it drops off its proposals and generates a drop-off time prior to the proposal submission date and time. In the event of a dispute of proposal time submission, the pick-up e-mail with the system-generated drop off time within the body of the e-mail shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.

4. Proposals must be submitted as one .zip file per ship/proposal, formatted so that each Volume 1 Price

Volume and each Volume 2 Technical Volume are submitted in separate file folders clearly marked.

Each Volume shall be formatted with separate files submitted for each Factor.

5. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included.

6. Proposal volumes shall be structured as follows:

Proposal Volume Title

USS NITZE

NIT-1 USS NITZE Price Volume NIT-2 USS NITZE Technical Volume

III. GENERAL INFORMATION

A. Ship Checks:

1. The USS NITZE (DDG 94) will NOT be available for ship check prior to the proposal submission due date. Potential Offerors may inspect sister ship, the USS TRUXTUN (DDG 103) in Norfolk, VA, from 29 July 2022 to 9 August 2022. Potential Offerors may inspect sister ship, the USS JAMES E.

WILLIAMS (DDG 95) in Norfolk, VA, from 10 August 2022 to 20 August 2022.

2. To schedule a ship check, Offerors shall email a "Request for Ship Check" to CDR Jonathan Pagnucco and Daniel Breedlove at jonathan.p.pagnucco.mil@us.navy.mil and daniel.j.breedlove.civ@us.navy.mil, respectively. Due to the ship location, additional information will be provided upon request.

3. Participants will be subject to security, safety, and other applicable regulations established by Mid- Atlantic Regional Maintenance Center (MARMC) and ship’s Commanding Officers. Contractors conducting MARMC related work efforts must visit MARMC security website for latest forms and instructions at:

a) http://www.navsea.navy.mil/Home/RMC/MARMC/Visitor-Information/

b) https://www.cnic.navy.mil/regions/cnrma/installations/ns_norfolk/om/pass_and_id.html

B. Specifications and Associated Reference Documentation:

1. Upon request, the Government will provide the Specification Package Work Items and Work Item References.

2. Offerors may request solicitation attachments by submitting a request to:

a) CDR Jonathan Pagnucco at jonathan.p.pagnucco.mil@us.navy.mil, and

b) Daniel Breedlove at daniel.j.breedlove.civ@us.navy.mil

3. Additional work item references not already in the possession of the Offerors, commercially available, listed under 52.211-2, are available through the following websites:

a) https://jedmics.net/

b) https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx

c) https://nsedr.nnsy.navy.mil//

C. Alteration of Solicitation

1. Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

D. Proposal Information

1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, Offerors are advised conclusory statements regarding an Offeror’s experience such as: “the Offeror understands”, “the Offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors shall provide specific and concise information to validate all assertions.

E. Amendments

1. The Government may revise the solicitation at any time by means of an Amendment. It is an Offeror’s responsibility to ensure it is accessing the SAM.gov website to view potential amendments and procurement notifications for this solicitation.

F. Teaming Arrangements

1. Proposals must be submitted by one (1) Prime Contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a Prime Contractor with a unique

Commercial and Government Entity (CAGE) code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), Offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.

G. One-bid Situation

1. If the Government receives only one bid for solicitation N00024-22-R-4412, the Government reserves the right to require certified cost or pricing data in accordance with DFARS 252.215-7008. As identified by the Contracting Officer, additional cost or pricing data will be required in order to determine whether proposed pricing is fair and reasonable or to comply with the statutory requirements of certified cost or pricing data in accordance with 10 USC 2306(a) and FAR 15.403-4. The Offeror agrees to provide any additional data requested within 30 days of notification or sooner. This data shall be submitted in an electronic format. The data package shall be valid for a minimum period of 6 months from the date of submittal. All elements of this electronic package shall be capable of being searched, reproduced and manipulated (i.e. Excel file with formulas vice hard entry or PDF). The proposal shall be completed in accordance with the requirements of FAR 15.406-2, Certificate of Current Cost or Pricing Data; FAR 15.408 Table 15-2, Instructions for Submitting Cost/Price Proposals When Certified Cost or Pricing Data Are Required. Additionally, five years of historical end of year actuals of direct labor rates, indirect pools, and indirect basis shall be provided in the electronic package. The package shall also include certified cost or pricing data for subcontracts that are the lower of either (i) #13.5M or more; or (ii) both more than the pertinent certified cost or pricing data threshold and more than 10 percent of the prime contractor’s proposed price (as per FAR 15. 404- 3 Subcontract Pricing Considerations).

