This document is a WebAIM Short Form Task Group Instruction (TGI) for a Modular Refrigeration Unit tightness and operational test on the USS Blue Ridge (LCC-19). The TGI is dated 13-MAR-2025 with the reference number 51611-3-313KTR and is associated with Project 19P, System 51611. The document outlines specific tasks for three work groups: Contractor (22/KE), Quality Assurance (33/G1), and Ship's Force (EXSA), each required to accomplish and document the tightness and operational test in accordance with the referenced technical procedure TP 51611-3-313KTR. The document is marked FOUO (For Official Use Only) and contains detailed administrative information including preparation, approval, and concurrence details for the task group instruction.

View the file

Other files

File Type Posted
BLR_5C1_SHIPALT_BUNDLE 4 CDRL rev.pdf PDF
N6264925RA0520004.pdf PDF
N6264925RA0520003.pdf PDF
TGI_3819P58316T01_c0v0_redact.pdf PDF
TGI_3819P55107A01_c0v0_redact.pdf PDF
TGI_3819P55107T03_c0v0_redact.pdf PDF
TGI_3819P51602T11_c0v0_redact.pdf PDF
TGI_3819P51602T08_c0v0_redact.pdf PDF
TGI_3819P51602T05_c0v0_redact.pdf PDF
TGI_3819P51602A02_c2v1_redact.pdf PDF
TGI_3819P58316A01_c0v0_redact.pdf PDF
TGI_3819P55107T05_c0v0_redact.pdf PDF
TGI_3819P55107T09_c0v0_redact.pdf PDF
TGI_3819P51602T09_c0v0_redact.pdf PDF
TGI_3819P55107T08_c0v0_redact.pdf PDF
TGI_3819P55107T01_c0v0_redact.pdf PDF
TGI_3819P51602T07_c0v0_redact.pdf PDF
TGI_3819P51602T12_c0v0_redact.pdf PDF
TGI_3819P51602T04_c0v0_redact.pdf PDF
TGI_3819P51602T01_c0v0_redact.pdf PDF
N6264925RA0520002.pdf PDF
N6264925RA0520001.pdf PDF
TGI_3819P58316A01_c0v0_redact.pdf PDF
TGI_3819P51602A02_c2v1_redac.pdf PDF
TGI_3819P51602T09_c0v0_redact.pdf PDF
TGI_3819P51602T10_c0v0_redact.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
TGI_3819P55107T03_c0v0_redact.pdf PDF
TGI_3819P55107T04_c0v0_redact.pdf PDF
TGI_3819P51602T08_c0v0_redact.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
Attachment III GFP_List_rev1.xlsx XLSX spreadsheet
TGI_3819P55107A01_c0v0_redact.pdf PDF
TGI_3819P58316T01_c0v0_redact.pdf PDF
TGI_3819P55107T06_c0v0_redact.pdf PDF
TGI_3819P55107T08_c0v0_redac.pdf PDF
TGI_3819P55107T09_c0v0_redac.pdf PDF
TGI_3819P51602T07_c0v0_redact.pdf PDF
TGI_3819P51602T11_c0v0_redact.pdf PDF
TGI_3819P51602T06_c0v0_redact.pdf PDF
TGI_3819P51602T01_c0v0_redact.pdf PDF
Exhibit (A) CDRL BUNDLE 4 signed.pdf PDF
Attachment V Contract data.pdf PDF
2.01 N6264925RA052 Solicitation.pdf PDF
TGI_3819P55107T01_c0v0_redact.pdf PDF
TGI_3819P55107T07_c0v0_redact.pdf PDF
TGI_3819P55107T05_c0v0_redact.pdf PDF
TGI_3819P51602T05_c0v0_redact.pdf PDF
TGI_3819P51602T03_c0v0_redact.pdf PDF
TGI_3819P51602T02_c1v1_redact.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

13-MAR-2025 1033

20.14.15.2.9020 (September 2024) ICN: 3819P51602 KeyOp: T04

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51611-3-313KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51611

CU PHASE TITLE: MODULAR REFRIGERATION UNIT 6-53-3 (OP), S/A 83424K - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EXSAZC54

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

MIZUSHIMA, MASAKI 246.2 3152434112 25-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 12-MAR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSA-ZC54

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

516G1002

Tightness & Operational Test for MODULAR REFRIGERATION UNIT - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

13-MAR-2025 1033

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51602 KeyOp: T04

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51611-3-313KTR TT T 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 51611

CU PHASE TITLE: MODULAR REFRIGERATION UNIT 6-53-3 (OP), S/A 83424K - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 51611-3-313KTR MODULAR REFRIGERATION

UNIT (T & OP) - KTR

LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51611-3-313KTR.

22/KE PC N

(G) QA work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51611-3-313KTR.

33/G1 QA N

(S) S/F work:

Accomplish/document the tightness & operational test in accordance with reference, TP 51611-3-313KTR.

/ EXSA N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P51602 KEY OP: T04

File details come from the government source that posted it. Updated .