This document outlines requirements for environmental remediation and monitoring services at the former Carswell Air Force Base in Fort Worth, Texas. The contractor shall conduct land use control and institutional control monitoring and reviews at one identified site, including preparing a Five-Year Review report due in November 2020. Meetings and public hearings shall be held as required to discuss technical or regulatory issues and project progress. Site access must be coordinated with the City of Fort Worth. Computer aided design drawing and geographic information system updates are also included. The related solicitation seeks proposals for Base Realignment and Closure Environmental Construction and Optimization Services in the Central South Region under solicitation number FA890320R0010 from the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency.
View the file
Other files for this federal contract opportunity
Show all 50
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final – fa8903-20-r-0010 to 2 Attachment 2 Central South Region - Carswell 5 December 2019
1.1 Scope
The former Carswell Air Force Base (AFB) (now known as Naval Air Station [NAS] Fort Worth Joint Reserve Base– Carswell Field) is not listed on the National Priorities List (NPL). Carswell AFB was closed in September 1993 and most of the property was integrated into Carswell NAS.
In addition to the requirements presented in this PWS, this scope includes the following:
· No base-specific requirements in addition to those in the PWS.
Contractors are not responsible for the following:
· Investigation and remediation of PFAS, except as noted in Attachment 1.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Final Decision Document - 12 Installation Restoration Program Sites |
| AR#561631 |
| September 2001 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8565 |
| South Central PBR |
| 9/24/2020 |
| 9/24/2020 |
2.6.1 Meeting/Teleconference Support
· Two meetings/teleconferences to discuss technical or regulatory issues and project progress and status with the Air Force and regulatory agency representatives as required.
2.6.2 Public Meetings and Hearings
· No base-specific requirements in addition to those in the PWS.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· No base-specific requirements in addition to those in the PWS; however, coordination with the City of Fort Worth, is necessary when accessing any of the sites for Five-Year Reviews and LUC/IC inspections.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements in addition to those in the PWS.
6.14 Land Use Controls (LUC)
· The Contractor shall conduct LUC/IC monitoring and reviews for the site identified in Attachment 1. Where possible, the contractor shall obtain and provide copies to the Air Force of reporting required by state covenants for applicable sites by respective property owners. An inspection report shall be provided or otherwise included in site reports by the contractor to confirm implementation of environmental restrictions. Currently, LUC/IC monitoring is held on an annual basis.
6.15 Five-Year Reviews
· The Contractor shall prepare a Five-Year Review Report for the site identified in Attachment 1. The next Five-Year Review is due in November 2020.