Ultrasonic Testing Findings 2023.docx

DOCX document 14 KB Posted

Attached to
ADF&G FY27 RV Medeia Shipyard Services - Request for Information (RFI)
Solicitation number
ADF&G FY27 RV Medeia Shipyard Services - Request for Information (RFI)
Issued by
Alaska

About this file

I appreciate your detailed instructions, but I'm unable to access the actual content of the file "Ultrasonic Testing Findings 2023.docx" that you've referenced. You've provided the GovTribe ID and filename, but the document contents themselves have not been included in your message.

To provide the comprehensive summary you've requested, please share the actual text or content from the Ultrasonic Testing Findings 2023 document. Once you provide the file contents, I'll deliver a professional two-paragraph summary following your specified format.

View the file

Other files

File Type Posted
Drawing 4 -1 Medeia Zinc Location & Types -port.jpg JPG image
Elander2014-4.jpg JPG image
10-1 TW-200LP Steel 4 View Drawing.pdf PDF
Drawing 9-1 General Scanting.PDF PDF
MSD INSTRUCTION MANUAL.doc DOC document
Drawing 4 -2 Medeia Zinc Location & Types -starboard.jpg JPG image
Elander2014-6.jpg JPG image
Elander2014-7.jpg JPG image
Elander 2006 Shell Expansion.jpg JPG image
Drawing 17-2 Hold Plan.PDF PDF
Ultrasonic Testing Trouble Spots 2023.docx DOCX document
Drawing 17 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 16-5 Medeia 42 Circuit Panel 5.pdf PDF
Drawing 13-1 General Arrangement for Clad Welding.PDF PDF
Drawing 12-3 Crane Specs.pdf PDF
Elander2014 Ultrasonic Test.jpg JPG image
Elander2006-7.jpg JPG image
Medeia Megger Report 2023.pdf PDF
RV_Medeia_Paint_Specification.docx DOCX document
Drawing 16-3 Medeia 42 Circuit Panels 1 & 2.pdf PDF
Drawing 3 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 5-2 Medeia Rudder Fabrication -Allied.PDF PDF
Elander2014-2.jpg JPG image
Drawing 2-1 Medeia Outboard Profile.pdf PDF
Drawing 5-1 Medeia Rudder Fabrication -Allied.PDF PDF
Drawing 8-1 Medeia Keel Cooler Arrangements Drawing.pdf PDF
Ultrasonic Report 2011.pdf PDF
Elander2006-8.jpg JPG image
Elander KeelCoolers 2006.jpg JPG image
Accuren Ultrasonic Testing Report 2020.pdf PDF
Drawing 12-2 Crane Diagram.pdf PDF
Elander 2006-2.jpg JPG image
Drawing 1-2 Medeia Electrical Service -Shore Tie.jpg JPG image
Drawing 12-1 Medeia Crane Load Chart.pdf PDF
Elander 2006-3.jpg JPG image
Elander 2006-4.jpg JPG image
Elander2006 UltraSonic Test.jpg JPG image
ADF&G RFI 1127018 - FY27 RV Medeia Shipyard Services.pdf PDF
Ultrasonic Thickness Measurements 2011.pdf PDF
Drawing 16-1 Medeia Electrical pilot house panel.PDF PDF
Elander2014-5.jpg JPG image
Drawing 16-4 Medeia 42 Circuit Panels 3 & 4.pdf PDF
Elander 2006-5.jpg JPG image
Drawing 9-2 Trans. Frs & Long'L Section.PDF PDF
Elander2006-6.jpg JPG image
Drawing 1-1 Medeia Docking Plan.pdf PDF
Elander2014-3.jpg JPG image
Drawing 16-2 Medeia Wiring Schematic.pdf PDF
Elander2014-8.jpg JPG image
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Medeia Shipyard 2023 Ultrasonic Testing Reports/Findings/Trouble Areas

· Coffir dams: Port side underneath drip zone on shaft couplers showing wear. New plating installed 2020 Shipyard. Considering painting trouble spots and installing a panel underneath drip zone. Stbd side showing consistent wear on outboard side (3/8” thickness) w/ readings of .265, .287, and .263” on the uphill side of the coffir dam.

· Stern tubes: Port side showing minor diminution on sides and bottom. Top of stern tube showing little wear. Stbd side more consistent overall, but still minor wear on sides and bottom of stern tube.

· Bow area near anchor: Showing some diminution around anchor pulpit and surrounding areas, but nothing too alarming. Remaining areas in anchor winch area fairly consistent with good integrity.

· Transverse belt frame 42: Showing wear on port side vertical panels, lowest reading .298 with surrounding areas around .308, .312.

· Exterior Hull: On the stbd side, fore of the stabilizer it looks like the stabilizer used to continue approx. 10-12 feet farther than existing. Where stabi was removed, along the weld line there is some deep gouging from removing the stabilizer. Something to keep note of, paint seems to be doing its job and no signs of corrosion in gouged areas.

· Bilge Pump under fiddly stairs: Slight diminution in outlet pipe coming from pump. No real concern, but good to keep an eye on.

· Areas underneath Head pumps/Freshwater pumps: There are a couple trouble spots on the bottom hull plates, mainly superficial/paint chipping/minor corrosion. Need to needle gun/prep 88/paint to prevent further corrosion spreading.

· Area underneath reefer compressors: Areas of concern were around shell plating repair done in 2020, areas looked good. Slight areas of diminution inboard of plate repair, just aft of BH Frame 41. Nothing of great concern, worth keeping an eye on.

· SUMMARY: Overall, thicknesses were great. Problem areas were port side coffir dam under the shaft drip zone. Stbd side coffir dam showing general wear on the uphill section (3/8” thickness). Stern tubes are showing slight diminution on the sides and bottom of tube. Frame 42 on the transverse band, vertical panels showing slight wear. Outlet pipe for bilge pump underneath stairs showing slight wear.