This document contains questions and answers regarding Solicitation Number FA890320R0010 for Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) for the Central South Region. Key details include that the solicitation is from the Department of the Air Force for environmental remediation and monitoring services at multiple installations, including Kelly Air Force Base, Homestead Air Force Base, Reese Air Force Base, Myrtle Beach Air Force Base, and England Air Force Base. The questions and answers provide clarification on the scope of work such as requirements for five-year review reports, permit renewals, well abandonment, and long-term monitoring programs. Pricing and labor rate information is also addressed.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region, newest first.
File Type Posted
05202020_FA8903-20-R-0010_Two Questions.xlsx XLSX spreadsheet
20200511_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
FA890320R0010 Central South Amendment Changes.docx DOCX document
Solicitation Amendment FA890320R00100001 SF 30 (1).pdf PDF
20200427_FA890320R0010_BECOS_Central South_Section_L Amendment 01.docx DOCX document
20200427_Central South TO2 Price Model Amendment 01.xlsx XLSX spreadsheet
FOUO_Attach2_Reference_Docs_Homestead_Central_Southv4.docx DOCX document
LA20190002 10042019 Rapides Heavy.pdf PDF
TX20190007 01042019 Bexar Travis Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Central South BECOS vf1.pdf PDF
SC20190043 10042019 Horry Heavy.pdf PDF
CO20190020 09272019 Denver Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Central South BECOS vf1.pdf PDF
LA20190051 10042019 Rapides Building.pdf PDF
TX20190270 10042019 Tarrant Building.pdf PDF
SC20190026 04192019 Horry Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Central South BECOS vf1.pdf PDF
IDIQ PWS Attch 2 Central South Acr and Def BECOS vf3.docx DOCX document
AR20190048 01042019 Mississippi County Heavy.pdf PDF
TO 1 PWS Central South BECOS vf3.docx DOCX document
20200203_FA890320R0010_Central South_BECOS_Section_M v4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Central South BECOS vf1.pdf PDF
20200131_FA890320R0010_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Central South BECOS vf1.pdf PDF
20200203_FA890320R0010_BECOS_Central South_Section_L v5.docx DOCX document
20200131_FA890320R0010_BECOS_Relevancy_PPQ v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Central South BECOS vf1.pdf PDF
20200122_Central South FFP FBLR Tables.xlsx XLSX spreadsheet
TX20190280 10042019 Lubbock Building.pdf PDF
IDIQ PWS Central South BECOS vf4.docx DOCX document
TO 2 PWS Attch 2 England Base Spec Req Central South vf2.docx DOCX document
TX20190231 10042019 Bexar Building.pdf PDF
CO20190002 09272019 Denver Heavy.pdf PDF
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Carswell Base Spec Req Central South vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Kelly Base Spec Req Central South vf3.docx DOCX document
20200109_Central South TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Central South BECOS vf1.pdf PDF
TX20190026 10042019 Tarrant Heavy.pdf PDF
TX20190271 10042019 Travis Building.pdf PDF
IDIQ PWS Attch 4 Central South Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Bergstrom Base Spec Req Central South vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Central South BECOS vf1.pdf PDF
Solicitation FA890320R0010 Central South.pdf PDF
TX20190002 01042019 Lubbock Heavy.pdf PDF
20200131_FA8903-20-R-0010_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Reese Base Spec Req Central South vf5.docx DOCX document
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Q #Document ReferenceRFP QUESTIONSDATE RCVDDocument ReferenceGOV'T RESPONSERESPONSE DATE
1TO 2 PWS Attachment 2Kelly Base Specific Req states that

“The Contractor shall prepare a Five-Year Review Report for sites identified in Attachment 1. The next Five-Year Review is due June 2025.”

Question: Will the 2030 Five Year Review be also included in this contract?

2TO 2 PWS Attachment 21. Kelly Base Specific Req states that “The Contractor may be required to prepare and to obtain regulatory approval for modifications to existing Kelly AFB RCRA Permit based upon the Contractor’s proposed technical approach for achieving the objectives of this TO.” Question: Is 2029 renewal of RCRA Permit/Compliance Plan included in this contract?
3TO 2 PWS Attachment 2Is renewal of Texas Pollution Discharge Elimination System (TPDES) permit for Kelly AFB in 2025 and 2030 included in the contract?
4TO 2 PWS Attachment 2Kelly Base Specific Req states that:

“In addition to the requirements presented in this PWS, this scope includes the following:

Properly plug and abandon all former Kelly AFB shallow groundwater wells no longer regulatory required in Zones 2, 3, 4 and 5 and outside the former Kelly AFB’s base boundary and not needed for future PFC investigations. Question: (a) How will determination be made for abandonment of wells in offsite areas in Zone 4 and 5? Is the deciding factor in determining whether wells at one of these sites can be abandoned based on whether or not the site has reached SC? (b) Will sampling of wells be required before abandonment? (c) Please provide number of wells anticipated to be abandoned in each of Zones 2, 3, 4, and 5. (d) Please provide how many wells will need to be retained for PFAS investigation

5Pricing Model:Performance Objective for Kelly AFB sites SS036 and SS050 is RA-O. Is AF anticipating in situ bioremediation injections to be performed as part of RA-O to expedite achievement of RC or SC, even though RC or SC are not Performance Objectives for these two sites under this contract?
95TO 2 PWSFor installations with active remediation systems with underground piping, is the BECOS contractor required to register utilities and LUC boundaries with utility locate services, and respond to locate requests.13-May-20TO 2 PWSYes, Contractor responsibility for utility notification and locate requirements are identified in PWS Para 2.6.5. This also applies to all remedies active or not and includes all components of the remedies including wells. Specifically for former Kelly AFB, former Kelly AFB - there is a requirement to respond to the Local Reuse Authority's locate requests to protect installed active AF remediation systems. Registering with utility locate services is not required.
96TO 2 PWSAttachment 2 Homestead AFB, Section 1.1, 1st bullet: Please confirm the referenced OWS is different than the former OWS removed in 1993-1994. If so, please provide location and background information on this OWS. It is not identified in the available historical documents.13-May-20TO 2 PWSThe OWS referenced in Attachment 2 Homestead AFB, Section 1.1 is different than the OWS removed in 1993-1994.

The OWS was discovered at 25 29'53''N, 80 23'10''W during the excavation of Area 12 at OU-28 in 2019/2020. The OWS is approximately 42 inches wide, 92 inches long, and 60 inches deep. All liquids from the OWS were removed and were disposed of as hazardous waste in January 2019 (11, 55-Gallon Drums). The excavation performed at Area 12 included the removal of most soil adjacent the OWS without impacting the integrity of the structure; therefore, there is still some soil immediately surrounding the OWS that may be impacted with contaminants. Note that a figure has been uploaded to the Google Drive for reference since the draft report of excavation of soil at OU-28 is not yet available.

97 TO 2 PWS Please identify BECOS Central South sites that are known to be contaminated with PFOA/PFOS and require special waste handling, and identify maximum concentrations for comparison to AF's guidance document (e.g., At SD019 site at Myrtle Beach, what are the current PFOS/PFOA concentrations in groundwater sampling purge water needed to identify the required disposal facility). 13-May-20 TO 2 PWS Kelly - PFOS/PFOA sampling in not currently being conducted at IRP sites included in this TO. Purge water generated from groundwater sampling activities is treated at the Zone 2 GWTP. Groundwater from several treatment systems is directed to the Zone 2 GWTP. The post UV/OX, pre-GAC treatment concentrations are 0.551 ug/L PFOS and 0.127 ug/L PFOA. There are currently no TCEQ TPDES dicharge criteria for PFOS/PFOA. The disposal or regeneration of spent GAC must comply with AF guidance.

Reese - NA, there is no groundwater monitoring required for IRP sites included in the TO. Myrtle Beach - Wells in the vicinity of Site SD019 have PFOS+PFOA (summed) levels ranging from 0.239 to 1.705 ug/L for individual monitoring well samples. For England AFB, see Final Site Inspection Report for AFFF Areas at Former England AFB, AR 592556 (7 parts).

98TO 2 PWS, Section 3.2The PWS calls for a QPP. A) please confirm the QPP is programmatic covering all installations and should be included in the CLIN1 PMP pricing or specify alternate location. B) please confirm that base/ site specific addenda are to to be included in site specific CLINs.13-May-20TO 2 PWSThe QPP is base-specific and should be included in the base year site-specific CLINs. The QPP (i.e., UFP-QAPP) is a program/technical document that undergoes Air Force and regulatory review. The PMP is programmatic for the BECOS region and undergoes Air Force review only. B) Base/site specific addenda are to be included in the site-specific CLINs in the appropriate year that the addenda is required.
99TO 2 PWSPlease confirm that 4 wells at the BH01 Area of Spill Site SS045 at England AFB are not to be included in the SS045 LTM events per the 2019 Arcadis work plans for SS045 (AR #593520). The 2019 RECAP Report recommended that 4 wells at the BH-01 Area be included in the SS045 LTM Program for sampling on an annual frequency (AR 592079).13-May-20TO 2 PWSThe four wells at BH01 Area of Spill Site SS045 will be included in the SS045 LTM events as found in the Final RECAP report BH-01 Area of Spill Site SS-045.
100TO 2 PWSIndicate whether sampling of the 4 wells at BH01 Area of Spill Site SS045 at England AFB is part of the scope of TO02.13-May-20TO 2 PWSSampling of the 4 wells at BH01 Area of Spill Site SS045 at England AFB is part of the scope of TO02.
101Section L 5.5.cPlease confirm that if an Offeror is proposing as an unpopulated JV and each member is proposing separate FBLRs, the managing member rates should be included as the prime offeror as the JV Offeror will not have separate labor rates.13-May-20Section L 5.5.cIf each member of an unpopulated JV is proposing separate FBLRs, each member proposing FBLRs shall complete a separate FBLR tab in the FFP FBLR Table.

If the JV is proposing one (1) team FBLR per LCAT for the entire team the FBLRs shall be entered in the prime tab of the FFP FBLR Table.

102Professional Compensation Plan ModelIf an Offeror's standard accounting practice is that Fringe is a sub-pool of overhead and not separately applied, please clarify whether only the fringe rate or all indirect markups should be applied to the base rate should be included in the compensation model. If only the fringe rate is applied, it will not match the FBLR.13-May-20Professional Compensation Plan ModelBase Hourly Salary and Fringe rates are NOT the entire labor burden that would be included in the FBLRs but only two (2) elements of fully burdened labor. The Compensation Plan Excel Model shall include only the fringe rate NOT other indirect markups.
103Wage DeterminationsPlease confirm whether or not SCA wage determinations (WD) will apply to categories such as engineering technician and clerical. If yes, please provide the applicable WDs.13-May-20Wage DeterminationsThe categories that do fall under SCA are incidental as they comprise less than 10% of the overall labor and therefore the SCA wage determinations are not included for the IDIQ. The company will still need to follow applicable department of labor standards for employees.