J-5 Past Performance Questionnaire.pdf
PDF 725 KB Posted
- Attached to
- TSS Ductless System at EWR ATCT - Amendment 04
- Solicitation number
- Not on record
About this file
This is a Performance Questionnaire form used by the Federal Aviation Administration (FAA) to evaluate contractor performance during source selection processes. The form is specific to a TSS Ductless System installation project at Newark Air Traffic Control Tower (EWR ATCT) and should be completed and returned to Contracting Officer Elisha Distler at Elisha.Distler@faa.gov.
The questionnaire is divided into two sections. The offeror section requires completion of basic contract information including contractor name and address, contract number, contract initiation and completion dates, total contract value, and contract type (Fixed Price, GMP, FPI, etc.), along with a detailed project description. The evaluating organization representative section requires the evaluator to provide their name, position (Project Manager, Contracting Officer's Representative, or other), organization affiliation, phone number, and the number of months performance was monitored. The evaluation criteria consist of seven assessment categories: Quality of Products and Services, Performance (as General Contractor or Architect/Engineer), Technical Requirements, Schedule, Cost Control, Customer Satisfaction, and Overall Assessment. Each category uses a standardized rating scale of Exceptional (EX), Very Good (VG), Satisfactory (S), Marginal (MG), Unsatisfactory (US), or Not Observed (N/O). The form includes space for additional comments on a supplementary page if needed.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE QUESTIONNAIRE
Your assistance is requested in support of a source selection Please complete this Questionnaire and email or send by facsimile to Elisha Distler, Federal Aviation Administration Contracting Officer at:
Elisha.Distler@faa.gov TSS Ductless System at EWR ATCT Please ensure this form is completed, signed and return to the Contracting Officer.
TO BE COMPLETED BY OFFEROR
1. CONTRACTOR NAME & ADDRESS: 2. CONTRACT NO:
3. CONTRACT INITIATION DATE:
4. COMPLETION DATE:
5. TOTAL CONTRACT VALUE:
6. TYPE OF CONTRACT:
(Fixed Price, GMP, FPI, etc.)
7. DETAILED DESCRIPTION OF PROJECT
TO BE COMPLETED BY EVALUATING ORGANIZATION REPRESENTATIVE
8. EVALUATION: a. EVALUATOR'S NAME, POSITION (Project Manager/ COR/ Other) AND ORGANIZATION:
b. EVALUATOR'S PHONE NUMBER: c. MONTHS PERFORMANCE MONITORED BY EVALUATOR:
Please circle the response code for each topic (A – G) that best reflects your experience with this contractor.
EX = Exceptional S = Satisfactory US = Unsatisfactory VG = Very Good MG = Marginal N/O = Not Observed A. Quality of Products and Services - Assess the contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., technical, professional, environmental, or safety and health standards).
EX VG S MG US N/O
B. Performance – Assess the contractor’s performance as the General Contractor or Architect/Engineer (as appropriate) for the project.
EX VG S MG US N/O
C. Technical Requirements – Assess the contractor’s ability to fulfill the technical requirements of the contract.
EX VG S MG US N/O
D. Schedule – Assess the timeliness of contractor against the schedule of activities.
EX VG S MG US N/O
E. Cost Control – Assess the contractor’s ability to manage the contract budget and control costs.
EX VG S MG US N/O
F. Customer Satisfaction – Assess the contractor’s responsiveness to customer concerns and “user friendliness”
EX VG S MG US N/O
G. Overall Assessment.
EX VG S MG US N/O
Comments: One additional page can be added for comments, if applicable.
mailto:Robert.Higgins@faa.gov
| 1 CONTRACTOR NAME ADDRESS: |
| 2 CONTRACT NO: |
| 3 CONTRACT INITIATION DATE: |
| 4 COMPLETION DATE: |
| 5 TOTAL CONTRACT VALUE: |
| 6 TYPE OF CONTRACT Fixed Price GMP FPI etc: |
| 7 DESCRIPTION OF CONTRACT REQUIREMENTS: |
| If an Award Fee contract what was the average Award Fee: |
| Evaluator: |
| Text5: |
| Text6: |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
| Check Box49: Off |
File details come from the government source that posted it. Updated .