Drawing 17 -1 Medeia Bilge & Ballast Piping.pdf

PDF 61 KB Posted

Attached to
ADF&G FY27 RV Medeia Shipyard Services - Request for Information (RFI)
Solicitation number
ADF&G FY27 RV Medeia Shipyard Services - Request for Information (RFI)
Issued by
Alaska

About this file

This is a technical drawing document related to ship machinery and piping systems for vessel maintenance or construction. The drawing, titled "Drawing 17-1 Medeia Bilge & Ballast Piping," provides detailed specifications and schematic representations of the bilge and ballast piping systems for a vessel named Medeia. The document illustrates the routing, connections, and configuration of piping used for managing bilge water (water that collects in the lowest part of a ship's hull) and ballast water (water taken on board to maintain vessel stability and trim). The drawing includes dimensional annotations, connection points, valve locations, and material specifications necessary for fabrication, installation, or maintenance of these critical ship systems.

The technical specifications shown in the drawing establish the exact configuration required for the bilge and ballast piping systems to ensure proper functionality and compliance with maritime standards. This type of drawing serves as the authoritative reference document for contractors, fabricators, and installation personnel responsible for constructing, repairing, or maintaining the vessel's fluid management systems. The precise technical details provided would be essential for bidders preparing proposals related to shipbuilding, ship repair, or maritime vessel maintenance contracts involving the Medeia or similar vessels.

View the file

Other files

File Type Posted
Drawing 4 -1 Medeia Zinc Location & Types -port.jpg JPG image
Elander2014-4.jpg JPG image
Ultrasonic Testing Findings 2023.docx DOCX document
10-1 TW-200LP Steel 4 View Drawing.pdf PDF
Drawing 9-1 General Scanting.PDF PDF
MSD INSTRUCTION MANUAL.doc DOC document
Drawing 4 -2 Medeia Zinc Location & Types -starboard.jpg JPG image
Elander2014-6.jpg JPG image
Elander2014-7.jpg JPG image
Elander 2006 Shell Expansion.jpg JPG image
Drawing 17-2 Hold Plan.PDF PDF
Ultrasonic Testing Trouble Spots 2023.docx DOCX document
Drawing 16-5 Medeia 42 Circuit Panel 5.pdf PDF
Drawing 13-1 General Arrangement for Clad Welding.PDF PDF
Drawing 12-3 Crane Specs.pdf PDF
Elander2014 Ultrasonic Test.jpg JPG image
Elander2006-7.jpg JPG image
Medeia Megger Report 2023.pdf PDF
RV_Medeia_Paint_Specification.docx DOCX document
Drawing 16-3 Medeia 42 Circuit Panels 1 & 2.pdf PDF
Drawing 3 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 5-2 Medeia Rudder Fabrication -Allied.PDF PDF
Elander2014-2.jpg JPG image
Drawing 2-1 Medeia Outboard Profile.pdf PDF
Drawing 5-1 Medeia Rudder Fabrication -Allied.PDF PDF
Drawing 8-1 Medeia Keel Cooler Arrangements Drawing.pdf PDF
Ultrasonic Report 2011.pdf PDF
Elander2006-8.jpg JPG image
Elander KeelCoolers 2006.jpg JPG image
Accuren Ultrasonic Testing Report 2020.pdf PDF
Drawing 12-2 Crane Diagram.pdf PDF
Elander 2006-2.jpg JPG image
Drawing 1-2 Medeia Electrical Service -Shore Tie.jpg JPG image
Drawing 12-1 Medeia Crane Load Chart.pdf PDF
Elander 2006-3.jpg JPG image
Elander 2006-4.jpg JPG image
Elander2006 UltraSonic Test.jpg JPG image
ADF&G RFI 1127018 - FY27 RV Medeia Shipyard Services.pdf PDF
Ultrasonic Thickness Measurements 2011.pdf PDF
Drawing 16-1 Medeia Electrical pilot house panel.PDF PDF
Elander2014-5.jpg JPG image
Drawing 16-4 Medeia 42 Circuit Panels 3 & 4.pdf PDF
Elander 2006-5.jpg JPG image
Drawing 9-2 Trans. Frs & Long'L Section.PDF PDF
Elander2006-6.jpg JPG image
Drawing 1-1 Medeia Docking Plan.pdf PDF
Elander2014-3.jpg JPG image
Drawing 16-2 Medeia Wiring Schematic.pdf PDF
Elander2014-8.jpg JPG image
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .