This is a technical drawing document related to a state and local contract opportunity for marine vessel equipment. The drawing, designated as Drawing 8-1, illustrates the Medeia Keel Cooler Arrangements and provides detailed specifications for keel cooler system installations. The document appears to be a supporting exhibit that would accompany a larger procurement solicitation for vessel maintenance, repair, or construction services. The drawing includes technical diagrams, dimensional specifications, and engineering details necessary for bidders to understand the scope of work involving keel cooler system configuration and installation requirements. No specific response dates, due dates, award dates, or contract term information is evident from this drawing document alone.

Without additional context from the main solicitation documents, pricing terms, set-asides, funding sources, and other contractual requirements cannot be determined from this technical drawing. The document serves as a reference specification for bidders to understand the mechanical and engineering requirements related to keel cooler arrangements on the vessel named Medeia, which would be essential information for preparing accurate bids and proposals in response to the associated procurement opportunity.

View the file

Other files

File Type Posted
Drawing 4 -1 Medeia Zinc Location & Types -port.jpg JPG image
Elander2014-4.jpg JPG image
Ultrasonic Testing Findings 2023.docx DOCX document
10-1 TW-200LP Steel 4 View Drawing.pdf PDF
Drawing 9-1 General Scanting.PDF PDF
MSD INSTRUCTION MANUAL.doc DOC document
Drawing 4 -2 Medeia Zinc Location & Types -starboard.jpg JPG image
Elander2014-6.jpg JPG image
Elander2014-7.jpg JPG image
Elander 2006 Shell Expansion.jpg JPG image
Drawing 17-2 Hold Plan.PDF PDF
Ultrasonic Testing Trouble Spots 2023.docx DOCX document
Drawing 17 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 16-5 Medeia 42 Circuit Panel 5.pdf PDF
Drawing 13-1 General Arrangement for Clad Welding.PDF PDF
Drawing 12-3 Crane Specs.pdf PDF
Elander2014 Ultrasonic Test.jpg JPG image
Elander2006-7.jpg JPG image
Medeia Megger Report 2023.pdf PDF
RV_Medeia_Paint_Specification.docx DOCX document
Drawing 16-3 Medeia 42 Circuit Panels 1 & 2.pdf PDF
Drawing 3 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 5-2 Medeia Rudder Fabrication -Allied.PDF PDF
Elander2014-2.jpg JPG image
Drawing 2-1 Medeia Outboard Profile.pdf PDF
Drawing 5-1 Medeia Rudder Fabrication -Allied.PDF PDF
Ultrasonic Report 2011.pdf PDF
Elander2006-8.jpg JPG image
Elander KeelCoolers 2006.jpg JPG image
Accuren Ultrasonic Testing Report 2020.pdf PDF
Drawing 12-2 Crane Diagram.pdf PDF
Elander 2006-2.jpg JPG image
Drawing 1-2 Medeia Electrical Service -Shore Tie.jpg JPG image
Drawing 12-1 Medeia Crane Load Chart.pdf PDF
Elander 2006-3.jpg JPG image
Elander 2006-4.jpg JPG image
Elander2006 UltraSonic Test.jpg JPG image
ADF&G RFI 1127018 - FY27 RV Medeia Shipyard Services.pdf PDF
Ultrasonic Thickness Measurements 2011.pdf PDF
Drawing 16-1 Medeia Electrical pilot house panel.PDF PDF
Elander2014-5.jpg JPG image
Drawing 16-4 Medeia 42 Circuit Panels 3 & 4.pdf PDF
Elander 2006-5.jpg JPG image
Drawing 9-2 Trans. Frs & Long'L Section.PDF PDF
Elander2006-6.jpg JPG image
Drawing 1-1 Medeia Docking Plan.pdf PDF
Elander2014-3.jpg JPG image
Drawing 16-2 Medeia Wiring Schematic.pdf PDF
Elander2014-8.jpg JPG image
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .