J3 Drawings Amendment.pdf

PDF 3 MB Posted

Attached to
TSS Ductless System at EWR ATCT - Amendment 04
Solicitation number
Not on record
Issued by

About this file

This is a set of technical construction drawings for a TSS (Tactical Surveillance System) ductless air conditioning system installation at Newark Liberty International Airport's Air Traffic Control Tower (ATCT) and Base Building. The project is identified as EWR-25020943 and is under the jurisdiction of the FAA Technical Operations Eastern Service Area.

The scope of work requires installation of three new wall-mounted indoor units (AC-3A, AC-3B, AC-3C) and one outdoor unit (AC-3) to serve as the primary cooling source for the TSS room, with the existing VAV-17 system serving as backup cooling only. The system specifications include 208/230V, three-phase power with a 60-amp equipment disconnect in a NEMA 4X stainless steel enclosure, 3/4-inch EMT conduit for interior installation, and 1-inch RMC with liquid-tight flexible metal conduit for exterior installation. Power requirements are 3 #8 AWG and 1 #10 AWG cables routed through Panel BL1K with a 40-amp breaker. The indoor units operate in parallel controlled by a single wall-mounted thermostat with DDC BACnet interface capability, with setpoints established at 72°F for the new ductless system and 76°F for VAV-17 (heating disabled). All piping, electrical work, and grounding must comply with FAA Standards 019F, FAA-C-1217H, and NFPA 70. The contractor must provide two weeks' notice prior to FAA commissioning and acceptance activities. Roof penetrations and flashing work must be performed by a Carlisle-authorized roofing applicator in accordance with the approved EPDM roofing system with 25-year, 120-mph wind speed warranty requirements.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELEC.

ROOM

MECH.

ROOM

CONFERENCE

ROOM

CHILLER

ROOM

ENGINE

GENERATOR

ROOM

WORK

ROOM

RECEPTION/

LOBBY

OFFICE

OFFICE VEST.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

LOCKER

TOILET

WOMEN

J.C.

MEN

BREAK ROOM

TELCO

EQUIPMENT ROOM

WORK ROOM

TSS SIMULATOR

TRAINING

COPY/FAX

STORAGE

CORRIDOR

C O

R R

ID

O

R

C O

R R

ID

O

R

CORRIDOR

VEST.VEST.

UPS/SWITCHGEAR

VEST.

STOR

OFFICE

OFFICE

STOR

LAN

OFFICE

120 122

124A

141A

144 127

130132

113B

6B

6A

106C

113A

ADMIN. TELCO ROOM

CABLE CHASE

TS

M

CC

-1 M

CC

-2

EBL2A MDPG EBL2

ATS

UPS BATT

ENGINE

GENERATOR

MDPC

UPS

BYPASS

MDPE

MDPN

DP1EDP1

T-EBL1

T-EBH1

277V

ILCPBL2

BL1

T-BH1

(ABOVE)

T-BL-1

(BELOW)

BH1

EBH1

GP-1

DAY

TANK

J

MCC-2

MCC-1

MCC-1

RECEPTION/

LOBBY

OFFICE

VEST.

TSS SIMULATOR

141A

TS

IS

SU

ED

F

OR

ED

M

NJ

2520943

PROJECT ENGINEER, AJW-2E11A

THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM

NEWARK LIBERTY INTERNATIONAL AIRPORT

EATERN SERVICE AREAATO- TECHNICAL OPERATIONS

TERMINAL ENG.

AJW-2E11A

SN

ew r-2

3-e1

.d w g

TSS DUCTLESS SYSTEM INSTALLATION

ATCT & BASE BUILDING

EWR-25020943-E122 ----

NEWARK

PLATFORM MANAGER, AJW-2E11A

12/11/2025

AC-3C

AC-3A AC-3B

EXISTING VAV-17

A M106

KEY NOTES

OUTDOOR UNIT, (AC-3), SHALL BE MOUNTED ON STEEL FRAME, BOLTED TO WALL,

BONDED TO NEAREST ROOF LIGHTNING CONDUCTOR, WITH DRAIN TO NEAREST

STORM-DRAIN.

INDOOR UNITS SHALL BE POWERED VIA THE OUTDOOR UNIT PER

MANUFACTURER'S RECOMMENDATIONS. USE 3#12 AWG, PER UNIT, IN 3/4" EMT

FOR INTERIOR CONDUIT INSTALLATION AND 3/4" RIGID METAL CONDUIT, WITH

LIQUID TIGHT FLEXIBLE METAL CONDUIT, FOR EXTERIOR INSTALLATION.

INSTALL POWER CIRCUIT AND POWER DISCONNECT BETWEEN OUTDOOR UNIT

AND ELECTRICAL ROOM, ROOM 110, PANEL BL1K CK 28/30/32. PROVIDE 3-POLE 40

AMP BREAKER. RELOCATE CIRCUIT 32 TO CIRCUIT 40. RELABEL DEVICES AS

NEEDED IN ROOM 146. POWER CABLES SHALL BE (3) #8 AWG & 1 #10 AWG.

PROVIDE 1” RMC W/ GROUNDING BUSHING ON EXTERIOR INSTALLATION, AND 1”

LIQUID TIGHT WITHIN 6 FEET UNIT. USE EXISTING PULLBOX FOR NEW CIRCUIT

INSTALLATION. 1” EMT IS PERMISSIBLE FOR INTERIOR ELECTRICAL INSTALLATION.

THREE PHASE 208/230V, 60A EQUIPMENT DISCONNECT, NON-FUSED, NEMA 4X,

STAINLESS STEEL ENCLOSURE AND HARDWARE

PROVIDE AND INSTALL 2" RMC CONDUIT ACCESS THROUGH EXISTING ROOF

DECKING. INSTALLATION IS ENTIRELY ABOVE DROP CEILING AND ROOF. BOND

NEW PIPE ACCESS TO NEAREST ROOF LIGHTNING PROTECTION SYSTEM RING.

SEE DETAIL 4/M505.

ALL THREE INTERIOR UNITS ARE CONTROLLED IN PARALLEL FROM SINGLE WALL

MOUNTED THERMOSTAT (OR DDC BACNET INTERFACE).

2 2

GENERAL NOTES:

1. INSTALL (3) NEW WALL-MOUNTED INDOOR UNITS AND (1) OUTDOOR UNIT PER

MANUFACTURER'S RECOMMENDATIONS, WITH ALL GROUNDING/BONDING AND

ELECTRICAL WORK AS DEFINED IN THE FAA STANDARDS 019F, FAA-C-1217H,

AND LATEST REVISION OF NFPA 70. THE FAA WILL PERFORM COMMISSIONING

FOR ACCEPTANCE OF INSTALLED EQUIPMENT. CONTRACTOR MUST PROVIDE

A MINIMUM OF 2-WEEKS' NOTICE PRIOR TO ANY REVIEW OR ACCEPTANCE

ACTIVITIES.

2. PROVIDE AND INSTALL BACNET IO MODULE.

3. SYSTEM TO INCLUDE BACNET COMMUNICATIONS CAPABILITY. PROVIDE

CONNECTION TO EXISTING DDC SYSTEM INCLUDING BACNET POINTS AND

GRAPHICS. SUBMIT DDC CONNECTION PLAN, POINT SELECTION, AND ALL

PROPOSED GRAPHICS TO COR FOR APPROVAL PRIOR TO INSTALLATION.

SEQUENCE OF OPERATIONS:

1. THE INTENT OF THE DUCTLESS SYSTEM INSTALLATION IS FOR NEW

EQUIPMENT TO SERVE AS THE PRIMARY COOLING SOURCE IN THE TSS ROOM,

WITH THE EXISTING HVAC SYSTEM (VAV-17) SERVING AS BACKUP COOLING

ONLY.

2. THE CONTRACTOR IS ADVISED THAT BMS PROGRAMMING SERVICES WILL BE

REQUIRED TO CONNECT, PROGRAM, AND INTEGRATE THE NEW MINI-SPLIT

SYSTEM INTO THE EXISTING BMS CONTROLS SYSTEM. THIS INCLUDES

ESTABLISHING OR MODIFYING RESET SETPOINTS FOR BOTH THE NEW

DUCTLESS SYSTEM, AND EXISTING EQUIPMENT (VAV-17 AND AHU-3). THE

AHU-3 SUPPLY AIR COOLING SETPOINT TO BE CHANGED FROM "MANUAL" TO

"AUTOMATIC" MODE, ACTIVATING SUPPLY AIR RESET.

3. SET POINTS SHALL BE AS FOLLOW:

3.1. INDOOR UNIT SET POINT = 72 F

3.2. VAV-17 SET POINT = 76 F, HEATING TO BE DISABLED

AC-3

SCALE: 1/8" = 1'-0"

8' 16'08'

SCALE: 3/8" = 1'-0"

4' 6'2'02'

KEY PLAN

EXISTING BOILER

BAS PANEL

PANEL

BL1

M505

ELECTRICAL

ROOM

AC-3

AC-3

DROP CEILING AS SHOWN,

INCLUDING TSS ROOM.

EXISTING

LIGHTNING

PROTECTION

SYSTEM

Geovanni Santos Rectangle

Geovanni Santos Arc

Geovanni Santos Polygon

Geovanni Santos Rectangle

Geovanni Santos Polygon

Geovanni Santos Text Box PROVIDE AND INSTALL ALL ELECTRICAL RACEWAYS, CONDUCTORS, AND CONNECTIONS REQUIRED TO SERVE (3) CONDENSATE PUMPS. PROVIDE DEDICATED POWER CIRCUIT FROM PANEL BL1, INCLUDING ALL REQUIRED OVERCURRENT PROTECTION. INSTALL AND CONNECT PUMPS IN ACCORDANCE WITH THE MANUFACTURER’S INSTALLATION INSTRUCTIONS.

Geovanni Santos Text Box

Geovanni Santos Text Box

Geovanni Santos Text Box

Geovanni Santos Text Box

1 4/2/2026 CONDENSATE PUMP CLARIFICATION

Geovanni Santos Architect

Geovanni Santos Architect

Geovanni Santos Cloud

Geovanni Santos Architect

Geovanni Santos Text Box

Geovanni Santos Architect

Geovanni Santos Arc

Geovanni Santos Rectangle

Geovanni Santos Arc

Geovanni Santos Polygon

Geovanni Santos Cloud

Geovanni Santos Cloud

Geovanni Santos Cloud

Geovanni Santos Text Box

ELEC.

ROOM

MECH.

ROOM

CONFERENCE

ROOM

CHILLER

ROOM

ENGINE

GENERATOR

ROOM

WORK

ROOM

RECEPTION/

LOBBY

OFFICE

OFFICE VEST.

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

LOCKER

TOILET

WOMEN

J.C.

MEN

BREAK ROOM

TELCO

EQUIPMENT ROOM

WORK ROOM

TSS SIMULATOR

TRAINING

COPY/FAX

STORAGE

CORRIDOR

C O

R R

ID

O

R

C O

R R

ID

O

R

CORRIDOR

VEST.VEST.

UPS/SWITCHGEAR

VEST.

STOR

OFFICE

OFFICE

STOR

LAN

OFFICE

120 122

124A

141A

144 127

130132

113B

6B

6A

106C

113A

ADMIN. TELCO ROOM

CABLE CHASE

TS

CONFERENCE

ROOM

RECEPTION/

LOBBY

OFFICE

VEST.

TSS SIMULATOR

141A

TS

RS

RS

R S

R S

R L

R L

RL

RL

D R

AI

N

D R

AI

N

DRAIN

DRAIN

D R

AI

N

D R

AI

N

120 141A

TSS

ROOM

CORR.

COND. PITCH TO TRAP, 1/8" PER FOOT, TYPICAL

COND. PITCH TO DRAIN 1/8" PER FOOT

SCALE: 1/8" = 1'-0"

8' 16'08'

IS

SU

ED

F

OR

ED

M

NJ

25020943

PROJECT ENGINEER, AJW-2E11A

THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM

NEWARK LIBERTY INTERNATIONAL AIRPORT

C O

N

ST

R U

C

TI

O N

EATERN SERVICE AREAATO- TECHNICAL OPERATIONS

TERMINAL ENG.

AJW-2E11A

SN

ew r-2

3-m

6.

dw g

TSS DUCTLESS SYSTEM INSTALLATION

ATCT & BASE BUILDING

GC

GS

EWR-25020943 ----

NEWARK

SB

PLATFORM MANAGER, AJW-2E11A

12/11/2025

GENERAL NOTES:

1. PIPING ELEVATION SHOWN FOR REFERENCE ONLY. CONTRACTOR TO VERIFY PIPE ELEVATION AND ACTUAL SITE CONDITION PRIOR TO INSTALLATION. CONTRACTOR TO PROVIDE REFRIGERANT PIPE

ROUTING FOR FAA APPROVAL.

2. CONTRACTOR TO PROVIDE ALL PIPING SUPPORTS AND ACCESSORIES AS REQUIRED FOR ALL NEW

INSTALLATION.

3. SECURE NEW FRAME WITH 1/2" X 3-3/4" STAINLESS STEEL WEDGE ANCHORS. SEAL ALL DRILLED

SURFACES UPON COMPLETION OF WORK.

4. PRIOR TO ANY CORE DRILLING, THE CONTRACTOR SHALL PERFORM A NON-DESTRUCTIVE WALL SCAN

TO LOCATE STEEL REINFORCEMENT, CONDUITS, AND/OR WALL OBSTRUCTIONS. CONTRACTOR TO

PROVIDE SHOP DRAWINGS FOR APPROVAL.

5. ANY WORK INVOLVING ROOF PENETRATIONS, INCLUDING BUT NOT LIMITED TO FLASHING, SEALING, OR RESTORATION, SHALL BE PERFORMED BY A CARLISLE-AUTHORIZED ROOFING APPLICATOR IN

ACCORDANCE WITH THE APPROVED CARLISLE EPDM ROOFING SYSTEM AND ITS ASSOCIATED

25-YEAR, 120-MPH WIND SPEED WARRANTY. THE CONTRACTOR SHALL COORDINATE ALL ROOFING WORK WITH THE FAA AND THE AUTHORIZED ROOFING APPLICATOR. ALL PENETRATIONS SHALL BE FLASHED AND SEALED PER CARLISLE'S APPROVED MATERIALS, AND FINAL INSTALLATION SHALL BE

SUBJECT TO INSPECTION AND ACCEPTANCE BY CARLISLE TO MAINTAIN WARRANTY VALIDITY.

AC-3BAC-3A

AC-3C

AC-3

PITCH TO DRAIN

1/8" PER FOOT, ALL WALL

MOUNTED UNITS

1 RL, 1RS LINES TO CU ABOVE DROP

CEILING. PROVIDE SEPARATION KIT

(UTP-AXO90A) AS RECOMMENDED BY

MANUFACTURER.

NEW OUTDOOR UNIT, (AC-3), ON BRACKET

SUPPORT AND SECURED TO EXTERIOR

CONCRETE WALL VIA CONCRETE

ANCHORS. SEE NOTE 3

PITCH TO EXTERIOR ROOF

STORM DRAIN, 1/8" PER

FOOT

NEW WALL-MOUNTED

INTERIOR UNITS, WITH

DRAIN PUMPS, TYPICAL

RL AND RS LINES TO

EXTERIOR UNIT

CORE CONCRETE-WALL AS

REQUIRED TO INSTALL ALL NEW

REFRIGERANT LINES, CONDENSATE

PIPES, POWER CONDUCTORS, AND

CONTROL CABLES.

DRAIN FUNNEL, SEE

DETAIL 2/M505

EXTERIOR FOYER ROOF AREA, ACCESS VIA

BASE BUILDING ROOF ACCESS LADDER

CONCRETE CORE SIZED FOR ALL

REFRIGERANT LINES, DRAIN LINES, AND AS

REQUIRED FOR POWER AND CONTROLS,

NOTE 4.

A M106

B M106

BM

~7 '-0

AC-3B AC-3C

AC-3

KEY PLAN

SCALE: 3/8" = 1'-0"

4' 6'2'02'

DRAIN COLLECTION WITH AIR-GAP,

SEE DETAIL 2/M505

THROUGH-WALL PIPES,

PATCH AND RESTORE ALL

WALL OPENINGS TO

MATCH EXISTING, TYP.

DROP CEILING, 9'-0" AFF

M505

M505

VAV-17

NEW WALL

MOUNTED T-STAT

C M106

AC-3

3'-6 1/2"

5' -4

/2

1' -6

1-2" WALL PENETRATION PIPE

SLEEVE W/ SEALED

2-4" WALL PENETRATION PIPES

SLEEVES, W/ SEALED.

ELETRICAL PIPE THROUGH

ROOF DECKING AND ROOFING

SYSTEM, SEE NOTE 5

HARD CEILING

11'-2"

0'-0"

DROP CEILING NOT

SHOW FOR CLARITY

DROP CEILING TILES

19'-2"

EXTERIOR LADDER

~12'-8"

FFE

TOP OF

PARAPET

DRAIN ELEV.

FOYER ROOF

ELEV.

~4'-0"

11'-2"

0'-0"

19'-2"

~12'-8"

FFE

TOP OF

PARAPET

DRAIN ELEV.

FOYER ROOF

ELEV.

FOYER DOOR

ENTRANCE

VAV-10

C M106

Geovanni Santos Text Box -M106

Geovanni Santos Strikethrough

DRAIN FUNNEL,

Geovanni Santos Callout

NOTE 8

Geovanni Santos Text Box PROVIDE AND INSTALL CONDENSATE PUMPS ABOVE DROP CEILING. THESE PUMPS ARE IN ADDITION TO THE INTERNAL DRAIN-PUMP AT EACH UNIT. THE ADDITIONAL PUMPS SHALL BE LITTLE GIANT MODEL VCCA-20P, OR APPROVED EQUAL. LOCATION IS APPROXIMATE, CONTRACTOR TO INSTALL PUMPS AS NEEDED TO MEET SYSTEM DRAINAGE AND LIFT REQUIREMENTS.

PROVIDE AND INSTALL PIPE MANIFOLD TO CONNECT CONDENSATE PIPES. MANIFOLD LOCATION IS APPROXIMATE, CONTRACTOR TO COORDINATE LOCATION ON SITE .

ALL CONDENSATE PUMP PIPING SHALL BE COPPER, SIZED PER MANUFACTURER'S RECOMMENDATIONS.

Geovanni Santos Strikethrough

DRAIN COLLECTION WITH AIR-GAP,

SEE DETAIL 2/M505

Geovanni Santos Strikethrough

SEE

DETAIL 2/M505

Geovanni Santos Text Box

NOTE 7

Geovanni Santos Cloud

Geovanni Santos Architect

Geovanni Santos Rectangle

Geovanni Santos Rectangle

Geovanni Santos Rectangle

Geovanni Santos Ellipse

Geovanni Santos Ellipse

Geovanni Santos Ellipse

Geovanni Santos Text Box

SEE NOTE 6.

Geovanni Santos Architect

Geovanni Santos Architect

Geovanni Santos Rectangle

Geovanni Santos Rectangle

Geovanni Santos Cloud

Geovanni Santos Rectangle

Geovanni Santos Text Box

PIPE MANIFOLD

Geovanni Santos Text Box

NOTE 6, TYP

Geovanni Santos Cloud

Geovanni Santos Cloud

Geovanni Santos Cloud

Geovanni Santos Architect

Geovanni Santos Architect

Geovanni Santos Text Box

1 4/2/2026 CONDENSATE PUMP CLARIFICATION

Geovanni Santos Text Box 6.

Geovanni Santos Text Box 7.

Geovanni Santos Text Box 8.

Geovanni Santos Cloud

Geovanni Santos Architect

Geovanni Santos Length Measurement 0'-6 3/4"

Geovanni Santos Line

Geovanni Santos

3/4" DRAIN LINES,

PITCHED 1/8" PER FOOT

TO FUNNEL ADAPTER

1" DRAIN LINE

PITCHED 1/8" PER

FOOT TO EXTERIOR

DRAIN.

3" FUNNEL ADAPTER,

MINIMUM

INSERT INTO FUNNEL

AC-3A-C

EXIST SLAB ABOVE

SEALANT AT PERIMETER, TYP

5/8" FULL GWB

EXIST CEILING

INSTALL ALL CONDUITS AND

ACCESSORIES PER MFG

INSTRUCTIONS

ALT. REFRIGERANT LINES

CONNECTIONS

BOLT A MINIMUM OF (2) 1/4"

SELF TAPPING SCREWS

INTO METAL STUD.

BRACKET CL

EQUIP. CL

INSTALL NEW PIPING ABOVE

DROP CEILING.

RESTORE TO EXISTING

CONDITIONS, INCLUDING

WALL COLOR. SEAL ALL NEW

OPENINGS.

ALL NEW CONDUITS AND

PIPES TO BE INSTALLED

INSIDE EXISTING WALL. THIS

INCLUDES ALL POWER AND

CONTROL LINES.

EXISTING METAL STUDS AT

24" O.C.

NEW EQUIPMENT BRACKET

ROOF

4"

USE 1/4" HEAVY DUTY

TOGGLE BOLTS FOR

AREAS WITHOUT METAL

STUDS. OTHERWISE USE

1/4" SELF-TAPPING

SCREWS

DROP CEILING

INSTALL NEW ALL PIPING,

POWER, AND CONTROLS

INSIDE DRYWALL. RESTORE

TO EXISTING CONDITIONS.

2'-0" TYP.

6" MIN.

SECURED TO EXTERIOR CONCRETE

WALL WITH 1/2" CONCRETE

ANCHORS, 2" MIN EMBEDMENT. USE

SS304, HILTI KWIK WEDGE ANCHOR

L-SHAPE EQUIPMENT FRAME KIT,

ANCHORED TO CONCRETE WALL

WITH A MINIMUM OF (2) 1/2"

CONCRETE ANCHORS, 2"

EMBEDMENT. USE SS304, HILTI

KWIK WEDGE ANCHORS CORE CONCRETE WALL AS

NEEDED TO INSTALL ALL

REQUIRED CONDUITS AND

ACCESSORIES. MINIMIZE

CONCRETE CORES

PRECAST CONCRETE PANELS

UNISTRUT SUPPORT

AND RUBBER PADDING,

TOP AND BOTTOM

GWB AND WALL INSULATION

~1 '-6

2" WEATHER HEAD

SS CLAMPING RING

EPDM FLASHING

SEALANT8

POLYISO

3" TYPE N DECK, 20 GAGE

WATER CUT-OFF MASTIC

2" RMC, 24" ABOVE

FINISHED ROOF

2" RMC THREADED

COUPLING WELDED TO

12"x12"x1/4" PLATE

2" RMC BRACE TO

BUILDING STRUCTURE

W24X62

28K10 JOIST

(12) Ø1/4"

SELF-DRILLING

SCREWS @ 3" OC

PROVIDE

PULL CABLE

FEMALE THREADED

COUPLING WELDED TO

12x12 BASE PLATE

UNISTRUT P1000T

CLAMPED TO BEAM

1 1/2"

PULL CABLE

NOTE 1

14'-6"

AFF

17'-4"

ROOF

UNISTRUT P2785 BEAM

CLAMP, BOTH SIDES

PIPE CLAM P2038

UNISTRUT P1000T

BEAM CLAMP

P2785

2" RMC

GENERAL NOTE

1. RESET AIR FLOW RATE FOR VAV 17 COORDINATE VALUE WITH COR.

2. NEW TSS SPLIT SYSTEM INSTALLATION

IS

SU

ED

F

OR

ED

M

NJ

25020943

PROJECT ENGINEER, AJW-2E11A

THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM

NEWARK LIBERTY INTERNATIONAL AIRPORT

FO

R

C O

N

ST

R U

C

TI

O N

EATERN SERVICE AREAATO- TECHNICAL OPERATIONS

TERMINAL ENG.

AJW-2E11A ew r-2

3-m

5.

dw g

EQUIPMENT SCHEDULES

TSS DUCTLESS SYSTEM INSTALLATION

ATCT & BASE BUILDING

EWR-25020943-M505

NEWARK

PLATFORM MANAGER, AJW-2E11A

12/11/2025

SPLIT SYSTEM AIR CONDITIONING SYSTEM OUTDOOR UNIT

OUTDOOR

UNIT AREA SERVED CAPACITY

BTUH SEER HSPF

CONNECTION

LIQ (IN)

CONNECTION

SUCT (IN)

MAX LINE

LENGTH (FT)

WEIGHT

(LB)

ELECTRICAL NOTES

VOLTS MCA

AC-3 TSS RM 141A 72000 23.9 11.0 3/8 3/4 394 470 208/230 37.7 1, 2, 3

1. BASIS OF DESIGN IS FUJITSU J-IIIL HEAT PUMP, MODEL AOU72RLAVL

2. PROVIDE ALL NECESSARY CONTROLS EQUIPMENT. THIS INCLUDES BACNET GATEWAY, MODEL UTY-VBGX

3. PROVIDE ALL PIPING AND ACCESSORIES. USE SEPARATION TUBES TO INSTALL INDOOR UNITS, MODEL UTP-AXO90A.

SPLIT SYSTEM AIR CONDITIONING SYSTEM INDOOR UNIT

INDOOR

UNIT

AREA

SERVED

CAPACITY

(COOLING)

BTUH

AIRFLOW

MAX

(CFM)

SOUND

LEVEL (dBA)

LINE SIZE

LQ, IN

LINE SIZE

SUCT, IN

COND.

PUMP LOC

COND PUMP

LIFT (IN)

COND.

TUBING ID

COND.

TUBING OD

GROSS

WEIGHT

(LB)

HxWxD POWER

SOURCE NOTES

AC-3A TSS RM 141A 18000 494 41 1/4 1/2 BUILT-IN 28 1/2 5/8 42 13x43x17 208/230 V, 1P, 60HZ 1-4

AC-3B TSS RM 141A 18000 494 41 1/4 1/2 BUILT-IN 28 1/2 5/8 42 13x43x17 208/230 V, 1P, 60HZ 1-4 AC-3C TSS RM 141A 18000 494 41 1/4 1/2 BUILT-IN 28 1/2 5/8 42 13x43x17 208/230 V, 1P, 60HZ 1-4

1. BASIS OF DESIGN IS FUJITSU INDOOR UNIT, MODEL ASUB18TLAV2

2. INCLUDE SINGLE WALL MOUNTED CONTROLLER (UTY-RNRUZ5) SET TO COMMAND ALL UNITS OPERATING IN PARALLEL

3. INCLUDE WALL MOUNTING KIT AND STEEL FRAME SUPPORT.

4. INCLUDE BACNET COMMUNICATION OPTION.

INDOOR UNIT MOUNT WITH BACKING PLATE

SCALE: 1 1/2" = 1'-0"M505

OUTDOOR UNIT MOUNT

SCALE: 1 1/2" = 1'-0"M505

INDOOR UNIT DRAIN INSTALLATION WITH 1" AIR GAP

SCALE: 1 1/2" = 1'-0"M505

2" ROOF PIPE PENETRATION

SCALE: 1 1/2" = 1'-0"M505

GENERAL NOTES:

1. ANY WORK INVOLVING ROOF PENETRATIONS, INCLUDING BUT NOT LIMITED TO FLASHING, SEALING, OR RESTORATION, SHALL BE PERFORMED BY A CARLISLE-AUTHORIZED ROOFING APPLICATOR IN

ACCORDANCE WITH THE APPROVED CARLISLE EPDM ROOFING SYSTEM AND ITS ASSOCIATED

25-YEAR, 120-MPH WIND SPEED WARRANTY. THE CONTRACTOR SHALL COORDINATE ALL ROOFING WORK WITH THE FAA AND THE AUTHORIZED ROOFING APPLICATOR. ALL PENETRATIONS SHALL BE FLASHED AND SEALED PER CARLISLE'S APPROVED MATERIALS, AND FINAL INSTALLATION SHALL BE

SUBJECT TO INSPECTION AND ACCEPTANCE BY CARLISLE TO MAINTAIN WARRANTY VALIDITY.

A-A M505

DETAIL A-A, BEAM CLAMP AND STRAP

Geovanni Santos Line

Geovanni Santos Line

Geovanni Santos Cloud

Geovanni Santos Strikethrough

INDOOR UNIT DRAIN INSTALLATION WITH 1" AIR GAP

Geovanni Santos Text Box

1 4/2/2026 CONDENSATE PUMP CLARIFICATION

Geovanni Santos Text Box DELETE THE 3" FUNNEL ADAPTER FROM THE SCOPE OF WORK. PROVIDE AND INSTALL A COPPER PIPING MANIFOLD TO COLLECT CONDENSATE FROM ALL UNITS. ROUTE ALL CONDENSATE PIPING TO THE ROOF DRAIN, MAINTAINING A MINIMUM SLOPE OF 1/8 INCH PER FOOT.

Geovanni Santos Strikethrough

INSERT INTO FUNNEL

Geovanni Santos Strikethrough

3" FUNNEL ADAPTER,

MINIMUM

Geovanni Santos Text Box 2.

Geovanni Santos Cloud

Geovanni Santos Architect

Geovanni Santos Text Box

NOTE 2

Geovanni Santos Architect

Geovanni Santos Text Box

3/8" COPPER TUBING

Geovanni Santos Strikethrough 3/4"

Geovanni Santos Text Box

PIPE MANIFOLD MINIMUM PIPE SIZES

Geovanni Santos

2025-12-11T11:36:35-0500
STEVEN M BERUBE
2025-12-11T11:56:49-0500
ALAN MARC DAGESSE
2025-12-11T11:36:59-0500
STEVEN M BERUBE
2025-12-11T11:57:02-0500
ALAN MARC DAGESSE
2025-12-11T11:37:19-0500
STEVEN M BERUBE
2025-12-11T11:57:14-0500
ALAN MARC DAGESSE

File details come from the government source that posted it. Updated .