About this file

This document is a Performance Work Statement (PWS) for environmental remediation and monitoring services at the former Bergstrom Air Force Base in Austin, Texas. The PWS requires the contractor to conduct land use control and institutional control monitoring annually at specified sites and prepare a report. The contractor must also prepare a Five-Year Review Report due in June 2021 for identified sites. The contractor will participate in quarterly teleconferences with USAF representatives to discuss project progress. No additional base-specific requirements or responsibilities beyond those outlined in the PWS are specified. The related solicitation is for Base Realignment and Closure Environmental Construction and Optimization Services for the Central South Region, including the former Bergstrom Air Force Base, under Solicitation Number FA890320R0010 issued by the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region, newest first.
File Type Posted
05202020_FA8903-20-R-0010_Two Questions.xlsx XLSX spreadsheet
FA8903-20-R-0010_BECOS RFP Questions_05-15-20.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100002 SF 30 (002).pdf PDF
20200511_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
20200427_Central South TO2 Price Model Amendment 01.xlsx XLSX spreadsheet
FOUO_Attach2_Reference_Docs_Homestead_Central_Southv4.docx DOCX document
20200427_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100001 SF 30 (1).pdf PDF
20200427_FA890320R0010_BECOS_Central South_Section_L Amendment 01.docx DOCX document
FA890320R0010 Central South Amendment Changes.docx DOCX document
TO 2 PWS Attch 2 Kelly Base Spec Req Central South vf3.docx DOCX document
20200109_Central South TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Carswell Base Spec Req Central South vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Central South BECOS vf1.pdf PDF
TX20190026 10042019 Tarrant Heavy.pdf PDF
TX20190271 10042019 Travis Building.pdf PDF
IDIQ PWS Attch 4 Central South Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Reese Base Spec Req Central South vf5.docx DOCX document
Solicitation FA890320R0010 Central South.pdf PDF
TX20190002 01042019 Lubbock Heavy.pdf PDF
20200131_FA8903-20-R-0010_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Central South BECOS vf1.pdf PDF
TX20190231 10042019 Bexar Building.pdf PDF
CO20190002 09272019 Denver Heavy.pdf PDF
TO 2 PWS Attch 2 England Base Spec Req Central South vf2.docx DOCX document
IDIQ PWS Central South BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Central South BECOS vf1.pdf PDF
20200131_FA890320R0010_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Central South BECOS vf1.pdf PDF
20200203_FA890320R0010_BECOS_Central South_Section_L v5.docx DOCX document
20200131_FA890320R0010_BECOS_Relevancy_PPQ v2.docx DOCX document
TX20190280 10042019 Lubbock Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Central South BECOS vf1.pdf PDF
20200122_Central South FFP FBLR Tables.xlsx XLSX spreadsheet
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
FL20190215 10252019 Miami-Dade Building.pdf PDF
TO 2 PWS Attch 2 Myrtle Beach Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Attch 1 Central South Site List BECOS vf8.xlsx XLSX spreadsheet
FL20190125 11012019 Miami-Dade Heavy.pdf PDF
AR20190022 10252019 Mississippi County Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Central South BECOS vf1.pdf PDF
Central South IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Homestead Base Spec Req Central South vf2.docx DOCX document
TO 2 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ PWS Attch 3 Central South Del Rev Process BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Eaker Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Central South BECOS vf3.docx DOCX document
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final – fa8903-20-r-0010 to 2 Attachment 2 Central South Region - Bergstrom 5 December 2019

1.1 Scope

The former Bergstrom Air Force Base (AFB) is located in Austin, Texas. Bergstrom AFB was closed on 30 September 1993. Whole-base transfer completed in August 2005. The City of Austin now operates Bergstrom International Airport on 2,864 aces that reverted to the city.

In addition to the requirements presented in this PWS, this scope includes the following:

· No base-specific requirements in addition to those in the PWS.

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Technical Report, Final Closure of North Landfills 1 and 2
AR#491
August 1999
2.
Final Decision Document, LF-1
AR#519
July 1990
3.
Final Decision Document, LF-2
AR#520
July 1990
4.
Technical Report Final Closure of Combined Southeast Landfills
AR#s480-485
August 1999
5.
Draft Decision Document, Combined Southeast Landfill Area and South Fork Drainage Ditch, 1996
AR#375
August 1996
6.
Final Decision Document, SS-14
AR#524
July 1990
7.
Closure Report for Installation Restoration Program (IRP) Site SD- 17
AR#412
August 1997
8.
RCRA Facility Assessment/RCRA Facility Investigation, Site Closure Report, Solid Waste Management Unit 9, FT-23
AR#s476.1 & 476.2
December 1998
9.
Final Decision Document, Fire Department Training Area, FT-23
AR#212
April 1992
10.
RCRA Facility Assessment/RCRA Facility Investigation Draft Final Corrective Measures Study for Solid Waste Management Unit 76 Area 1 and Area 2
AR#588
July 1998

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

FA8903-09-D-8565-0007
Performance-Based Remediation at Former Bergstrom AFB, TX, Former Carswell AFB, TX, Former Eaker AFB, AR, Former Homestead AFB, FL, Former Richards-Gebaur AFB, MO
9/24/2020
9/24/2020
W9128F-14-D-0036
Air Force Military Munitions Response Program Site Inspections, Former Bergstrom AFB, TX, and Former Eaker AFB, AR
9/30/2020
9/30/2020

2.6.1 Meeting/Teleconference Support

· The Contractor participate in Teleconferences with the United States Air Force (USAF) representatives to discuss the progress toward accomplishing project objectives. Currently, teleconferences are held on a quarterly basis.

2.6.2 Public Meetings and Hearings

· No base-specific requirements in addition to those in the PWS.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No base-specific requirements in addition to those in the PWS.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· The Contractor shall conduct LUC/IC monitoring at sites listed in Attachment 1 and prepare a report. The first LUC/IC monitoring event is due in 2020. Currently, LUC/IC monitoring is held on an annual basis.

6.15 Five-Year Reviews

· The Contractor shall prepare a Five-Year Review Report for sites identified in Attachment 1. The next Five-Year Review Report is due June 2021.