This document is a Performance Work Statement (PWS) for environmental remediation and monitoring services at the former Bergstrom Air Force Base in Austin, Texas. The PWS requires the contractor to conduct land use control and institutional control monitoring annually at specified sites and prepare a report. The contractor must also prepare a Five-Year Review Report due in June 2021 for identified sites. The contractor will participate in quarterly teleconferences with USAF representatives to discuss project progress. No additional base-specific requirements or responsibilities beyond those outlined in the PWS are specified. The related solicitation is for Base Realignment and Closure Environmental Construction and Optimization Services for the Central South Region, including the former Bergstrom Air Force Base, under Solicitation Number FA890320R0010 issued by the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency.
View the file
Other files for this federal contract opportunity
Show all 50
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final – fa8903-20-r-0010 to 2 Attachment 2 Central South Region - Bergstrom 5 December 2019
1.1 Scope
The former Bergstrom Air Force Base (AFB) is located in Austin, Texas. Bergstrom AFB was closed on 30 September 1993. Whole-base transfer completed in August 2005. The City of Austin now operates Bergstrom International Airport on 2,864 aces that reverted to the city.
In addition to the requirements presented in this PWS, this scope includes the following:
· No base-specific requirements in addition to those in the PWS.
Contractors are not responsible for the following:
· Investigation and remediation of PFAS, except as noted in Attachment 1.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Technical Report, Final Closure of North Landfills 1 and 2 |
| AR#491 |
| August 1999 |
| 2. |
| Final Decision Document, LF-1 |
| AR#519 |
| July 1990 |
| 3. |
| Final Decision Document, LF-2 |
| AR#520 |
| July 1990 |
| 4. |
| Technical Report Final Closure of Combined Southeast Landfills |
| AR#s480-485 |
| August 1999 |
| 5. |
| Draft Decision Document, Combined Southeast Landfill Area and South Fork Drainage Ditch, 1996 |
| AR#375 |
| August 1996 |
| 6. |
| Final Decision Document, SS-14 |
| AR#524 |
| July 1990 |
| 7. |
| Closure Report for Installation Restoration Program (IRP) Site SD- 17 |
| AR#412 |
| August 1997 |
| 8. |
| RCRA Facility Assessment/RCRA Facility Investigation, Site Closure Report, Solid Waste Management Unit 9, FT-23 |
| AR#s476.1 & 476.2 |
| December 1998 |
| 9. |
| Final Decision Document, Fire Department Training Area, FT-23 |
| AR#212 |
| April 1992 |
| 10. |
| RCRA Facility Assessment/RCRA Facility Investigation Draft Final Corrective Measures Study for Solid Waste Management Unit 76 Area 1 and Area 2 |
| AR#588 |
| July 1998 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8565-0007 |
| Performance-Based Remediation at Former Bergstrom AFB, TX, Former Carswell AFB, TX, Former Eaker AFB, AR, Former Homestead AFB, FL, Former Richards-Gebaur AFB, MO |
| 9/24/2020 |
| 9/24/2020 |
| W9128F-14-D-0036 |
| Air Force Military Munitions Response Program Site Inspections, Former Bergstrom AFB, TX, and Former Eaker AFB, AR |
| 9/30/2020 |
| 9/30/2020 |
2.6.1 Meeting/Teleconference Support
· The Contractor participate in Teleconferences with the United States Air Force (USAF) representatives to discuss the progress toward accomplishing project objectives. Currently, teleconferences are held on a quarterly basis.
2.6.2 Public Meetings and Hearings
· No base-specific requirements in addition to those in the PWS.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· No base-specific requirements in addition to those in the PWS.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements in addition to those in the PWS.
6.14 Land Use Controls (LUC)
· The Contractor shall conduct LUC/IC monitoring at sites listed in Attachment 1 and prepare a report. The first LUC/IC monitoring event is due in 2020. Currently, LUC/IC monitoring is held on an annual basis.
6.15 Five-Year Reviews
· The Contractor shall prepare a Five-Year Review Report for sites identified in Attachment 1. The next Five-Year Review Report is due June 2021.