H. Notification of Use of Navy Support Contractors for Official Contract Files

1. NAVSEA currently utilizes support contractors from Serco-IPS Corporation, DELTA Resources, Inc.

(a wholly owned subsidiary of VT Group Holdings, Inc.), Herren Associates Inc. to manage official contract files, including the official file supporting this procurement. NAVSEA may, without further notice, enter into contracts with other contractors for file management services as describe in NAVSEA Standard Text L-204-H003. Please refer to NAVSEA Standard Text L-204-H003 for further details.

IV. PROPOSAL FORMAT

A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory. PROPOSALS

WHICH DO NOT FOLLOW THIS DIRECTION MAY BE REJECTED AS NON-RESPONSIVE

AND THUS INELIGIBLE FOR AWARD. NON-RESPONSIVE PROPOSALS WILL NOT BE

EVALUATED.

B. Electronic Proposals: Electronic Proposals: All proposals shall be submitted via DoD SAFE as outlined above. Pages shall be formatted to 8.5 x 11 inch paper with one inch margins. The text used shall be Times New Roman with a minimum of 12 point font. Any revisions to Offerors’ proposals (if required) shall be submitted in two (2) forms: (1) a final clean revised document; and (2) a redlined document outlining the Offeror’s changes. The Contracting Officer reserves the right to provide any additional instructions regarding revisions to Offerors’ proposals via letter. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section L, paragraph V where required.

C. Page Limits:

1. Volume I (NIT-1)

(a) Factor 1 – Price: No page limitation with the exception of the cover letter which shall not exceed three (3) pages.

2. Volume II (NIT-2)

a) Non-Price Factor 1 (Technical Eligibility): No page limitation

b) Non-Price Factor 2 (Resource Capacity & Schedule):

(1) Emphasis Area A (Manpower): No page limitation, with the exception of the narrative which shall not exceed 20 pages

(2) Emphasis Area B (Physical Resource Capacity): No page limitation, with the exception of the narrative which shall not exceed 10 pages

(3) Emphasis Area C (Production Schedule): No page limitation

c) None-Price Factor 3 (Past Performance): No page limitation

V. PROPOSAL CONTENT

A. VOLUME I: Factor 1: Price

Price Proposal: The price proposal shall not contain non-price factor information.

1. Factor 1: Price: The price proposal shall be comprised of the following documentation:

a) Cover Letter,

b) Signed SF 33 with all amendments acknowledged,

c) Small Business Subcontracting plan per FAR Part 19 (large businesses only),

d) Any Joint Venture / teaming agreements (if applicable),

e) NSI 009-72 Narrative and Supporting Documentation (if applicable),

f) Completed Attachment J-4 and Solicitation Section B carrying forward information from Attachment

J-4, as applicable, containing:

(1) Work Item Pricing for all Base and Option Items,

(2) Daily Extension Rates,

(3) Inter-port Differential (IPD),

(4) Fully Burdened Ship Repair Labor & Material Burden Rate, New Work & Growth Reservation,

(5) NSI 009-72 Reduction (if applicable),

g) Completed Execution Milestones and Key Event Dates (Attachment J-3).

h) Completed Proposal Assessment (Attachment S-7).

2. Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the Offeror shall include the following in the cover letter:

a) Identification of all enclosures included with the proposal,

b) CAGE and SAM Unique Entity Identifier (UEI) numbers for the Prime contractor,

c) Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).

d) Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.

e) For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook

(Attachment J-4) provide an explanation as to why. In addition, if applicable:

(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined)

(although material is proposed), provide an explanation as to why.

(2) For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.

3. Standard Form 33 (SF-33): As part of the price proposal package, the Offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.

4. Small Business Subcontracting Plan (SBSP):

a. An Offeror shall submit a SBSP outlining its strategy for maintaining compliance with FAR 52.219-9 ALT II for the duration of the USS NITZE availability, which includes:

i. A subcontracting goal of 25 percent of an Offeror’s total subcontracting dollars utilizing small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUB-Zone small businesses. Note, the 25 percent goal is inclusive of the congressionally mandated five percent (5%) goal for small disadvantaged business concerns.

ii. Offerors must provide rationale for any proposed plan which does not meet the following thresholds (as applied to total contract dollars):

(1) 25 percent of prime contracts for small businesses;

(2) Five percent of prime and subcontracts for women-owned small businesses;

(3) Five percent of prime contracts and subcontracts for small disadvantaged businesses;

(4) Three percent of prime contracts and subcontracts for HUBZone small businesses;

and

(5) Three percent of prime and subcontracts for service-disabled veteran-owned small businesses.

iii. In addition, Offerors must provide explanation for any SBSP which fails to address all requirements outlined in FAR 52.219-9 ALT II.

iv. A SBSP is NOT REQUIRED from a small business concern.

5. Completed Solicitation Section B and Pricing Workbook (Attachment J-4):

a) Offerors must propose on all contract line items (CLINs) including all base and option CLINs, complete Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED),” complete Section B “NOTE D: SCHEDULE OF DAILY

RATES FOR PIERSIDE AND DRY DOCKING (FULLY BURDENED) FOR PURPOSES OF

A COMPENSABLE EXTENSION TO THE DRY-DOCKING OR DELIVERY DATE,” and complete all tabs of Pricing Workbook (Attachment J-4) to be considered responsive.

b) The Offeror shall submit prices using the Pricing Workbook (Attachment J-4) for all Tabs, including:Work Item Pricing, Daily Extension Rates, Fully Burdened Ship Repair Labor Rate & Material Burden Rates and Total Evaluated Pricing in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between the two, the CLIN price shall govern.

The Pricing Workbook (Attachment J-4) Fully Burdened Ship Repair Labor Rate and Material Burden Rate must match the rates provided in the Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED).” If there is a discrepancy between the two, the Section B Fully Burdened Ship Repair Labor Rate and Material Burden Rate shall govern.

c) Offerors shall insert pricing in all yellow shaded fields in the pricing workbook (Attachment J-4).

6. Inter-port Differential (IPD)

a) The IPD applicable to the USS NITZE (DDG 94) FY23 DMP must be included in all offers and reflects the cost incurred by the Navy to accomplish an availability at a port other than the homeport. The following chart provides the values to be included in all Offerors’ price proposals to determine the Offeror’s total evaluated price.

Location* Differential

Norfolk, VA (Homeport) $39,758 Mayport, FL $1,891,994

Pascagoula, MS $1,302,136 Philadelphia, PA $2,696,717

Bath, ME $3,321,020 Charleston, SC $2,027,528

Mobile, AL $1,681,583

b) An Offerors whose location is not listed in the above Government provided port differential tables shall submit a bidder’s question requesting a Government provided port differential be calculated for the Offeror’s proposed location for the USS NITZE (DDG 94) FY23 DMP.

7. NSI 009-72 Reduction (if applicable)

a) Offeror must provide a narrative as well as other than certified cost or pricing data in accordance with

FAR 15.403-3, supporting the impact of SI 009-72 Security Measures for Surface Combatants and Amphibious ships use of a water barrier, numbered Fleet Commander-approved barge or other physical barrier approved by the numbered Fleet Commander.

