J-3 Drawings.pdf
PDF 1 MB Posted
- Attached to
- TSS Ductless System at EWR ATCT - Amendment 04
- Solicitation number
- Not on record
About this file
This is a technical drawing set for a ductless mini-split air conditioning system installation at Newark Liberty International Airport's ATCT (Air Traffic Control Tower) and base building. The project, identified as EWR-25020943, involves installing three wall-mounted indoor units and one outdoor unit to serve the TSS (Tower Simulation System) room, with the existing VAV-17 system relegated to backup cooling only. The outdoor unit must be mounted on a steel frame bolted to an exterior concrete wall and bonded to the roof lightning protection system, with drainage to the nearest storm drain. All refrigerant lines, condensate pipes, power conductors, and control cables must be routed through core concrete-wall penetrations, with piping pitched at 1/8" per foot to ensure proper drainage. The system requires three-phase 208/230V, 60A electrical service with a non-fused, NEMA 4X stainless steel disconnect, using 3#12 AWG wiring in 3/4" EMT for interior conduit and 3/4" rigid metal conduit with liquid-tight flexible metal conduit for exterior installation.
The system includes BACnet IO module installation and integration into the existing Building Management System (BMS), with a DDC (Direct Digital Control) connection plan requiring FAA Contracting Officer Representative (COR) approval prior to installation. The contractor must provide two weeks' notice before any FAA review or acceptance activities, with the FAA performing final commissioning. System setpoints are specified as 72°F for indoor units and 76°F for VAV-17 (heating disabled). All roof penetrations must be performed by a Carlisle-authorized roofing applicator per the approved EPDM roofing system standards to maintain the 25-year, 120-MPH wind speed warranty. The contractor is responsible for providing shop drawings, performing non-destructive wall scans prior to core drilling, and coordinating all work with FAA personnel and authorized subcontractors. The project issued for construction on December 11, 2025.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEC.
ROOM
MECH.
ROOM
CONFERENCE
ROOM
CHILLER
ROOM
ENGINE
GENERATOR
ROOM
WORK
ROOM
RECEPTION/
LOBBY
OFFICE
OFFICE VEST.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LOCKER
TOILET
WOMEN
J.C.
MEN
BREAK ROOM
TELCO
EQUIPMENT ROOM
WORK ROOM
TSS SIMULATOR
TRAINING
COPY/FAX
STORAGE
CORRIDOR
C O
R R
ID
O
R
C O
R R
ID
O
R
CORRIDOR
VEST.VEST.
UPS/SWITCHGEAR
VEST.
STOR
OFFICE
OFFICE
STOR
LAN
OFFICE
120 122
124A
141A
144 127
130132
113B
6B
6A
106C
113A
ADMIN. TELCO ROOM
CABLE CHASE
TS
M
CC
-1 M
CC
-2
EBL2A MDPG EBL2
ATS
UPS BATT
ENGINE
GENERATOR
MDPC
UPS
BYPASS
MDPE
MDPN
DP1EDP1
T-EBL1
T-EBH1
277V
ILCPBL2
BL1
T-BH1
(ABOVE)
T-BL-1
(BELOW)
BH1
EBH1
GP-1
DAY
TANK
J
MCC-2
MCC-1
MCC-1
RECEPTION/
LOBBY
OFFICE
VEST.
TSS SIMULATOR
141A
TS
IS
SU
ED
F
OR
ED
M
NJ
2520943
PROJECT ENGINEER, AJW-2E11A
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
NEWARK LIBERTY INTERNATIONAL AIRPORT
EATERN SERVICE AREAATO- TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11A
SN
ew r-2
3-e1
.d w g
TSS DUCTLESS SYSTEM INSTALLATION
ATCT & BASE BUILDING
EWR-25020943-E122 ----
NEWARK
PLATFORM MANAGER, AJW-2E11A
12/11/2025
AC-3C
AC-3A AC-3B
EXISTING VAV-17
A M106
KEY NOTES
OUTDOOR UNIT, (AC-3), SHALL BE MOUNTED ON STEEL FRAME, BOLTED TO WALL,
BONDED TO NEAREST ROOF LIGHTNING CONDUCTOR, WITH DRAIN TO NEAREST
STORM-DRAIN.
