About this file

This document contains a past performance relevancy matrix and information on a solicitation for Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) in the Central South Region. The solicitation is requesting proposals from contractors to provide program management, quality assurance, regulatory interaction, stakeholder coordination, analysis, and data management services related to environmental remediation and restoration activities at multiple sites on current and former military installations. Contractors must demonstrate relevant experience in areas such as preparing documents and reports, complying with regulations during site work, implementing RCRA and CERCLA processes, working with state regulators, coordinating work across sites, and assessing, analyzing and reporting data. The solicitation was issued by the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region, newest first.
File Type Posted
05202020_FA8903-20-R-0010_Two Questions.xlsx XLSX spreadsheet
FA8903-20-R-0010_BECOS RFP Questions_05-15-20.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100002 SF 30 (002).pdf PDF
20200511_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
20200427_Central South TO2 Price Model Amendment 01.xlsx XLSX spreadsheet
FOUO_Attach2_Reference_Docs_Homestead_Central_Southv4.docx DOCX document
20200427_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100001 SF 30 (1).pdf PDF
20200427_FA890320R0010_BECOS_Central South_Section_L Amendment 01.docx DOCX document
FA890320R0010 Central South Amendment Changes.docx DOCX document
TO 2 PWS Attch 2 Kelly Base Spec Req Central South vf3.docx DOCX document
20200109_Central South TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Carswell Base Spec Req Central South vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Central South BECOS vf1.pdf PDF
TX20190026 10042019 Tarrant Heavy.pdf PDF
TX20190271 10042019 Travis Building.pdf PDF
IDIQ PWS Attch 4 Central South Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Bergstrom Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Attch 2 Reese Base Spec Req Central South vf5.docx DOCX document
Solicitation FA890320R0010 Central South.pdf PDF
TX20190002 01042019 Lubbock Heavy.pdf PDF
20200131_FA8903-20-R-0010_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Central South BECOS vf1.pdf PDF
TX20190231 10042019 Bexar Building.pdf PDF
CO20190002 09272019 Denver Heavy.pdf PDF
TO 2 PWS Attch 2 England Base Spec Req Central South vf2.docx DOCX document
IDIQ PWS Central South BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Central South BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Central South BECOS vf1.pdf PDF
20200203_FA890320R0010_BECOS_Central South_Section_L v5.docx DOCX document
20200131_FA890320R0010_BECOS_Relevancy_PPQ v2.docx DOCX document
TX20190280 10042019 Lubbock Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Central South BECOS vf1.pdf PDF
20200122_Central South FFP FBLR Tables.xlsx XLSX spreadsheet
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Central South BECOS vf1.pdf PDF
SC20190043 10042019 Horry Heavy.pdf PDF
CO20190020 09272019 Denver Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Central South BECOS vf1.pdf PDF
TX20190007 01042019 Bexar Travis Heavy.pdf PDF
LA20190051 10042019 Rapides Building.pdf PDF
TX20190270 10042019 Tarrant Building.pdf PDF
SC20190026 04192019 Horry Building.pdf PDF
LA20190002 10042019 Rapides Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Central South BECOS vf1.pdf PDF
IDIQ PWS Attch 2 Central South Acr and Def BECOS vf3.docx DOCX document
AR20190048 01042019 Mississippi County Heavy.pdf PDF
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-20-R-0010

Central South Region Past Performance Relevancy Matrix

1. Program Management and Quality Assurance

Very Relevant To be considered very relevant, Past Performance (PP) experience is demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience is demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience is demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience is demonstrated in any of the 5 criteria below.

A. Experience providing documents, technical plans, and reports that were accurate, timely and complete and demonstrated quality. (did not require excessive revision) B. Experience performing site work in compliance with required and applicable regulations. (such as, health and safety, ARARs, environmental, OSHA, state, federal, professional certifications and registrations) C. Experience performing record of decision, decision documents, feasibility studies and / or conceptual site models preparation and amendments timely, as required, and IAW regulation.

D. Experience implementing RCRA processes and / or CERCLA processes IAW regulation and protective of Human Health and the Environment (an "exceptional or very good" represents completion of combined actions / interrelated pieces of the entire the RCRA and / or CERCLA process).

E. Experience working with state regulatory processes IAW regulation and protective of Human Health and the Environment.

2. Regulatory Interaction and Stakeholder Coordination

Very Relevant To be considered very relevant, Past Performance (PP) experience is demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience is demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience is demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience is demonstrated in any of the 5 criteria below.

A. Experience working proactively and collaboratively with the Government and engaging regulatory agencies well in order to achieve goals such as project and / or performance objectives, reduced Life Cycle Costs, modification of remedies and decision documents.

B. Experience implementing and / or facilitating Community Involvement, addressing challenging stakeholders and / or collaborating with community stakeholders in such instances as public events, meetings and during work related to Site Closeout, Restoration Advisory Boards, and / or additional outreach.

C. Experience transitioning work well, providing all the required documents (such as GIS, mapping, records, and plans) to coordinate contract closeout and assist the incoming contractor successfully without major issues.

D. Experience performing an effort that required work on multiple remediation disciplines with more than (5) five sites on installations or former installations. (able to coordinate work on multiple sites and areas well) E. Experience managing environmental restoration activities on property with multiple owners / stakeholders. (such as local redevelopment authorities, private entities, federal agencies and municipalities)

3. Analysis and Data Management

Very Relevant To be considered very relevant, Past Performance (PP) experience is demonstrated in 3 or more of the 5 criteria below.

Relevant To be considered relevant, Past Performance (PP) experience is demonstrated in 2 out of the 5 criteria below.

Somewhat Relevant To be considered somewhat relevant, Past Performance (PP) experience is demonstrated in 1 out of the 5 criteria below.

Not Relevant To be considered not relevant, no Past Performance (PP) experience is demonstrated in any of the 5 criteria below.

A. Experience providing reports (such as, work plans and conceptual site models) that demonstrate knowledge and technical acumen in Environmental Remediation and / or Restoration.

B. Experience applying an innovative approach in order to accelerate site closeout at a site.

C. Experience exhibiting technical acumen in assessing, analyzing, and validating data. (quality data analysis and integrity in sampling data) D. Experience designing, installing, operating, maintaining, and / or optimizing remediation systems, such as, a pump and treat system in a manner that ensures maintenance of the selected remedy.

E. Experience consistently monitoring the current remedy progress and / or tracking site progress issues, communicating progress / metrics, and reporting on achievement of cleanup goals and performance objectives. (organized and clear metrics / reporting)

File details come from the government source that posted it. Updated .