TGI_3819P58316T01_c0v0_redact.pdf

PDF 97 KB Posted

Attached to
USS BLUE RIDGE 5C1 DSRA MODERNIZATION BUNDLE 4
Solicitation number
N6264925RA052
Issued by

About this file

This document is a WebAIM Short Form Task Group Instruction (TGI) for a static load test of a liferail stanchion on the USS Blue Ridge, dated 12-MAR-2025. The task group instruction (TGI No. 61211-2-701KTR) covers a load test for a rail, stanchion, and lifeline system, specifically for S/A 81028K - KTR. The document includes task descriptions for three work types: contractor work (22/KE), QA work (33/G1), and S/F work (EXSA), all of which involve accomplishing and documenting the load test in accordance with the referenced technical procedure (TP 61211-2-701KTR). Key personnel include Koutaro Susa (preparer), Jason Y. Ohta (approver), and Shinya Kondo (zone manager), with the work to be performed on the USS Blue Ridge (LCC-19) for project 19P, system 61211.

View the file

Other files

File Type Posted
N6264925RA0520004.pdf PDF
BLR_5C1_SHIPALT_BUNDLE 4 CDRL rev.pdf PDF
N6264925RA0520003.pdf PDF
TGI_3819P58316A01_c0v0_redact.pdf PDF
TGI_3819P51602T01_c0v0_redact.pdf PDF
TGI_3819P51602A02_c2v1_redact.pdf PDF
TGI_3819P51602T06_c0v0_redact.pdf PDF
TGI_3819P55107T09_c0v0_redact.pdf PDF
TGI_3819P55107T07_c0v0_redact.pdf PDF
TGI_3819P51602T04_c0v0_redact.pdf PDF
TGI_3819P55107T06_c0v0_redact.pdf PDF
TGI_3819P55107T04_c0v0_redact.pdf PDF
TGI_3819P51602T12_c0v0_redact.pdf PDF
TGI_3819P51602T09_c0v0_redact.pdf PDF
TGI_3819P51602T02_c1v1_redact.pdf PDF
N6264925RA0520002.pdf PDF
TGI_3819P55107T08_c0v0_redact.pdf PDF
TGI_3819P55107T05_c0v0_redact.pdf PDF
TGI_3819P51602T03_c0v0_redact.pdf PDF
TGI_3819P51602T10_c0v0_redact.pdf PDF
TGI_3819P55107T01_c0v0_redact.pdf PDF
TGI_3819P51602T07_c0v0_redact.pdf PDF
TGI_3819P51602T11_c0v0_redact.pdf PDF
TGI_3819P51602T05_c0v0_redact.pdf PDF
TGI_3819P55107A01_c0v0_redact.pdf PDF
TGI_3819P51602T08_c0v0_redact.pdf PDF
TGI_3819P55107T03_c0v0_redact.pdf PDF
N6264925RA0520001.pdf PDF
TGI_3819P51602T08_c0v0_redact.pdf PDF
TGI_3819P51602A02_c2v1_redac.pdf PDF
TGI_3819P55107T09_c0v0_redac.pdf PDF
TGI_3819P51602T07_c0v0_redact.pdf PDF
Attachment V Contract data.pdf PDF
TGI_3819P55107T06_c0v0_redact.pdf PDF
2.01 N6264925RA052 Solicitation.pdf PDF
Attachment IV RFI.docx DOCX document
Attachment VIII Source of Repair Instruction.pdf PDF
TGI_3819P51602T04_c0v0_redact.pdf PDF
TGI_3819P51602T06_c0v0_redact.pdf PDF
TGI_3819P51602T01_c0v0_redact.pdf PDF
TGI_3819P51602T12_c0v0_redact.pdf PDF
TGI_3819P51602T03_c0v0_redact.pdf PDF
Attachment II Proposal Sheet Generator v1.2 .xlsx XLSX spreadsheet
TGI_3819P55107T01_c0v0_redact.pdf PDF
TGI_3819P55107T07_c0v0_redact.pdf PDF
TGI_3819P55107T05_c0v0_redact.pdf PDF
TGI_3819P51602T05_c0v0_redact.pdf PDF
TGI_3819P55107A01_c0v0_redact.pdf PDF
TGI_3819P55107T04_c0v0_redact.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

12-MAR-2025 1351

20.14.15.2.9020 (September 2024) ICN: 3819P58316 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 61211-2-701KTR TT T 7 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 61211

CU PHASE TITLE: RAIL, STANCHION, LIFELINE (LOAD TEST), S/A 81028K - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EXSAZC05

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

SUSA, KOUTARO 246.2 3152431107 06-MAR-2025

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 12-MAR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSA-ZC05

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

KONDO, SHINYA U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

583G2116

Static Load Test for Liferail Stanchion - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

12-MAR-2025 1351

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P58316 KeyOp: T01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 61211-2-701KTR TT T 7 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 61211

CU PHASE TITLE: RAIL, STANCHION, LIFELINE (LOAD TEST), S/A 81028K - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 61211-2-701KTR RAIL, STANCHION, LIFELINE

(LOAD TEST)

LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the load test in accordance with reference, TP

61211-2-701KTR.

22/KE PC N

(G) QA work:

Accomplish/document the load test in accordance with reference, TP

61211-2-701KTR.

33/G1 QA N

(S) S/F work:

Accomplish/document the load test in accordance with reference, TP

61211-2-701KTR.

/ EXSA N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P58316 KEY OP: T01

File details come from the government source that posted it. Updated .