INDOOR UNITS SHALL BE POWERED VIA THE OUTDOOR UNIT PER
MANUFACTURER'S RECOMMENDATIONS. USE 3#12 AWG, PER UNIT, IN 3/4" EMT
FOR INTERIOR CONDUIT INSTALLATION AND 3/4" RIGID METAL CONDUIT, WITH
LIQUID TIGHT FLEXIBLE METAL CONDUIT, FOR EXTERIOR INSTALLATION.
INSTALL POWER CIRCUIT AND POWER DISCONNECT BETWEEN OUTDOOR UNIT
AND ELECTRICAL ROOM, ROOM 110, PANEL BL1K CK 28/30/32. PROVIDE 3-POLE 40
AMP BREAKER. RELOCATE CIRCUIT 32 TO CIRCUIT 40. RELABEL DEVICES AS
NEEDED IN ROOM 146. POWER CABLES SHALL BE (3) #8 AWG & 1 #10 AWG.
PROVIDE 1” RMC W/ GROUNDING BUSHING ON EXTERIOR INSTALLATION, AND 1”
LIQUID TIGHT WITHIN 6 FEET UNIT. USE EXISTING PULLBOX FOR NEW CIRCUIT
INSTALLATION. 1” EMT IS PERMISSIBLE FOR INTERIOR ELECTRICAL INSTALLATION.
THREE PHASE 208/230V, 60A EQUIPMENT DISCONNECT, NON-FUSED, NEMA 4X,
STAINLESS STEEL ENCLOSURE AND HARDWARE
PROVIDE AND INSTALL 2" RMC CONDUIT ACCESS THROUGH EXISTING ROOF
DECKING. INSTALLATION IS ENTIRELY ABOVE DROP CEILING AND ROOF. BOND
NEW PIPE ACCESS TO NEAREST ROOF LIGHTNING PROTECTION SYSTEM RING.
SEE DETAIL 4/M505.
ALL THREE INTERIOR UNITS ARE CONTROLLED IN PARALLEL FROM SINGLE WALL
MOUNTED THERMOSTAT (OR DDC BACNET INTERFACE).
2 2
GENERAL NOTES:
1. INSTALL (3) NEW WALL-MOUNTED INDOOR UNITS AND (1) OUTDOOR UNIT PER
MANUFACTURER'S RECOMMENDATIONS, WITH ALL GROUNDING/BONDING AND
ELECTRICAL WORK AS DEFINED IN THE FAA STANDARDS 019F, FAA-C-1217H,
AND LATEST REVISION OF NFPA 70. THE FAA WILL PERFORM COMMISSIONING
FOR ACCEPTANCE OF INSTALLED EQUIPMENT. CONTRACTOR MUST PROVIDE
A MINIMUM OF 2-WEEKS' NOTICE PRIOR TO ANY REVIEW OR ACCEPTANCE
ACTIVITIES.
2. PROVIDE AND INSTALL BACNET IO MODULE.
3. SYSTEM TO INCLUDE BACNET COMMUNICATIONS CAPABILITY. PROVIDE
CONNECTION TO EXISTING DDC SYSTEM INCLUDING BACNET POINTS AND
GRAPHICS. SUBMIT DDC CONNECTION PLAN, POINT SELECTION, AND ALL
PROPOSED GRAPHICS TO COR FOR APPROVAL PRIOR TO INSTALLATION.
SEQUENCE OF OPERATIONS:
1. THE INTENT OF THE DUCTLESS SYSTEM INSTALLATION IS FOR NEW
EQUIPMENT TO SERVE AS THE PRIMARY COOLING SOURCE IN THE TSS ROOM,
WITH THE EXISTING HVAC SYSTEM (VAV-17) SERVING AS BACKUP COOLING
ONLY.
2. THE CONTRACTOR IS ADVISED THAT BMS PROGRAMMING SERVICES WILL BE
REQUIRED TO CONNECT, PROGRAM, AND INTEGRATE THE NEW MINI-SPLIT
SYSTEM INTO THE EXISTING BMS CONTROLS SYSTEM. THIS INCLUDES
ESTABLISHING OR MODIFYING RESET SETPOINTS FOR BOTH THE NEW
DUCTLESS SYSTEM, AND EXISTING EQUIPMENT (VAV-17 AND AHU-3). THE
AHU-3 SUPPLY AIR COOLING SETPOINT TO BE CHANGED FROM "MANUAL" TO
"AUTOMATIC" MODE, ACTIVATING SUPPLY AIR RESET.
3. SET POINTS SHALL BE AS FOLLOW:
3.1. INDOOR UNIT SET POINT = 72 F
3.2. VAV-17 SET POINT = 76 F, HEATING TO BE DISABLED
AC-3
SCALE: 1/8" = 1'-0"
8' 16'08'
SCALE: 3/8" = 1'-0"
4' 6'2'02'
KEY PLAN
EXISTING BOILER
BAS PANEL
PANEL
BL1
M505
ELECTRICAL
ROOM
AC-3
AC-3
DROP CEILING AS SHOWN,
INCLUDING TSS ROOM.
EXISTING
LIGHTNING
PROTECTION
SYSTEM
ELEC.
ROOM
MECH.
ROOM
CONFERENCE
ROOM
CHILLER
ROOM
ENGINE
GENERATOR
ROOM
WORK
ROOM
RECEPTION/
LOBBY
OFFICE
OFFICE VEST.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
LOCKER
TOILET
WOMEN
J.C.
MEN
BREAK ROOM
TELCO
EQUIPMENT ROOM
WORK ROOM
TSS SIMULATOR
TRAINING
COPY/FAX
STORAGE
CORRIDOR
C O
R R
ID
O
R
C O
R R
ID
O
R
CORRIDOR
VEST.VEST.
UPS/SWITCHGEAR
VEST.
STOR
OFFICE
OFFICE
STOR
LAN
OFFICE
120 122
124A
141A
144 127
130132
113B
6B
6A
106C
113A
ADMIN. TELCO ROOM
CABLE CHASE
TS
CONFERENCE
ROOM
RECEPTION/
LOBBY
OFFICE
VEST.
TSS SIMULATOR
141A
TS
RS
RS
R S
R S
R L
R L
RL
RL
D R
AI
N
D R
AI
N
DRAIN
DRAIN
D R
AI
N
D R
AI
N
120 141A
TSS
ROOM
CORR.
COND. PITCH TO TRAP, 1/8" PER FOOT, TYPICAL
COND. PITCH TO DRAIN 1/8" PER FOOT
SCALE: 1/8" = 1'-0"
8' 16'08'
IS
SU
ED
F
OR
ED
M
NJ
25020943
PROJECT ENGINEER, AJW-2E11A
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
NEWARK LIBERTY INTERNATIONAL AIRPORT
C O
N
ST
R U
C
TI
O N
EATERN SERVICE AREAATO- TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11A
SN
ew r-2
3-m
6.
dw g
TSS DUCTLESS SYSTEM INSTALLATION
ATCT & BASE BUILDING
GC
GS
EWR-25020943 ----
NEWARK
SB
PLATFORM MANAGER, AJW-2E11A
12/11/2025
GENERAL NOTES:
1. PIPING ELEVATION SHOWN FOR REFERENCE ONLY. CONTRACTOR TO VERIFY PIPE ELEVATION AND ACTUAL SITE CONDITION PRIOR TO INSTALLATION. CONTRACTOR TO PROVIDE REFRIGERANT PIPE
ROUTING FOR FAA APPROVAL.
2. CONTRACTOR TO PROVIDE ALL PIPING SUPPORTS AND ACCESSORIES AS REQUIRED FOR ALL NEW
INSTALLATION.
3. SECURE NEW FRAME WITH 1/2" X 3-3/4" STAINLESS STEEL WEDGE ANCHORS. SEAL ALL DRILLED
SURFACES UPON COMPLETION OF WORK.
4. PRIOR TO ANY CORE DRILLING, THE CONTRACTOR SHALL PERFORM A NON-DESTRUCTIVE WALL SCAN
TO LOCATE STEEL REINFORCEMENT, CONDUITS, AND/OR WALL OBSTRUCTIONS. CONTRACTOR TO
PROVIDE SHOP DRAWINGS FOR APPROVAL.
5. ANY WORK INVOLVING ROOF PENETRATIONS, INCLUDING BUT NOT LIMITED TO FLASHING, SEALING, OR RESTORATION, SHALL BE PERFORMED BY A CARLISLE-AUTHORIZED ROOFING APPLICATOR IN
ACCORDANCE WITH THE APPROVED CARLISLE EPDM ROOFING SYSTEM AND ITS ASSOCIATED
25-YEAR, 120-MPH WIND SPEED WARRANTY. THE CONTRACTOR SHALL COORDINATE ALL ROOFING WORK WITH THE FAA AND THE AUTHORIZED ROOFING APPLICATOR. ALL PENETRATIONS SHALL BE FLASHED AND SEALED PER CARLISLE'S APPROVED MATERIALS, AND FINAL INSTALLATION SHALL BE
SUBJECT TO INSPECTION AND ACCEPTANCE BY CARLISLE TO MAINTAIN WARRANTY VALIDITY.
AC-3BAC-3A
AC-3C
AC-3
PITCH TO DRAIN
1/8" PER FOOT, ALL WALL
MOUNTED UNITS
1 RL, 1RS LINES TO CU ABOVE DROP
CEILING. PROVIDE SEPARATION KIT
(UTP-AXO90A) AS RECOMMENDED BY
MANUFACTURER.
NEW OUTDOOR UNIT, (AC-3), ON BRACKET
SUPPORT AND SECURED TO EXTERIOR
CONCRETE WALL VIA CONCRETE
ANCHORS. SEE NOTE 3
PITCH TO EXTERIOR ROOF
STORM DRAIN, 1/8" PER
FOOT
NEW WALL-MOUNTED
INTERIOR UNITS, WITH
DRAIN PUMPS, TYPICAL
RL AND RS LINES TO
EXTERIOR UNIT
CORE CONCRETE-WALL AS
REQUIRED TO INSTALL ALL NEW
REFRIGERANT LINES, CONDENSATE
PIPES, POWER CONDUCTORS, AND
CONTROL CABLES.
DRAIN FUNNEL, SEE
DETAIL 2/M505
EXTERIOR FOYER ROOF AREA, ACCESS VIA
BASE BUILDING ROOF ACCESS LADDER
CONCRETE CORE SIZED FOR ALL
REFRIGERANT LINES, DRAIN LINES, AND AS
REQUIRED FOR POWER AND CONTROLS,
NOTE 4.
A M106
B M106
BM
~7 '-0
AC-3B AC-3C
AC-3
KEY PLAN
SCALE: 3/8" = 1'-0"
4' 6'2'02'
DRAIN COLLECTION WITH AIR-GAP,
SEE DETAIL 2/M505
THROUGH-WALL PIPES,
PATCH AND RESTORE ALL
WALL OPENINGS TO
MATCH EXISTING, TYP.
DROP CEILING, 9'-0" AFF
M505
M505
VAV-17
NEW WALL
MOUNTED T-STAT
C M106
AC-3
3'-6 1/2"
5' -4
/2
1' -6
1-2" WALL PENETRATION PIPE
SLEEVE W/ SEALED
2-4" WALL PENETRATION PIPES
SLEEVES, W/ SEALED.
ELETRICAL PIPE THROUGH
ROOF DECKING AND ROOFING
SYSTEM, SEE NOTE 5
HARD CEILING
11'-2"
0'-0"
DROP CEILING NOT
SHOW FOR CLARITY
DROP CEILING TILES
19'-2"
EXTERIOR LADDER
~12'-8"
FFE
TOP OF
PARAPET
DRAIN ELEV.
FOYER ROOF
ELEV.
~4'-0"
11'-2"
0'-0"
19'-2"
~12'-8"
FFE
TOP OF
PARAPET
DRAIN ELEV.
FOYER ROOF
ELEV.
FOYER DOOR
ENTRANCE
VAV-10
C M106
3/4" DRAIN LINES,
PITCHED 1/8" PER FOOT
TO FUNNEL ADAPTER
1" DRAIN LINE
PITCHED 1/8" PER
FOOT TO EXTERIOR
DRAIN.
3" FUNNEL ADAPTER,
MINIMUM
INSERT INTO FUNNEL
AC-3A-C
EXIST SLAB ABOVE
SEALANT AT PERIMETER, TYP
5/8" FULL GWB
EXIST CEILING
INSTALL ALL CONDUITS AND
ACCESSORIES PER MFG
INSTRUCTIONS
ALT. REFRIGERANT LINES
CONNECTIONS
BOLT A MINIMUM OF (2) 1/4"
SELF TAPPING SCREWS
INTO METAL STUD.
BRACKET CL
EQUIP. CL
INSTALL NEW PIPING ABOVE
DROP CEILING.
RESTORE TO EXISTING
CONDITIONS, INCLUDING
WALL COLOR. SEAL ALL NEW
OPENINGS.
ALL NEW CONDUITS AND
PIPES TO BE INSTALLED
INSIDE EXISTING WALL. THIS
INCLUDES ALL POWER AND
CONTROL LINES.
EXISTING METAL STUDS AT
24" O.C.
NEW EQUIPMENT BRACKET
ROOF
4"
USE 1/4" HEAVY DUTY
TOGGLE BOLTS FOR
AREAS WITHOUT METAL
STUDS. OTHERWISE USE
1/4" SELF-TAPPING
SCREWS
DROP CEILING
INSTALL NEW ALL PIPING,
POWER, AND CONTROLS
INSIDE DRYWALL. RESTORE
TO EXISTING CONDITIONS.
2'-0" TYP.
6" MIN.
SECURED TO EXTERIOR CONCRETE
WALL WITH 1/2" CONCRETE
ANCHORS, 2" MIN EMBEDMENT. USE
SS304, HILTI KWIK WEDGE ANCHOR
L-SHAPE EQUIPMENT FRAME KIT,
ANCHORED TO CONCRETE WALL
WITH A MINIMUM OF (2) 1/2"
CONCRETE ANCHORS, 2"
EMBEDMENT. USE SS304, HILTI
KWIK WEDGE ANCHORS CORE CONCRETE WALL AS
NEEDED TO INSTALL ALL
REQUIRED CONDUITS AND
ACCESSORIES. MINIMIZE
CONCRETE CORES
PRECAST CONCRETE PANELS
UNISTRUT SUPPORT
AND RUBBER PADDING,
TOP AND BOTTOM
GWB AND WALL INSULATION
~1 '-6
2" WEATHER HEAD
SS CLAMPING RING
EPDM FLASHING
SEALANT8
POLYISO
3" TYPE N DECK, 20 GAGE
WATER CUT-OFF MASTIC
2" RMC, 24" ABOVE
FINISHED ROOF
2" RMC THREADED
COUPLING WELDED TO
12"x12"x1/4" PLATE
2" RMC BRACE TO
BUILDING STRUCTURE
W24X62
28K10 JOIST
(12) Ø1/4"
SELF-DRILLING
SCREWS @ 3" OC
PROVIDE
PULL CABLE
FEMALE THREADED
COUPLING WELDED TO
12x12 BASE PLATE
UNISTRUT P1000T
CLAMPED TO BEAM
1 1/2"
PULL CABLE
NOTE 1
14'-6"
AFF
17'-4"
ROOF
UNISTRUT P2785 BEAM
CLAMP, BOTH SIDES
PIPE CLAM P2038
UNISTRUT P1000T
BEAM CLAMP
P2785
2" RMC
GENERAL NOTE
1. RESET AIR FLOW RATE FOR VAV 17 COORDINATE VALUE WITH COR.
2. NEW TSS SPLIT SYSTEM INSTALLATION
IS
SU
ED
F
OR
ED
M
NJ
25020943
PROJECT ENGINEER, AJW-2E11A
THIS DRAWING PRODUCED ON THE ANE REGION AUTOCAD SYSTEM
NEWARK LIBERTY INTERNATIONAL AIRPORT
FO
R
C O
N
ST
R U
C
TI
O N
EATERN SERVICE AREAATO- TECHNICAL OPERATIONS
TERMINAL ENG.
AJW-2E11A ew r-2
3-m
5.
dw g
EQUIPMENT SCHEDULES
TSS DUCTLESS SYSTEM INSTALLATION
ATCT & BASE BUILDING
EWR-25020943-M505
NEWARK
PLATFORM MANAGER, AJW-2E11A
12/11/2025
SPLIT SYSTEM AIR CONDITIONING SYSTEM OUTDOOR UNIT
OUTDOOR
UNIT AREA SERVED CAPACITY
BTUH SEER HSPF
CONNECTION
LIQ (IN)
CONNECTION
SUCT (IN)
MAX LINE
LENGTH (FT)
WEIGHT
(LB)
