BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region Federal contract opportunity
Solicitation number
FA890320R0010
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This document outlines requirements for environmental remediation and monitoring services at the former Brooks Air Force Base in Texas. The scope of work includes conducting land use controls and institutional controls monitoring annually for sites identified in an attachment. It also requires preparing a five-year review report for those same sites, with the next one initiated in 2020. The contractor will be responsible for subsequent five-year reviews within the period of performance under the Base Realignment and Closure Environmental Construction and Optimization Services contract for the Central South region. Coordination is necessary with the local reuse authority, the Brooks Development Authority, when accessing any sites. No additional base-specific requirements are specified beyond those in the performance work statement.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region, newest first.
File Type Posted
05202020_FA8903-20-R-0010_Two Questions.xlsx XLSX spreadsheet
20200511_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
FA890320R0010 Central South Amendment Changes.docx DOCX document
20200427_Central South TO2 Price Model Amendment 01.xlsx XLSX spreadsheet
FOUO_Attach2_Reference_Docs_Homestead_Central_Southv4.docx DOCX document
20200427_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100001 SF 30 (1).pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Central South BECOS vf1.pdf PDF
SC20190043 10042019 Horry Heavy.pdf PDF
CO20190020 09272019 Denver Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Central South BECOS vf1.pdf PDF
TX20190007 01042019 Bexar Travis Heavy.pdf PDF
LA20190051 10042019 Rapides Building.pdf PDF
TX20190270 10042019 Tarrant Building.pdf PDF
SC20190026 04192019 Horry Building.pdf PDF
LA20190002 10042019 Rapides Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Central South BECOS vf1.pdf PDF
IDIQ PWS Attch 2 Central South Acr and Def BECOS vf3.docx DOCX document
AR20190048 01042019 Mississippi County Heavy.pdf PDF
TO 1 PWS Central South BECOS vf3.docx DOCX document
20200203_FA890320R0010_Central South_BECOS_Section_M v4.docx DOCX document
TX20190231 10042019 Bexar Building.pdf PDF
CO20190002 09272019 Denver Heavy.pdf PDF
TO 2 PWS Attch 2 England Base Spec Req Central South vf2.docx DOCX document
IDIQ PWS Central South BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Central South BECOS vf1.pdf PDF
20200131_FA890320R0010_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Central South BECOS vf1.pdf PDF
20200203_FA890320R0010_BECOS_Central South_Section_L v5.docx DOCX document
20200131_FA890320R0010_BECOS_Relevancy_PPQ v2.docx DOCX document
TX20190280 10042019 Lubbock Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Central South BECOS vf1.pdf PDF
20200122_Central South FFP FBLR Tables.xlsx XLSX spreadsheet
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Kelly Base Spec Req Central South vf3.docx DOCX document
20200109_Central South TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Carswell Base Spec Req Central South vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Central South BECOS vf1.pdf PDF
TX20190026 10042019 Tarrant Heavy.pdf PDF
TX20190271 10042019 Travis Building.pdf PDF
IDIQ PWS Attch 4 Central South Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Bergstrom Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Attch 2 Reese Base Spec Req Central South vf5.docx DOCX document
Solicitation FA890320R0010 Central South.pdf PDF
TX20190002 01042019 Lubbock Heavy.pdf PDF
20200131_FA8903-20-R-0010_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Central South BECOS vf1.pdf PDF
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final – fa8903-20-r-0010 to 2 Attachment 2 Central South Region - Brooks 5 December 2019

1.1 Scope

The former Brooks Air Force Base (AFB) (now known as Brooks-City Base [i.e., Brooks]) is not listed on the National Priorities List (NPL). On 22 July 2002, Brooks AFB was transferred from federal ownership to the Brooks Development Authority (BDA), a local defense base development authority under Texas statute. As a result of the property transfer, the name of the installation changed from Brooks AFB to Brooks City-Base. At this time, the Air Force leased the occupied land and facilities on Brooks City-Base from the BDA. In 2005, Brooks City-Base was recommended for closure in the 2005 Defense Base Closure and Realignment Report (United States 2005). The Air Force mission ceased at Brooks City-Base on 15 September 2011. The BDA is developing Brooks City-Base as a business center for research and technology.

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Decision Document to Support No Further Response Action Planned, Decision Document,

IRP Site Landfill 6

AR#310
October 2000
2.
Technical Document to Support No Further Action, Decision Document,

Landfill No. 5

AR#28
June 1990

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

N/A
Work starts upon award

2.6.1 Meeting/Teleconference Support

· No base-specific requirements in addition to those in the PWS.

2.6.2 Public Meetings and Hearings

· No base-specific requirements in addition to those in the PWS.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No base-specific requirements in addition to those in the PWS; however, coordination with the local reuse authority, Brooks Development Authority (BDA), is necessary when accessing any of the sites for Five-Year Reviews and LUC/IC inspections.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.1 Land Use Controls (LUC)

· The Contractor shall conduct LUC/IC monitoring for sites identified in Attachment 1 and prepare a report. Currently, LUC/IC monitoring is held on an annual basis.

6.15 Five-Year Reviews

· The Contractor shall prepare a Five-Year Review Report for the sites identified in Attachment 1. The next Five-Year Review report included in BECOS will be initiated in 2020. The contractor is responsible for subsequent FYRs within the BECOS PoP.