B. VOLUME II

Non-Price Proposal: Do not include cost or price information in this volume. The non-price proposal shall be comprised of three (3) factors, as follows:

1. Non-Price Factor 1 – Technical Eligibility: Offerors must provide the following to demonstrate eligibility for Award (There is no page limit associated with this Factor):

a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier and drydock intended to be used for the proposed availability and indicates that the pier and drydock meet the minimum characteristics identified in Attachment S-5.

b) Provide a completed Execution Milestones & Key Event Dates (Attachment J-3) and a signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones and a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Event Dates (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the offeror is utilizing a subcontractor for physical resources (pier or drydock), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone and/or a drydock capable of docking the vessel from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier and drydock facilities, whether owned by the offeror or subcontractor, must be accessible by the USS NITZE (DDG 94) DMP without any modification to the vessel.

c) In accordance with the most current version of MIL-STD-1625, provide a current drydock certification applicable to the drydock proposed for the Availability. Certifications shall demonstrate the drydock will remain certified from the ‘Dock Vessel’ through ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). If the proposed drydock is currently uncertified, or if the certificate will expire prior to the ‘Undock Vessel’ milestone date, the offeror shall provide a detailed plan and schedule to certify or re-certify the drydock in order to remain certified through the period between the ‘Dock Vessel’ and ‘Undock Vessel’ milestones as outlined in the Execution Milestones & Key Events (Attachment J-3). Certification or recertification plans shall include timeline to complete the requirements of MIL-STD-1625 including the below items. Offeror’s plan shall provide a plan of action and milestones (including specific dates or timeframes) to commence and complete the following actions:

i. Contractor Navy Audit request.

ii. Contractor preparation of facility spaces to be inspected. Contractor shall describe when they expect these facilities to be available to complete necessary inspections and any risks to their availability.

iii. Navy examination of the facility, facility certification report, maintenance program documentation, and operational records.

iv. Navy observation of a docking or undocking operation, whenever possible. In the case of a floating dry dock, this operation shall include a submergence test to the maximum dock draft.

v. Navy evaluation of the control inspection, operating, and maintenance procedures.

vi. Navy preparation of exit brief and formalized in a written report.

vii. Contractor actions to resolve any identified deficiencies. Contractor shall explain the time allotted to deficiency resolution and any associated risks.

viii. Navy examination of actions to resolve deficiencies.

2. Non-Price Factor 2 –Resource Capacity & Schedule:

Offerors must address three Emphasis Areas to demonstrate their ability to provide (a) manpower resources, (b) physical resource capacity, and (c) an executable schedule to complete the solicited requirements:

a) Emphasis Area A – Manpower: To assess the Offeror’s ability to provide efficient manpower to successfully complete the solicited availability, the Government requires the Offeror to provide specified workload data that contains historical workload performance and forecasted workload estimates.

(1) Manpower Performance Data Sheet (Attachment S-4): Provide a completed Manpower

Performance Data Sheet, (Attachment S-4) in Microsoft Excel in the format provided in this solicitation. Include all projects, defined as Navy or Non-Navy Ship Repair and New Construction Projects, for which the Offeror is the prime or a major subcontractor (performing 30% or more of a CNO availability or comparable portion of a Non-Navy project) which were active (on-going or completed) or planned (awarded or proposed) (including the proposal for this solicitation) during the first month identified in Attachment S-4 and the Contract Complete Date of this solicitation.

All projects, which are yet to complete (on-going or planned), require monthly data throughout the full duration. In the case that an on-going project began prior to the date range provided within the S-4, this will require the offeror to modify the S-4 so that the provided data captures the project’s full duration. The Attachment S-4 must capture all work performed by the Offeror within the shipyard and at the local Naval Station, if the Offeror’s shipyard is within the homeport fleet concentration area. The Offeror may estimate performance information for subcontractors based on prime contractor budgets and the prime contractor’s actual outlays to subcontractors. Enter remaining growth work options in the distinguished column/row, using the phasing assumptions provided in Section B Note F.