ELECTRICAL NOTES
VOLTS MCA
AC-3 TSS RM 141A 72000 23.9 11.0 3/8 3/4 394 470 208/230 37.7 1, 2, 3
1. BASIS OF DESIGN IS FUJITSU J-IIIL HEAT PUMP, MODEL AOU72RLAVL
2. PROVIDE ALL NECESSARY CONTROLS EQUIPMENT. THIS INCLUDES BACNET GATEWAY, MODEL UTY-VBGX
3. PROVIDE ALL PIPING AND ACCESSORIES. USE SEPARATION TUBES TO INSTALL INDOOR UNITS, MODEL UTP-AXO90A.
SPLIT SYSTEM AIR CONDITIONING SYSTEM INDOOR UNIT
INDOOR
UNIT
AREA
SERVED
CAPACITY
(COOLING)
BTUH
AIRFLOW
MAX
(CFM)
SOUND
LEVEL (dBA)
LINE SIZE
LQ, IN
LINE SIZE
SUCT, IN
COND.
PUMP LOC
COND PUMP
LIFT (IN)
COND.
TUBING ID
COND.
TUBING OD
GROSS
WEIGHT
(LB)
HxWxD POWER
SOURCE NOTES
AC-3A TSS RM 141A 18000 494 41 1/4 1/2 BUILT-IN 28 1/2 5/8 42 13x43x17 208/230 V, 1P, 60HZ 1-4
AC-3B TSS RM 141A 18000 494 41 1/4 1/2 BUILT-IN 28 1/2 5/8 42 13x43x17 208/230 V, 1P, 60HZ 1-4 AC-3C TSS RM 141A 18000 494 41 1/4 1/2 BUILT-IN 28 1/2 5/8 42 13x43x17 208/230 V, 1P, 60HZ 1-4
1. BASIS OF DESIGN IS FUJITSU INDOOR UNIT, MODEL ASUB18TLAV2
2. INCLUDE SINGLE WALL MOUNTED CONTROLLER (UTY-RNRUZ5) SET TO COMMAND ALL UNITS OPERATING IN PARALLEL
3. INCLUDE WALL MOUNTING KIT AND STEEL FRAME SUPPORT.
4. INCLUDE BACNET COMMUNICATION OPTION.
INDOOR UNIT MOUNT WITH BACKING PLATE
SCALE: 1 1/2" = 1'-0"M505
OUTDOOR UNIT MOUNT
SCALE: 1 1/2" = 1'-0"M505
INDOOR UNIT DRAIN INSTALLATION WITH 1" AIR GAP
SCALE: 1 1/2" = 1'-0"M505
2" ROOF PIPE PENETRATION
SCALE: 1 1/2" = 1'-0"M505
GENERAL NOTES:
1. ANY WORK INVOLVING ROOF PENETRATIONS, INCLUDING BUT NOT LIMITED TO FLASHING, SEALING, OR RESTORATION, SHALL BE PERFORMED BY A CARLISLE-AUTHORIZED ROOFING APPLICATOR IN
ACCORDANCE WITH THE APPROVED CARLISLE EPDM ROOFING SYSTEM AND ITS ASSOCIATED
25-YEAR, 120-MPH WIND SPEED WARRANTY. THE CONTRACTOR SHALL COORDINATE ALL ROOFING WORK WITH THE FAA AND THE AUTHORIZED ROOFING APPLICATOR. ALL PENETRATIONS SHALL BE FLASHED AND SEALED PER CARLISLE'S APPROVED MATERIALS, AND FINAL INSTALLATION SHALL BE
SUBJECT TO INSPECTION AND ACCEPTANCE BY CARLISLE TO MAINTAIN WARRANTY VALIDITY.
A-A M505
DETAIL A-A, BEAM CLAMP AND STRAP
| 2025-12-11T11:36:35-0500 | |
| STEVEN M BERUBE |
| 2025-12-11T11:56:49-0500 | |
| ALAN MARC DAGESSE |
| 2025-12-11T11:36:59-0500 | |
| STEVEN M BERUBE |
| 2025-12-11T11:57:02-0500 | |
| ALAN MARC DAGESSE |
| 2025-12-11T11:37:19-0500 | |
| STEVEN M BERUBE |
| 2025-12-11T11:57:14-0500 | |
| ALAN MARC DAGESSE |
File details come from the government source that posted it. Updated .