This document is a WebAIM Short Form Task Group Instruction (TGI) for a static load test of a lifeline stanchion on the USS Blue Ridge (LCC-19), dated 12-MAR-2025. The TGI references technical procedure TP 61211-2-701KTR and outlines three work tasks: (1) Contractor work to accomplish and document the load test, (2) Quality Assurance (QA) work to verify the load test, and (3) Support/Facility (S/F) work to document the test. The document includes sections for work certification signatures, references, task descriptions, and a material list, though no specific materials are listed in this instance. The TGI is part of the broader USS Blue Ridge 5C1 Dry-Docking Selected Restricted Availability (DSRA) Modernization Bundle 4 project, which will be performed at the US Naval Base Yokosuka, Ship Repair Facility - Japan Regional Maintenance Center.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
12-MAR-2025 1351
20.14.15.2.9020 (September 2024) ICN: 3819P58316 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 61211-2-701KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 61211
CU PHASE TITLE: RAIL, STANCHION, LIFELINE (LOAD TEST), S/A 81028K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EXSAZC05
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
SUSA, KOUTARO 246.2 3152431107 06-MAR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 12-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSA-ZC05
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
KONDO, SHINYA U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
583G2116
Static Load Test for Liferail Stanchion - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
12-MAR-2025 1351
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P58316 KeyOp: T01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 61211-2-701KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 61211
CU PHASE TITLE: RAIL, STANCHION, LIFELINE (LOAD TEST), S/A 81028K - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 61211-2-701KTR RAIL, STANCHION, LIFELINE
(LOAD TEST)
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the load test in accordance with reference, TP
61211-2-701KTR.
22/KE PC N
(G) QA work:
Accomplish/document the load test in accordance with reference, TP
61211-2-701KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the load test in accordance with reference, TP
61211-2-701KTR.
/ EXSA N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P58316 KEY OP: T01
File details come from the government source that posted it. Updated .