The “Definitions” tab within Attachment S-4 defines the following terms: Contract / Actual / Forecast Start and Completion Date, Project Status, Time-now, Cumulative Earned Value, Time-phased Earned Value, Full Time Equivalents (FTE), Budget at Complete (BAC), Estimate at Complete (EAC), Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Budget to Complete (BTC), Actual Cost of Work Performed (ACWP), Estimate to Complete (ETC), Cost Performance Index (CPI), To-Complete Cost Performance Index (TCPI), Schedule Performance Index (SPI), Remaining Growth Options, New Work, Prime Contractor Labor, Overtime Labor, Subcontractor Labor, and Temporary Labor.

a) For each project, provide the Earned Value (hours) data on a time phased, month-by-month basis (month-ending) over each project’s duration, from the Actual / Forecast Start Dates to the Actual / Forecast Completion Dates.

b) For each project, verify the cumulative hour values calculated within the S-4 in the “Cumulative EV” tab align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy. Provide the additional project related information requested in the “Cumulative EV” tab (all cells that are green).

c) Provide a list of holiday dates in the “Holiday Calendar” tab. If the monthly reporting dates associated with the monthly earned value data are not aligned to the calendar month, then provide the appropriate values for the “Month Start” and “Month End” in the “Monthly EV” tab (rows 3 and 4). This date information is necessary to convert the monthly hours data into monthly FTE as described in Attachment S-4.

(2) Manpower Charts: Provide manpower charts reflecting the data in Attachment S-4. The manpower charts must represent each project’s ACWP and ETC within the Actual / Forecast Start Date and Actual / Forecast Completion Date for each project provided in Attachment S-4. The manpower charts must show separate stacked areas for each project in the chart. The manpower charts must meet all format requirements stated in “Manpower Charts Format” tab within Attachment S-4. The “Manpower Charts Format” tab within Attachment S-4 includes an example manpower chart formatted to requirements. Provide the following manpower charts:

a) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s remaining outstanding proposals, as provided in Attachment S-4.

b) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s executable award scenario from the Offeror’s remaining outstanding proposals accounting for all un-mitigatable resource conflicts, as provided in Attachment S-4. This manpower chart is not required if it produces the same chart required in (2) a) above.

(3) Manpower Narrative: Provide a narrative to characterize the workload information from the manpower charts required in Section L, paragraph V.B.2a.2.a-b, by describing and quantifying the: historical yard-wide FTE levels, forecasted yard-wide FTE levels, and the composition of historical/forecasted FTE values for: prime straight, prime overtime, subcontracted, and temporary labor. The narrative must explain how and when the Offeror plans to adjust or maintain the current workforce to achieve the proposed forecasted FTE levels and whether the adjustment occurs via additional hiring, use of subcontractors, use of temporary labor, or overtime. Provide supporting data and historical evidence to the maximum extent possible. The narrative should not exceed 20 pages. Address the following possibilities:

a) Any existing constraints between outstanding proposals that would prohibit the Offeror from executing one or more outstanding proposals.

b) Should the Offeror propose to hire additional personnel for the solicited availability, the narrative must quantify the proposed number of hires and describe the plan to hire and manage the additional personnel from Time-now through Contract Completion Date.

c) Should the Offeror propose overtime for the solicited availability, the narrative must include: the historical overtime rate, the forecasted overtime rate, and the plan to manage and provide the overtime from Time-now through Contract Completion Date.

d) Should the Offeror propose temporary labor for the solicited availability, the narrative must include: the historical temporary labor FTE, the forecasted temporary labor FTE, and the plan to manage and provide the temporary labor from Time-now through Contract Completion Date.

e) Should the Offeror propose subcontracted resources for the solicited availability, the Offeror must explain which requirements the prime contractor will complete and which work the subcontractor will complete, including the work item, trade, and duration of each subcontracted requirement. The Government considers the use of subcontractors in excess of 45% of production labor to increase the risk of unsuccessful contract performance. The Offeror must include in its narrative a plan to manage the subcontractor manning levels included from Time-now through Contract Completion Date.

f) The Offeror must explain any atypical circumstances that caused or contributed to poor historical earned value performance. The Offeror must address how its proposed approach for the evaluated project reflects resiliency to atypical causes of risk (e.g.

government furnished material delays or foreseeable trade labor demand).

b) Emphasis Area B – Physical Resource Capacity:

(1) Complete Attachment S-8 Pier and Dry Dock Graphical Representation Template to demonstrate the Offeror has the pier and dry dock available to complete the requirements of the proposed availability. The Attachment S-8 must show (a) the piers and dry docks expected to be in working capacity by month from proposal submission through the Contract Completion Date in Attachment J-3 and (b) the awarded and outstanding projects and work using those resources by month. The Attachment S-8 must include:

a) The piers and dry-docks required to complete work the Offeror currently has under contract based on current contract schedules.

b) The piers and dry-docks required to complete all outstanding proposals, including this proposal, per proposed schedules.

c) The piers and dry-docks required to complete any other anticipated requirements, including but not limited to Non-Navy work, pier and dry-dock upgrades, maintenance or dredging.

(2) Provide a narrative not to exceed 10 pages to support the Attachment S-8 and address:

a) If the Offeror proposes a subcontracted pier or dry dock, explain the resource requirements that the prime contractor will provide and the pier and dry dock that the subcontractor will provide.

b) The Offeror's plan to resolve pier and dry dock resource conflicts as a result of proposed and awarded projects. Piers and dry docks must not be committed to multiple ships during the same time period without explanation.

c) If the Offeror proposes an interval of less than seven days between the unberthing or undocking date of another requirement and the proposed berthing or docking date of this availability or a proposed docking date within the first seven days of this availability, then detail the necessary steps to accomplish this effort.

c) Emphasis Area C - Production Schedule:

(1) Develop a Production Schedule in accordance with the following requirements:

a) Include Key Events, Milestones, tests

b) Schedule each Work Item to the Work Activity level, listing the planned start and planned completion dates, and durations for each Work Activity.

c) Assign each Work Activity with the appropriate predecessor and successor relationships within the contractor’s scheduling software that establish the logic relationship between schedule Work Activities. Each activity must have at least one predecessor and one successor, with the exception of the Key Event Start Availability (which may have no predecessors) and the Key Event Complete Availability (which may have no successors).

Each Event and Activity may have more than one predecessor and more than one successor. The preferred relationships between linked predecessor and successor activities is Finish-to-Start. The use of scheduling Lags and Leads should be minimized.

d) Assign appropriate predecessor relationships to each Key Event and Milestone(s) to ensure there is an accurate logical progression through all work activities leading to their assigned Key Event and Milestone(s), ensure milestones are linked to the Key Events they support, and ensure the Production Schedule supports accurate prediction of Key Event and Milestone(s) attainment.

e) Assign appropriate predecessor and successor relationships between the Work Activities conducted on the same component, or in the same location but under differing Work Items, to ensure all related Work Activities across all Work Items are interdependently linked together.

f) Schedule production work and preliminary inspections generating reports required by Attachment J-10 that could result in a change in work to be accomplished or additional material to be procured to support reporting no later than the first 20 percent of the availability duration.

(2) Provide an export of the Production Schedule data elements in a sortable/filterable spreadsheet format compatible with Microsoft Excel. Include the following minimum data elements for each Work Activity in the schedule, as appropriate:

a) Work Item Number (as appropriate): 4-E specification Work Item number

b) Work Activity Identifier: Numerical designator identifying the Work Activity within the

Work Breakdown Structure (WBS)

c) Title: Descriptive title of Work Item and Work Activity

d) Key Event: Key Event applicable to the Work Activity

e) Milestone (as appropriate): Milestone applicable to the Work Activity

f) System (as appropriate): System(s) affected

g) Component (as appropriate): Component Unit (For example: tank, valve, motor, pump)

h) Location: Work location/compartment number

i) Executing Activity: ID specific organization: Prime Contractor, Sub-Contractor

j) Baseline Start: The date identified in the Production Schedule when the contractor plans to start the Work Activity

k) Baseline Finish: The date identified in the Production Schedule when the contractor plans to finish the Work Activity

l) Early Start: Software determined date. The earliest point in time that a Work Activity may start based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.

m) Early Finish: Software determined date. The earliest point in time that a Work Activity may complete based on the Production Schedule network logic and any other schedule constraints. Early start dates may change as the availability progresses.

n) Late Start: Software determined date. The latest point in time that a Work Activity may begin without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

o) Late Finish: Software determined date. The latest point in time that a Work Activity may be completed without delaying the applicable Milestone or Key Event based on the Production Schedule network logic.

p) Duration: The total number of work periods required to complete a Work Activity.

q) Calendar Identification: Number of scheduled workdays per week

r) Total Float: The total number of workdays that the Contractor can delay a Work Activity without affecting the project finish date.

s) Predecessor: An Activity or Event that immediately precedes one or more Activities or

Events with a direct tie in the Total Project Network.

t) Successor: An Activity or Event that immediately follows one or more Activities or

Events with a direct tie in the Total Project Network.

u) Constraints: Constraints used as applicable to Work Item or Work Activity. This may be provided within the predecessor or successor field.

(3) Provide the Proposed Production Schedule in the Native Software file

(4) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows all work item activities, milestones and key events within the Production Schedule.

(5) Provide the Proposed Production Schedule in a time-oriented Gantt chart format that shows only Critical Path and Controlling Work Items at the Work Activity level and assigned Key Events and/or Milestones.

a) Critical Path: That sequence of Work Activities which forms the work and test chain of the longest duration, and directly affects the completion of the availability. Factors that influence when a Work Activity is on the Critical Path include: time duration required for the Work Activity, space limitations, manpower available, and the predecessor/successor relationships between Work Activities. The Critical Path is determined by automated schedule analysis and will include any sequential set of Work Activities forming the longest chain of events extending throughout the schedule and which has the least Total Float.

b) Controlling Work Items: Those Work Items which include activities that are on the critical path of the Production Schedule, which, by virtue of scope, material requirements, complexity, or other considerations, have the significant potential for impact on the scheduled project Key Events or completion of the availability.

(6) The Offeror shall provide a narrative to explain their Production Schedule. The narrative shall address the following:

a) Describe critical float paths and identify the work items that the Offeror estimates as the most critical and pose the most risk.

b) Demonstrate how the Offeror has scheduled the performance of all work items included in the Availability work package (including both Base and Option items) so as to permit the contract scope increases described in Section B, Note F (all growth work identified in this solicitation) without causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.

3. Non-Price Factor 3 – Past Performance:

Offerors may provide past performance information for up to five (5) previous contracts. If the offeror has not completed any contracts as a prime contractor, within three (3) years of the date of the initial solicitation’s posting to SAM.gov, information regarding the offeror’s performance with regard to subcontracts and/or commercial contracts may be submitted. Offerors shall complete Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide Attachment S-9 Past Performance Questionnaire (PPQ).

Where the offeror does not have recent or relevant past performance information, the Offeror shall affirmatively state that it does not have recent and relevant past performance information for the Government to consider.

If the Offeror does not have CPARS and is required to submit Attachment S-9, the Offeror shall submit a request to their customers to complete the Past Performance Questionnaires (PPQs) NLT 30 days prior to the closing date of this solicitation. The Offerors request to their customer shall include the request to submit completed PPQs to CDR Jonathan Pagnucco, Contracting Officer, jonathan.p.pagnucco.mil@us.navy.mil, and Daniel Breedlove, Contract Specialist, daniel.j.breedlove.civ@us.navy.mil, prior to the closing date of this solicitation.

NOTE: The Government reserves the right to use the contract information provided in the offeror’s proposal to obtain data from other sources, such as the Contractor Performance Assessment Reporting System (CPARS) database and from the points of contact identified by the offeror in its proposal.

Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.

Recent: A contract in-progress or completed within the last three (3) years as of the date of the initial solicitation.

Relevant: A contract that is of similar scope, magnitude, and complexity to the requirements set forth in this solicitation.

Scope: The measure of the similarity in work item requirements as set forth in Attachment J-1 Work Specification Package, and J-2 Plans, Drawings and Supporting References, and other requirements of this solicitation.

Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the requirements of this solicitation.

Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the requirements of this solicitation.

An offeror that does not have recent and relevant past performance to provide for consideration is requested to affirmatively state that it does not have recent and relevant past performance for the Government to consider.

E-mail complete Past Performance Questionnaires to: Name, Contracting Officer, email, and Name, Contract Specialist, email.

All Offerors that are large businesses shall also address historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan (DOD CONTRACTS)) in a separate narrative not to exceed one page.